Skip to main content
v2026.11,610 entries · CC-BY 4.0
LAC HealthLaboratory & Research SupplyReagents, PPE & instruments — chain-of-custody documented.Fast, traceable sourcing built for regulated research environments, from bench consumables to instrumentation.Shop lac.us CodeCASRAIlac.us

Federal Procurement for Research Institutions: The Full Decision Sequence

The single map for federal-award procurement: which threshold applies, what competition and documentation it requires, which purchasing vehicle to use, how to classify supplies vs. equipment, when prior approval is needed, and what happens to title and disposition afterward — with links to the full page on every step.

Ask about Federal Procurement for Research Institutions: The Full Decision Sequence

Answers are drawn from this guide and the rest of the CASRAI corpus, with a link to every source.

Answers are AI-generated from CASRAI’s own published pages and can be wrong, so check the linked sources before relying on one; your question is logged without personal data — never sold, never used to train a third-party model — to show us what CASRAI is missing, so please do not type personal or confidential details. How we use this

Federal procurement rules do not live in one place. A single purchase under a federal award can touch a dollar threshold, a required method of competition, a documentation rule, an equipment-classification test, a prior-approval requirement, and eventually a titling and disposition rule — each governed by a different subsection of 2 CFR 200, and each covered on this site as its own page. This guide is the map: it walks the decision sequence a research administrator actually works through for a federally funded purchase, in order, and links to the full treatment of each step.

It does not restate the detail on any linked page. Read this guide to understand the shape of the whole obligation and where you are in it; follow the links when you reach the step that applies to your purchase.

The sequence, at a glance

For most purchases charged to a federal award, the questions arrive in roughly this order:

  1. What dollar threshold does this purchase fall under? — determines everything downstream.
  2. What method of competition does that threshold require?
  3. What documentation has to exist before you commit funds?
  4. Is there an existing purchasing vehicle you’re required or allowed to use instead of running your own solicitation?
  5. What contract or payment vehicle are you actually using — P-Card, purchase order, blanket order, or a negotiated contract?
  6. Is the item a supply or equipment, and does that change the accounting and approval path?
  7. Does the purchase need prior sponsor approval before you commit to it?
  8. Is the cost allowable at all under the award’s cost principles?
  9. Once purchased, who holds title, and what happens to the item at the end of the award?

The rest of this guide takes each in turn.

1. Which dollar threshold applies?

The dollar threshold a federal-award purchase falls under is the hinge everything else swings on: it determines whether the purchase needs no competition, a few informal quotes, or a formal solicitation. Under 2 CFR 200 Subpart D, a non-federal entity’s own documented procurement procedures govern below the Simplified Acquisition Threshold (SAT), and formal methods (sealed bids or competitive proposals) are generally required above it. Both the SAT and the micro-purchase threshold beneath it are set by the FAR and periodically adjusted for inflation — they moved again in October 2025, so treat any specific dollar figure you see cited as something to confirm against your institution’s current procurement policy or the current FAR/2 CFR 200.1 threshold table rather than assume is unchanged from a prior fiscal year.

The full breakdown of thresholds, the five procurement methods, and the documentation each one requires is in 2 CFR 200 Procurement Standards: §§200.317–200.327 Explained. Start there if you are not yet sure which threshold band your purchase sits in.

2. What method of competition does that threshold require?

The method of competition a federal-award purchase requires follows directly from its dollar threshold band: micro-purchases generally need no competitive quotes (just a reasonable-price determination), purchases up to the SAT need price or rate quotes from an adequate number of qualified sources, and purchases above the SAT need a sealed bid or competitive proposal process. The one method that departs from “more competition as the dollar amount rises” is noncompetitive (sole-source) procurement, which is permitted only in specific circumstances — a genuine single source, a public emergency, express written authorization from the federal awarding agency, or inadequate competition after a solicitation — regardless of dollar amount.

Sole source is also the step institutions get wrong most often, because “sole source” and “single source” get used interchangeably when they are not the same determination. Sole Source vs. Single Source lays out the distinction, and Sole-Source Justification Letter covers what the written justification needs to contain to survive audit review.

3. What documentation has to exist before you commit funds?

2 CFR 200.324 requires a documented cost or price analysis for every procurement action, including contract modifications, with an independent cost estimate developed before you see any bid or proposal. Two things trip institutions up here: treating a price analysis (comparing a quoted price to market data) as interchangeable with a cost analysis (evaluating the individual cost elements behind a price, required when there isn’t adequate price competition), and skipping the independent estimate because a vendor quote already exists.

Cost Analysis vs. Price Analysis explains which one a given purchase actually needs. Independent Government Cost Estimate (IGCE) covers how to build the independent estimate itself — the one that has to exist before, not after, you receive bids.

4. Is there an existing purchasing vehicle you should use instead?

An existing purchasing vehicle — an intergovernmental agreement, a cooperative purchasing arrangement, or a state or local government purchasing agreement — should be used instead of running a from-scratch solicitation whenever 2 CFR 200.318(e) applies: it directs non-federal entities to use these vehicles where it’s practical to do so and it results in a lower cost. In practice this means a research institution’s own procurement policy should route a purchase through an existing cooperative or group vehicle before defaulting to a from-scratch RFP — and an auditor may ask why one wasn’t used.

Cooperative & Intergovernmental Purchasing Under 2 CFR 200.318(e) covers the regulatory basis for this. Two of the vehicles institutions actually use in practice are E&I Cooperative Services, a nonprofit purchasing cooperative built specifically for higher education, and Group Purchasing Organizations for Research Institutions more broadly, which covers how GPO contracts work and when using one still requires you to document that it met your competition obligations rather than assuming GPO membership satisfies 2 CFR 200 by itself. For research institutions embedded in or affiliated with a hospital system, Hospital Supply Chain covers how clinical-side purchasing infrastructure and contracts intersect with (and sometimes complicate) research procurement. None of these vehicles eliminates the underlying documentation requirement — they change how competition is satisfied, not whether it has to be.

5. What contract or payment vehicle are you using?

The contract or payment vehicle for a federal-award purchase — a standard purchase order, a blanket purchase order, a procurement card transaction, or a negotiated time-and-materials contract — is a separate, mechanical question from threshold and competition: all four are subject to the same underlying 2 CFR 200 rules, but each carries its own additional restrictions and failure modes.

Procurement (P-) cards are the vehicle with the most federal-compliance-specific pitfalls, because their convenience is exactly what creates split-purchase and undocumented-competition risk on a federal award. Procurement Card (P-Card) Compliance on Federal Awards covers those risks directly; Procurement Card defines the instrument itself; Procurement Card Program covers setting one up and administering it; and Procurement Card Reconciliation covers the monthly reconciliation cycle that is usually where audit findings actually surface. For choosing between vehicles, Procurement Card vs. Credit Card, Blanket Purchase Order vs. P-Card vs. Standard PO, and Purchase Requisition vs. Purchase Order lay out the practical differences.

Time-and-materials contracts sit in a different category: 2 CFR 200.318(j) restricts their use to situations where no other contract type is suitable, and requires a ceiling price and specific oversight the institution must maintain for the life of the contract, precisely because a T&M structure has weak built-in cost controls compared to a fixed-price or cost-reimbursement contract. Time-and-Materials Contract Restrictions Under 2 CFR 200.318(j) covers what has to be in place before you can use one.

6. Is the item a supply or equipment?

Whether a purchased item is classified as a supply or equipment changes its accounting treatment, its approval path, and what happens to it after the award ends, so the classification has to happen before, not after, the purchase. Under 2 CFR 200.1, “equipment” is tangible personal property with a useful life of more than one year and a per-unit acquisition cost at or above the institution’s capitalization threshold (which cannot exceed a federally set ceiling); everything else charged as a direct cost is a supply. Institutions set their own capitalization threshold at or below that ceiling, so the exact dollar line varies by institution, not just by regulation.

Supplies vs. Equipment Under 2 CFR 200 is the practical decision guide; Equipment (2 CFR 200.1 Definition) gives the operational definition itself; and Capitalization Threshold for Research Equipment covers how institutions set and apply their own threshold within the federal ceiling.

7. Does the purchase need prior approval?

Prior written approval from the federal awarding agency is required for some capital expenditures before funds are committed, regardless of how competition and documentation were satisfied for that same purchase — skipping prior approval is a distinct compliance failure from a competition failure, and auditors treat it as one. 2 CFR 200.439 sets out which capital expenditures trigger prior approval and which don’t; a common related question is whether leasing rather than purchasing changes the approval and cost-allowability picture, which 2 CFR 200.465 addresses directly.

Equipment & Capital Expenditures: Prior Approval Under 2 CFR 200.439 and Lease vs. Purchase Equipment Under 2 CFR 200.465 cover both. When prior approval is required, the request typically has to be justified in writing; Equipment Justification Letter covers what that justification needs to demonstrate.

8. Is the cost allowable at all?

Cost allowability under the award’s cost principles (2 CFR 200 Subpart E) is a check every federal-award purchase needs independent of competition and approval: a purchase can clear every competition and approval hurdle and still be an unallowable cost, which means it can’t be charged to the federal award regardless of how well the procurement itself was run. Budget Justification & Allowability Review Under 2 CFR 200 covers how this review actually gets conducted, and Unallowable Cost defines the category and gives common examples.

9. After the purchase: title and disposition

Title to equipment purchased on a federal award generally vests in the recipient institution, subject to conditions the federal government retains: a right to require the equipment be used for the project, and disposition instructions if the equipment is no longer needed and its fair market value exceeds the disposition threshold set in 2 CFR 200.313. Below that threshold, the recipient can generally sell, retain, or otherwise dispose of the equipment with no further federal obligation; above it, the recipient needs disposition instructions from the awarding agency or pass-through entity, and the federal government retains a right to a share of any sale proceeds or compensation based on its percentage share of the original cost.

Equipment Titling: Conditional Title on Federal Awards covers this end of the lifecycle — what “conditional title” actually means in practice, and what triggers a disposition obligation.

Putting it together

No single federally funded purchase touches every step above. A $200 lab consumable bought on a P-Card is a micro-purchase, a supply, needs no prior approval, and is done the moment it’s reconciled. A $150,000 piece of shared research equipment bought through a competitive proposal process is a different purchase at nearly every step: threshold, competition method, documentation, possibly prior approval, definitely equipment classification, and definitely a titling and disposition obligation that outlives the purchase itself by years. The value of walking the sequence deliberately, rather than treating each purchase as one-off, is that it surfaces which steps actually apply before you’ve already committed funds — not after an auditor asks why a step was skipped.

Frequently asked questions

Which dollar threshold applies to a federal-award purchase?

The dollar threshold that applies is whichever band the purchase price falls into under 2 CFR 200 Subpart D: the micro-purchase threshold, the Simplified Acquisition Threshold (SAT), or above the SAT — each band requiring a progressively more formal method of competition. Both thresholds are set by the FAR and adjusted periodically for inflation, and they moved again in October 2025, so confirm the current figure against your institution’s procurement policy or the current FAR/2 CFR 200.1 threshold table rather than assuming a figure from a prior fiscal year still applies. See 2 CFR 200 Procurement Standards for the full threshold breakdown.

When is competition required for a federal-award purchase?

Competition is required above the micro-purchase threshold, scaling from informal price or rate quotes up to the SAT to a formal sealed-bid or competitive-proposal process above it; noncompetitive (sole-source) procurement is permitted only in narrow circumstances — a genuine single source, a public emergency, express written agency authorization, or inadequate competition after a solicitation — regardless of dollar amount. See Sole Source vs. Single Source and Sole-Source Justification Letter for how a sole-source determination is documented.

What documentation must exist before a federal-award purchase is committed?

A documented cost or price analysis must exist for every procurement action under 2 CFR 200.324, including contract modifications, together with an independent cost estimate developed before any bid or proposal is seen. Which type of analysis applies depends on whether adequate price competition exists; see Cost Analysis vs. Price Analysis and Independent Government Cost Estimate (IGCE).

How is an item classified as a supply or equipment on a federal award?

An item is classified as equipment under 2 CFR 200.1 if it is tangible personal property with a useful life of more than one year and a per-unit acquisition cost at or above the institution’s capitalization threshold, which itself cannot exceed a federally set ceiling; everything else charged as a direct cost is a supply. Because institutions set their own capitalization threshold at or below that ceiling, the exact dollar line differs by institution. See Supplies vs. Equipment Under 2 CFR 200.

What prior approval is needed for a federal-award purchase?

Prior written approval from the federal awarding agency is needed for certain capital expenditures before funds are committed, independent of whether competition and documentation requirements were satisfied. 2 CFR 200.439 sets out which capital expenditures trigger this approval; 2 CFR 200.465 addresses whether leasing instead of purchasing changes the approval and allowability picture. See Equipment & Capital Expenditures: Prior Approval Under 2 CFR 200.439.

What happens to title after a federal-award purchase of equipment?

Title to equipment purchased on a federal award generally vests in the recipient institution, subject to conditions the federal government retains, including disposition instructions once the equipment is no longer needed and its fair market value exceeds the disposition threshold set in 2 CFR 200.313. Below that threshold the recipient can generally dispose of the equipment with no further federal obligation; above it, disposition instructions and a share of proceeds may be owed to the awarding agency. See Equipment Titling: Conditional Title on Federal Awards.

Does 2 CFR 200 apply to purchases made with an institution’s own (non-federal) funds?

No. The procurement standards in 2 CFR 200 Subpart D govern purchases charged to a federal award. An institution’s non-federally-funded purchases follow its own institutional purchasing policy, which may look similar for consistency but is not itself subject to federal audit under these sections.

Does using a GPO or cooperative purchasing agreement remove the need for a cost or price analysis?

Not automatically. Using an established cooperative or GPO contract can satisfy the competition requirement under 2 CFR 200.318(e), but the institution generally still needs to document why that vehicle was used and that the price obtained through it is reasonable — see the vehicle-specific guides linked in the section above for how this is typically documented.

Who decides an institution’s capitalization threshold for equipment?

The institution does, within the ceiling set by 2 CFR 200.1’s equipment definition. Two institutions can set different capitalization thresholds at or below that ceiling, which is why the dollar line at which an item becomes “equipment” rather than a “supply” can differ from one institution to the next even under the same federal rule.

What happens if a required step in this sequence is skipped?

It becomes an audit finding. Missing or inadequate cost/price analysis, missing sole-source justification, missing prior approval for a capital expenditure, and improper equipment disposition are all recurring categories of procurement findings in Single Audits conducted under 2 CFR 200 — which is a large part of why each step above has its own documentation requirement rather than relying on the purchase simply “looking reasonable” after the fact.

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →