  "name": "Time for scour to reach maximum depth under constant flow, by bed material",
  "description": "Compiled from the scour-rate statement in Section 3.1 of FHWA HEC-18 (fifth edition, 2012): the order of magnitude of time to maximum scour depth under constant flow conditions, by bed material class. Real bridge crossings may need several floods to reach maximum scour.",
  "page": "https://casrai.org/guides/bridge-scour",
  "publisher": "CASRAI",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "dateModified": "2026-11-18T04:10:25Z",
  "temporalCoverage": "2012",
  "spatialCoverage": "United States",
  "columns": [
    {
      "name": "Bed material",
      "unit": "",
      "description": ""
    },
    {
      "name": "Material class",
      "unit": "",
      "description": ""
    },
    {
      "name": "Time to maximum scour",
      "unit": "",
      "description": "Order of magnitude under constant flow, as stated in HEC-18"
    }
  ],
  "rows": [
    {
      "Bed material": "Sand and gravel",
      "Material class": "Loose granular soil",
      "Time to maximum scour": "Hours"
    },
    {
      "Bed material": "Cohesive bed material",
      "Material class": "Cohesive soil",
      "Time to maximum scour": "Days"
    },
    {
      "Bed material": "Glacial till, sandstone and shale",
      "Material class": "Cemented soil and rock",
      "Time to maximum scour": "Months"
    },
    {
      "Bed material": "Limestone",
      "Material class": "Rock",
      "Time to maximum scour": "Years"
    },
    {
      "Bed material": "Dense granite",
      "Material class": "Rock",
      "Time to maximum scour": "Centuries"
    }
  ],
  "sources": [
    {
      "title": "FHWA HEC-18 Evaluating Scour at Bridges, 5th ed. (FHWA-HIF-12-003)",
      "url": "https://www.fhwa.dot.gov/engineering/hydraulics/pubs/hif12003.pdf",
      "accessed": "2026-11-18"
    }
  ]
}