EIA-860M Monthly Generator Inventory Guide

A technical guide to Form EIA-860M, covering the 1 MW reporting threshold, 12-month generator pipeline updates, and battery energy storage classifications.

Written and maintained by CASRAI Editorial Board

Published · Last updated

On this page

Form EIA-860M, officially designated as the Monthly Update to the Annual Electric Generator Report, is a mandatory federal survey administered by the U.S. Energy Information Administration (EIA) that monitors monthly status updates, commercial additions, planned retirements, and capacity modifications for utility-scale electric generators across the United States and Puerto Rico with a combined nameplate capacity of 1 megawatt (MW) or greater. Acting as a rolling, high-frequency supplement to the comprehensive annual Form EIA-860, this monthly data collection tracks generating units and grid-scale battery energy storage systems (BESS) scheduled to begin commercial operation or retire within a forward-looking 12-month window. Energy analysts, grid modelers, and battery technology researchers rely on the resulting Preliminary Monthly Electric Generator Inventory as the primary public benchmark for observing near-term capacity additions, verifying commercial operation milestones, and evaluating the rapid expansion of utility-scale storage assets.

Definition and Scope of Form EIA-860M

Administered under the statutory authority of Section 13(b) of the Federal Energy Administration Act of 1974 (FEAA, 15 U.S.C. 772(b)) and Section 5(b) of the Emergency Energy Conservation Act of 1979 under OMB Control No. 1905-0129, Form EIA-860M is a legal reporting requirement for qualifying electricity generators. While the annual Form EIA-860 survey establishes an exhaustive baseline of technical, environmental, and operational attributes across all existing utility-scale generating plants and those planned over a 10-year horizon, grid infrastructure undergoes rapid shifts between annual filings. Supply chain realignments, interconnection queue congestion, construction delays, and unexpected plant retirements render annual inventories lagging indicators. Form EIA-860M fills this operational gap by executing monthly data collection from plant operators experiencing active transitions.

The threshold for survey inclusion is strictly established at a total generator nameplate capacity—defined as the sum of all existing or proposed generators at a single physical site—of 1 MW (1,000 kilowatts) or greater, provided the facility is connected to the local or regional electrical grid. This threshold encompasses traditional central-station thermal power plants, utility-scale solar photovoltaic arrays, onshore and offshore wind farms, and stationary electrochemical battery installations. Distributed generation located behind the customer meter (such as residential rooftop solar or commercial backup generators that do not export power under utility tariffs) falls outside the scope of Form EIA-860M and is instead monitored through aggregate utility sales filings under Form EIA-861. In similar federal energy tracking, such as the EIA natural gas storage report, sub-annual reporting provides essential high-frequency visibility into energy inventory shifts before annual data sets are finalized.

Geographically, Form EIA-860M covers all 50 U.S. states and the District of Columbia. In March 2018, the EIA officially expanded the survey’s perimeter to mandate reporting from existing, retired, and proposed generating units located in Puerto Rico that satisfy the 1 MW threshold. Monthly survey respondents submit updates electronically through the EIA secure Internet Data Collection (e-filing) single sign-on system. Reporting is mandatory each month, with survey schedules due by the middle of the calendar month following the reporting period. Data gathered through Form EIA-860M is published publicly as the Preliminary Monthly Electric Generator Inventory, typically released around the third or fourth week of each subsequent month.

How It Works and Generator Lifecycle Tracking in Practice

Form EIA-860M operates on a targeted, rolling 12-month horizon rather than surveying every operating generator in the nation every month. To minimize regulatory reporting burdens on stationary assets whose configurations remain static, the EIA utilizes a filtered survey panel. Respondents are drawn from entities that have filed the annual Form EIA-860 and meet at least one of three operational criteria: operating an existing generator scheduled for retirement within the subsequent 12 months; developing a proposed new generator scheduled to enter commercial service within the subsequent 12 months; or implementing proposed capacity modifications or environmental retrofits scheduled for completion within one month.

Survey Schedules and Data Architecture

The survey instrument is structured into four standardized schedules that systematize data ingestion:

  • Schedule 1 (Identification): Captures verified respondent credentials, utility or independent power producer (IPP) identification numbers, plant codes assigned by the EIA, physical site geographic coordinates, and authorized reporting contact information.
  • Schedule 2 (Updates to Proposed Generating Units): Collects technical updates on upcoming installations slated for commercial operation within 12 months. Key fields include nameplate power capacity in megawatts, net summer and winter capability, energy source codes, prime mover designations, and operational status progression codes.
  • Schedule 3 (Updates to Existing Generating Units): Tracks active generators undergoing imminent changes, recording announced retirement dates, temporary mothballing, environmental control retrofits, or capacity re-ratings.
  • Schedule 4 (Comments): Provides structured qualitative logs where facility operators document the drivers of project delays, supply chain disruptions, permit revisions, or unexpected equipment failures.

The Preliminary Monthly Electric Generator Inventory Workbook

Upon receipt of monthly survey filings, the EIA integrates reported changes with independent market research and publishes a multi-tab spreadsheet workbook. Understanding the layout of this workbook is essential for computational parsing and data ingestion:

  • Operating Tab: Catalogs all operating utility-scale generators (1 MW or greater) currently in commercial operation, on hot standby, or under temporary maintenance outages. Each record includes entity ID, plant ID, generator ID, state, county, balancing authority code, sector name, prime mover, primary energy source, nameplate capacity (MW), net summer capacity (MW), net winter capacity (MW), and commercial online date.
  • Planned Tab: Details proposed generators slated to enter commercial service. This tab tracks expected online dates, developer names, interconnection milestones, and estimated capital capacities.
  • Retired Tab: Serves as an authoritative longitudinal historical archive. In March 2017, the EIA expanded this tab to contain a comprehensive historical record of all utility-scale generators that have permanently retired across the United States since 2002. Analysts utilize this archive to assess grid decarbonization trajectories and asset depreciation cycles.
  • Canceled or Postponed Tab: Documents proposed projects that have been formally withdrawn, terminated by developers, or postponed indefinitely due to economic, regulatory, or technical hurdles.

Energy Storage Classifications, Prime Movers, and Chemistry Types

One of the most vital modern functions of Form EIA-860M is tracking the rapid deployment of stationary grid energy storage assets. Under EIA reporting rules, energy storage facilities that feed electrical energy into the bulk power grid are legally classified and regulated as electric generators. When battery installations satisfy the 1 MW nameplate threshold, their developers and operators must report them on Schedule 2 and Schedule 3 using standardized federal classification codes.

Prime Mover Codes for Storage Technologies

The EIA categorizes generation equipment by ‘Prime Mover’—the mechanical or electrochemical system driving energy conversion. For energy storage, Form EIA-860 and EIA-860M define six specific prime mover codes:

  • BA (Energy Storage, Battery): Denotes stationary electrochemical battery energy storage systems (BESS), encompassing lithium-ion, flow batteries, lead-acid, and sodium-based chemistries.
  • PS (Energy Storage, Reversible Hydraulic Turbine): Denotes pumped storage hydroelectricity, which remains the largest historical source of grid storage capacity; researchers studying mechanical grid buffering frequently compare BESS deployment against pumped storage hydroelectric facilities to analyze spatial and capital trade-offs.
  • CE (Energy Storage, Compressed Air): Designates compressed air energy storage (CAES) facilities utilizing underground geological caverns or pressurized vessels.
  • FW (Energy Storage, Flywheel): Represents high-speed kinetic rotational storage systems primarily deployed for sub-second frequency regulation.
  • CP (Energy Storage, Concentrated Solar Power): Designates thermal energy storage integrated into concentrating solar power towers or parabolic trough installations.
  • ES (Energy Storage, Other): Captures novel or unclassified storage technologies, including advanced gravity-based storage or emerging thermal liquid-air systems.

Electrochemical Storage Chemistry Identifiers

While monthly Form EIA-860M filings record prime mover BA to capture capacity additions and online dates, the annual Form EIA-860 companion survey captures granular sub-technology codes under Table 5b (Electro-chemical Storage Technology Codes and Descriptions). Researchers linking the two datasets can identify the precise cell chemistry deployed across facilities:

  • LIB (Lithium-ion Battery): The dominant commercial technology across utility-scale storage, comprising lithium iron phosphate (LFP) and nickel manganese cobalt (NMC) formulations.
  • FLB (Flow Battery): Denotes redox flow architectures where energy is stored in external liquid electrolyte tanks; analysts evaluating long-duration multi-hour storage evaluate flow battery systems and commercial installations such as the vanadium redox flow battery to track non-degrading aqueous chemistries.
  • PBB (Lead-acid Battery): Denotes advanced lead-acid or carbon-enhanced lead battery banks historically utilized for substation backup power.
  • NAB (Sodium-based Battery): Includes high-temperature sodium-sulfur (NaS) and emerging ambient-temperature sodium-ion grid systems.
  • ECC (Electro-chemical Capacitor): Supercapacitors deployed for ultra-fast power quality buffering.
  • MAB (Metal Air Battery) and NIB (Nickel Based Battery): Emerging chemistries currently undergoing pilot-scale utility demonstration.
  • OTH (Other): Proprietary or hybrid electrochemical configurations.

Power Capacity vs. Energy Capacity and Storage Duration

A critical technical distinction in EIA-860M is the handling of battery power capacity versus energy capacity. Form EIA-860M explicitly reports nameplate power capacity measured in megawatts (MW), which denotes the maximum continuous instantaneous electrical discharge rate the plant’s inverter systems can deliver to the point of interconnection. However, energy capacity—measured in megawatt-hours (MWh) and representing the total electrical energy stored when fully charged—is tracked primarily in Schedule 3 of the annual Form EIA-860.

From these two parameters, analysts compute the asset’s rated storage duration in hours:

Duration (Hours) = Nameplate Energy Capacity (MWh) / Nameplate Power Capacity (MW)

For example, a grid-scale lithium-ion facility reporting 200 MW nameplate power capacity and 800 MWh energy capacity possesses a 4-hour duration. In regional transmission markets like CAISO and ERCOT, 2-hour and 4-hour durations represent the vast majority of current additions tracked in EIA-860M, reflecting peak-shaving and resource adequacy requirements.

Standalone vs. Co-Located Hybrid Installations

Form EIA-860M provides essential tracking of whether battery assets are deployed as standalone resources or co-located as hybrid power plants. Hybrid facilities typically pair solar photovoltaic generation with battery storage (PV + BESS) or wind turbines with storage. In EIA-860M, each distinct prime mover at a plant site receives its own generator record under the same EIA Plant Code. For example, a hybrid solar-plus-storage plant in Nevada will carry one or more generator records with prime mover PV (photovoltaic) and a separate generator record with prime mover BA (battery). Analysts can differentiate DC-coupled systems (where the battery and solar array share an inverter system behind a common substation) from AC-coupled systems (where each technology maintains dedicated inverters) by cross-referencing inverter loading ratios in the annual survey.

Generator Lifecycle Tracking and Status Codes

The core utility of Form EIA-860M lies in tracking generators as they progress through physical development, permitting, procurement, construction, and commercial commissioning. In both Schedule 2 and the monthly Preliminary Inventory spreadsheet, each proposed generator is assigned a standardized status code that provides immediate insight into its development certainty.

Decoding EIA Status Codes

Understanding status codes allows analysts to filter high-probability projects from speculative pipeline proposals:

  • (P) Planned for installation: Regulatory approvals have not yet been initiated; early-stage siting and environmental reviews are underway.
  • (L) Regulatory approvals pending: Not yet under construction, but formal applications have been submitted to state public utility commissions, local zoning boards, or federal land managers.
  • (T) Regulatory approvals received: All necessary certificates of public convenience and necessity, environmental permits, and zoning variances are granted; construction has not commenced.
  • (U) Under construction, 50% or less complete: Civil site preparation, foundational earthwork, or substation interconnect construction is physically underway, with estimated progress at 50% or less.
  • (V) Under construction, more than 50% complete: Advanced physical construction, including containerized battery rack installation, inverter integration, and medium-voltage collection wiring, with physical completion exceeding 50%.
  • (TS) Construction complete, testing stage: Physical installation is finished, but commercial operation has not commenced; the facility is undergoing pre-commissioning synchronization, SCADA testing, and interconnection compliance verification.
  • (OP) Operating: The generator has officially entered commercial operation and delivers power under market dispatch tariffs or power purchase agreements.
  • (SB) Standby / Backup: The generator is kept in operational readiness but operated on an as-needed or peaking basis.
  • (OA) Out of service (Temporary): The unit is offline for maintenance or repairs but expected to return to commercial service within the current calendar year.
  • (OS) Out of service (Prolonged): The unit is offline and not expected to return to service during the current calendar year.
  • (RE) Retired: The generator has permanently ceased commercial generation and is disconnected from the transmission grid.

Interconnection Queue Reality vs. EIA-860M Construction Milestones

Energy economists and grid planners frequently confront massive discrepancies between regional interconnection queues (administered by RTOs and ISOs such as PJM, MISO, CAISO, and ERCOT) and EIA-860M figures. Interconnection queues contain thousands of gigawatts of proposed generation and storage projects, but historical analysis reveals that over 70% to 80% of queued projects are ultimately canceled or withdrawn due to interconnection study costs, network upgrade allocations, or speculative developer filings.

In contrast, Form EIA-860M reports only projects where developers have incurred substantial capital commitments and reached formal planning milestones within a rolling 12-month horizon. When a battery project transitions in EIA-860M from status (T) into status (U), (V), or (TS), the probability of commercial completion exceeds 90%. Thus, EIA-860M serves as a critical reality filter, stripping away queue speculation to reveal actual grid capacity entering service.

Where It Matters for Energy Labs, Utilities, and Supply Decisions

While Form EIA-860M is a federal regulatory survey, its outputs directly shape operations, research programs, and infrastructure investments across national laboratories, university energy institutes, and utility procurement offices.

Analytical Workflows in Energy and Grid Research Laboratories

In national laboratories (such as NREL, PNNL, and Sandia) and university engineering departments, researchers ingesting EIA-860M establish standardized analytical protocols to support grid modeling:

  • Capacity Expansion Modeling: Macro-energy models (such as NREL’s ReEDS or PNNL’s GCAM) require highly accurate near-term baselines of installed generation and storage capacity. Modelers parse monthly EIA-860M files to seed real-world starting conditions before solving multi-decade optimal dispatch algorithms.
  • Asset Degradation and Lifecycle Assessments: Researchers conducting techno-economic and life cycle inventory methodologies track fleet-wide battery commissioning dates in EIA-860M to evaluate real-world cell degradation rates against lab-bench calendar aging models across different climatic regions.
  • Resource Adequacy and Reliability Studies: Grid reliability engineers monitor monthly additions and retirements to assess reserve margins in regions experiencing fossil unit retirements, ensuring battery storage deployments match thermal plant decommissioning timelines.

Supply Chain and Procurement Decision Framework

For battery storage procurement directors, utility resource planners, and component suppliers, monthly EIA-860M updates deliver actionable intelligence across three decision areas:

  • Lead Time and Delay Benchmarking: By comparing expected commercial operation dates (COD) across consecutive monthly releases, procurement teams track industry-wide lead-time drift. For example, if projects in status (U) consistently slip their online dates by four to six months, procurement managers can adjust their EPC contractual milestones and battery cell delivery schedules accordingly.
  • Vendor and Chemistry Adoption Trends: Linking EIA-860M monthly additions with annual EIA-860 sub-technology records reveals shifting industry adoption patterns—such as the massive commercial transition from nickel-based chemistries toward lithium iron phosphate (LFP) for stationary containerized storage.
  • Transformer and Substation Interconnect Bottlenecks: When generator records show status (TS) (construction complete) persisting for multiple consecutive months without transitioning to (OP) (operating), it frequently highlights regional transmission interconnect bottlenecks, utility witness testing backlogs, or delays in high-voltage step-up transformer delivery.

Common Misunderstandings and Analytical Pitfalls

Working with Form EIA-860M requires navigating several common data pitfalls that can mislead researchers and analysts who are unfamiliar with federal energy reporting conventions:

  • Confusing Preliminary Monthly Data with Final Statistics: The EIA explicitly titles the monthly release the Preliminary Monthly Electric Generator Inventory. Creating monthly estimates requires incorporating unverified data from annual surveys and ongoing EIA market research. Capacities and online dates are corrected in subsequent monthly issues without separate acknowledgments or errata notes. Authoritative, final generator statistics are established only when the annual Form EIA-860 is published.
  • Equating Nameplate Capacity with Net Summer and Winter Capability: For battery storage, nameplate power capacity represents the inverter rating under standard test conditions. However, in the Operating tab, analysts often note slight discrepancies between nameplate capacity and net summer or winter capability. These variations stem from auxiliary parasitic loads—such as active liquid chilling, HVAC thermal management units, and inverter station transformer losses—which increase during extreme ambient summer temperatures.
  • Assuming EIA-860M Captures Complete Storage Duration: As noted, Form EIA-860M reports nameplate power capacity in MW, but does not include energy storage capacity in MWh. Analysts who require storage duration or MWh metrics must join EIA-860M records with the annual EIA-860 Schedule 3 tables using the combined keys Plant Code and Generator ID.
  • Overlooking Generator Unit vs. Plant Aggregations: Form EIA-860M reports data at the individual generator unit level, not the plant level. A large 400 MW solar-plus-storage site might be represented by four distinct 75 MW solar generator units and two 50 MW battery units. Aggregating records by plant code without filtering by prime mover will produce invalid capacity estimates.
  • Ignoring Operational Round-Trip Efficiency (RTE): Form EIA-860M tracks installed physical capacity, but does not track dispatch generation or energy throughput. To calculate actual operational round-trip efficiency (the ratio of gross generation discharged to gross energy consumed for charging), analysts must merge EIA-860M capacity inventories with monthly dispatch and fuel consumption records reported under Form EIA-923.

The original compiled dataset below details the technical and regulatory boundaries across Form EIA-860, Form EIA-860M, and Form EIA-923, providing a direct reference for survey design, parameters, and reporting cadences.

Frequently asked questions

Who is required to file Form EIA-860M?

Entities operating existing electric generating plants or developing proposed plants with a combined nameplate capacity of 1 megawatt (MW) or greater are required to file Form EIA-860M if they have existing generators scheduled to retire within 12 months, proposed generators scheduled to enter commercial service within 12 months, or proposed modifications scheduled for completion within one month.

What is the difference between Form EIA-860 and Form EIA-860M?

Form EIA-860 is an exhaustive annual survey that collects comprehensive technical, operational, and environmental data on existing generators and proposed projects over a 10-year planning horizon, including battery energy capacity (MWh) and cell chemistries. Form EIA-860M is a high-frequency monthly update focused exclusively on near-term changes occurring within a rolling 12-month window.

Does Form EIA-860M track behind-the-meter or residential battery storage?

No. Form EIA-860M tracks utility-scale electric generators with a combined site nameplate capacity of 1 MW or greater connected to the electrical grid. Behind-the-meter (BTM) commercial or residential storage assets below this threshold are collected in aggregate via annual utility distribution filings under Form EIA-861.

How is battery duration calculated using EIA data?

Battery duration is computed by dividing nameplate energy capacity in megawatt-hours (MWh) by nameplate power capacity in megawatts (MW). While nameplate MW is tracked monthly in Form EIA-860M, energy capacity in MWh is reported in Schedule 3 of the annual Form EIA-860, requiring a relational join between the two datasets.

What does generator status code (TS) indicate in EIA-860M?

Status code (TS) signifies that physical construction of the generator is complete, but the unit has not yet entered commercial operation. During this stage, the facility undergoes pre-commissioning testing, grid synchronization, and regulatory verification.

How often is the Preliminary Monthly Electric Generator Inventory updated?

The inventory is published monthly by the EIA, typically released toward the end of each month containing preliminary data collected from respondents for the preceding month.

Sources

  • U.S. Energy Information Administration (EIA). Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860). https://www.eia.gov/electricity/data/eia860m/ (Checked 2026-11-15).
  • U.S. Energy Information Administration (EIA). Form EIA-860M: Monthly Update to the Annual Electric Generator Report Instructions and Survey Portal. https://www.eia.gov/survey/#eia-860m (Checked 2026-11-15).
  • U.S. Energy Information Administration (EIA). Form EIA-860: Annual Electric Generator Report Instructions and Code Layouts. https://www.eia.gov/survey/#eia-860 (Checked 2026-11-15).
  • U.S. Office of Management and Budget (OMB) / RegInfo.gov. Information Collection Review: Form EIA-860, Form EIA-860M, and Form EIA-923 (OMB Control No. 1905-0129). https://www.reginfo.gov/public/do/PRAViewICR?ref_nbr=202206-1905-002 (Checked 2026-11-15).
  • U.S. Energy Information Administration (EIA). Battery Storage in the United States: An Update on Market Trends. https://www.eia.gov/analysis/studies/electricity/batterystorage/ (Checked 2026-11-15).
  • Federal Energy Administration Act of 1974 (FEAA; Public Law 93-275; 15 U.S.C. 772(b)) and Emergency Energy Conservation Act of 1979 Section 5(b). (Checked 2026-11-15).

Data: EIA Electric Generator and Storage Survey Framework Comparison

Original technical comparison of survey frequency, reporting thresholds, operational scope, energy storage parameters, and statutory mandates across Form EIA-860, Form EIA-860M, and Form EIA-923 based on official EIA survey instructions.

Period covered: 2002-2026. Coverage: United States and Puerto Rico.

EIA Electric Generator and Storage Survey Framework Comparison
Survey InstrumentReporting FrequencyCapacity Threshold (MW)Planning Horizon (months)Energy Storage Metrics CapturedStatutory Authority
Form EIA-860 (Annual)Annual1120Nameplate MW, net summer/winter MW, energy capacity (MWh), duration, electrochemical chemistry (Table 5b), enclosure, connection typeFEAA Section 13(b); 15 U.S.C. 772(b)
Form EIA-860M (Monthly)Monthly112Nameplate MW, net summer/winter MW, commercial operation date (COD), monthly status code (OP, V, U, TS, RE), prime mover (BA)FEAA Section 13(b); 15 U.S.C. 772(b)
Form EIA-923 (Monthly/Annual)Monthly (Sample) / Annual10Gross generation (MWh), net generation (MWh), energy consumed for storage charging (MWh), round-trip efficiency (RTE)FEAA Section 13(b); 15 U.S.C. 772(b)
Form EIA-861 (Annual)Annual00Distribution-level battery storage, customer-sited behind-the-meter (BTM) storage capacity, virtual power plants (VPP)FEAA Section 13(b); 15 U.S.C. 772(b)

Sources

Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.

Follow CASRAI

Research-administration guidance, standards updates and independent tool reviews.

Ask CASRAI · full access

Ask about EIA-860M Monthly Generator Inventory Guide

Full access: large monthly usage, up to 10 source passages behind each answer, and MCP and API access for Claude Code, Codex and other CLIs. Cancel any time.

An AI assistant for research: funder rules, compliance, methods and publishing. It links the sources behind its answers and labels answers that come from a web search.

Answers draw on CASRAI's guides and dictionary plus the federal and funder documents we index: Federal Register, Grants.gov, Regulations.gov and UKRI.

Works on this site and inside Claude, Cursor and the AI tools you already use.

Everything CASRAI publishes — this page, the dictionary, the guides and the news — stays open to read, with no account and no card.

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →