{
  "name": "US federal mine reclamation requirements compared: BLM hardrock and OSMRE coal regimes",
  "description": "Requirements on definition, timing, landform, stability, financial guarantees and bond release compiled from five sections of the Code of Federal Regulations (43 CFR 3809 and 30 CFR 800 and 816) and organised by regime with exact citations.",
  "page": "https://casrai.org/guides/mine-reclamation",
  "publisher": "CASRAI",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "dateModified": "2026-11-28T08:40:00Z",
  "temporalCoverage": "2026",
  "spatialCoverage": "United States",
  "columns": [
    {
      "name": "Requirement",
      "unit": "",
      "description": ""
    },
    {
      "name": "Regime",
      "unit": "",
      "description": ""
    },
    {
      "name": "CFR citation",
      "unit": "",
      "description": ""
    },
    {
      "name": "Topic",
      "unit": "",
      "description": ""
    }
  ],
  "rows": [
    {
      "Requirement": "Reclamation defined as measures to meet performance standards and BLM conditions",
      "Regime": "BLM hardrock (public lands)",
      "CFR citation": "43 CFR 3809.5",
      "Topic": "Definition"
    },
    {
      "Requirement": "Reclaim at earliest economically and technically feasible time",
      "Regime": "BLM hardrock (public lands)",
      "CFR citation": "43 CFR 3809.420(a)(5)",
      "Topic": "Timing"
    },
    {
      "Requirement": "Save topsoil for final application after reshaping",
      "Regime": "BLM hardrock (public lands)",
      "CFR citation": "43 CFR 3809.420(b)(3)(ii)",
      "Topic": "Reclamation element"
    },
    {
      "Requirement": "Notify authorized officer when reclamation is complete for inspection",
      "Regime": "BLM hardrock (public lands)",
      "CFR citation": "43 CFR 3809.420(b)(3)(iii)",
      "Topic": "Inspection"
    },
    {
      "Requirement": "Guarantee reflects cost of reclamation if BLM hires a third-party contractor",
      "Regime": "BLM hardrock (public lands)",
      "CFR citation": "43 CFR 3809.552(a)",
      "Topic": "Financial guarantee"
    },
    {
      "Requirement": "Trust fund or other mechanism for long-term water treatment or post-mining maintenance where BLM identifies a need",
      "Regime": "BLM hardrock (public lands)",
      "CFR citation": "43 CFR 3809.552(c)",
      "Topic": "Financial guarantee"
    },
    {
      "Requirement": "Backfill and grade to approximate original contour, subject to listed exceptions",
      "Regime": "Coal surface mining (federal program)",
      "CFR citation": "30 CFR 816.102(a)(1), (k)",
      "Topic": "Landform"
    },
    {
      "Requirement": "Slopes not steeper than angle of repose or lesser angle for a 1.3 minimum long-term static safety factor",
      "Regime": "Coal surface mining (federal program)",
      "CFR citation": "30 CFR 816.102(a)(3)",
      "Topic": "Stability"
    },
    {
      "Requirement": "Phase I bond release after backfilling, regrading and drainage control: up to 60 percent",
      "Regime": "Coal surface mining (federal program)",
      "CFR citation": "30 CFR 800.40",
      "Topic": "Bond release"
    },
    {
      "Requirement": "Phase III release not before the operator-responsibility period under 816.116/817.116 expires",
      "Regime": "Coal surface mining (federal program)",
      "CFR citation": "30 CFR 800.40",
      "Topic": "Bond release"
    }
  ],
  "sources": [
    {
      "title": "43 CFR 3809.5 Definitions",
      "url": "https://www.law.cornell.edu/cfr/text/43/3809.5",
      "accessed": "2026-11-13"
    },
    {
      "title": "43 CFR 3809.420 Performance standards",
      "url": "https://www.law.cornell.edu/cfr/text/43/3809.420",
      "accessed": "2026-11-13"
    },
    {
      "title": "43 CFR 3809.552 Financial guarantee amount",
      "url": "https://www.law.cornell.edu/cfr/text/43/3809.552",
      "accessed": "2026-11-13"
    },
    {
      "title": "30 CFR 800.40 Requirements to release performance bonds",
      "url": "https://www.law.cornell.edu/cfr/text/30/800.40",
      "accessed": "2026-11-13"
    },
    {
      "title": "30 CFR 816.102 Backfilling and grading",
      "url": "https://www.law.cornell.edu/cfr/text/30/816.102",
      "accessed": "2026-11-13"
    }
  ]
}