{
  "name": "Calibration-status identification across four published programs",
  "description": "Original comparison of equipment identification, dates and record access in WHO LQSI guidance, EPA field procedures, the DOE LEHR project plan and a TNI interpretation. Each row identifies its source and scope; these provisions are not interchangeable universal requirements.",
  "page": "https://casrai.org/guides/calibration-sticker",
  "publisher": "CASRAI",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "dateModified": "2026-11-17T02:31:02Z",
  "temporalCoverage": null,
  "spatialCoverage": null,
  "columns": [
    {
      "name": "Source and scope",
      "unit": "",
      "description": ""
    },
    {
      "name": "Identification approach",
      "unit": "",
      "description": ""
    },
    {
      "name": "Dates or status information",
      "unit": "",
      "description": ""
    },
    {
      "name": "Record relationship",
      "unit": "",
      "description": ""
    },
    {
      "name": "Source URL",
      "unit": "",
      "description": ""
    }
  ],
  "rows": [
    {
      "Source and scope": "WHO LQSI equipment-labeling activity",
      "Identification approach": "Permanent equipment code; optional second service label",
      "Dates or status information": "Optional service label: last maintenance/calibration and next service",
      "Record relationship": "Code connects equipment to its register and archive",
      "Source URL": "https://extranet.who.int/lqsi/node/125"
    },
    {
      "Source and scope": "EPA QA Field Activities Procedure, section 5.6",
      "Identification approach": "Label, code or otherwise identify calibration status",
      "Dates or status information": "Record calibration dates/results and next due date",
      "Record relationship": "Equipment record includes unique ID, reports, certificates and project use",
      "Source URL": "https://www.epa.gov/system/files/documents/2025-07/epa-qa-field-activities-procedure.pdf"
    },
    {
      "Source and scope": "DOE LEHR project QAPP, section 8.5.2",
      "Identification approach": "Label equipment requiring periodic calibration",
      "Dates or status information": "Equipment ID, current calibration date and next calibration due date",
      "Record relationship": "Readily available records and calibration documents if label cannot attach",
      "Source URL": "https://lmpublicsearch.lm.doe.gov/lmsites/s06784_lehr%20qapp.pdf"
    },
    {
      "Source and scope": "TNI interpretation 392: 2016 V1M2 section 5.5.8",
      "Identification approach": "Analytical equipment may use linked analytical records",
      "Dates or status information": "Calibration status must be readily available",
      "Record relationship": "Examples include run logs and data packets when physical labeling is impracticable",
      "Source URL": "https://nelac-institute.org/content/load_sir.php?SIR=392"
    }
  ],
  "sources": [
    {
      "title": "WHO LQSI: Label all equipment in accordance with the codes in the inventory list",
      "url": "https://extranet.who.int/lqsi/node/125",
      "accessed": "2026-11-16"
    },
    {
      "title": "EPA QA Field Activities Procedure, CIO 2105-P-02.2",
      "url": "https://www.epa.gov/system/files/documents/2025-07/epa-qa-field-activities-procedure.pdf",
      "accessed": "2026-11-16"
    },
    {
      "title": "DOE: Quality Assurance Project Plan for LEHR, August 2021",
      "url": "https://lmpublicsearch.lm.doe.gov/lmsites/s06784_lehr%20qapp.pdf",
      "accessed": "2026-11-16"
    },
    {
      "title": "The NELAC Institute: Standard Interpretation 392, 2016 V1M2 5.5.8",
      "url": "https://nelac-institute.org/content/load_sir.php?SIR=392",
      "accessed": "2026-11-16"
    }
  ]
}