Landfill design is the engineering of a disposal site so that waste is contained, liquids and gases are controlled and the site stays safe after it closes. In the United States, a municipal solid waste landfill is built to the federal criteria in 40 CFR part 258: a composite liner (a flexible membrane over at least two feet of compacted soil), a leachate collection system, routine methane monitoring, a final cover and 30 years of post-closure care, with states running the permit programs and free to set stricter rules.
Definition and scope: what landfill design covers
EPA describes a municipal solid waste landfill (MSWLF) as a discrete area of land or excavation that receives household waste. It may also receive other nonhazardous wastes, such as commercial solid waste, nonhazardous sludge, conditionally exempt small quantity generator waste and industrial nonhazardous solid waste. Nonhazardous solid waste is regulated under Subtitle D of the Resource Conservation and Recovery Act (RCRA). States take the lead in making sure the federal criteria are met and may set more stringent requirements; where there is no approved state program, the federal requirements apply directly to the facility. EPA gave the count of MSWLFs in the continental United States as approximately 1,908 in 2009.
EPA lists seven major aspects that the revised criteria in 40 CFR part 258 address, and these seven aspects are the practical scope of landfill design in the United States:
- location restrictions (suitable geology, away from faults, wetlands and flood plains);
- composite liner requirements;
- leachate collection and removal;
- operating practices, including compaction and frequent soil cover;
- groundwater monitoring;
- closure and post-closure care;
- corrective action and financial assurance for closure and post-closure care.
This page covers the municipal (Subtitle D) landfill. Hazardous waste has its own separate regulatory system, and research laboratories send most of their chemical waste there rather than to a landfill; see lab waste disposal streams and hazardous waste determination for that side of the line.
What is the landfill method?
The landfill method is the disposal of solid waste in a defined, engineered area of land, where it is compacted and covered rather than left exposed. EPA’s operating-practice description is that waste is compacted and covered frequently with several inches of soil, which helps reduce odor, control litter, insects and rodents, and protect public health. The design around that practice is what separates a modern landfill from an open dump: the waste sits on a liner system, liquid that drains through it is collected, and the finished site is capped.
How a modern landfill is built, layer by layer
Siting
Location restrictions are the first design decision. EPA’s summary is that landfills must be built in suitable geological areas, away from faults, wetlands, flood plains or other restricted areas. A site that fails this test cannot be rescued by a better liner.
The composite liner
Under 40 CFR 258.40(b), a composite liner has two components. The upper component is a flexible membrane liner (FML) at least 30 mil thick, and where the FML is high density polyethylene (HDPE) it must be at least 60 mil thick. The lower component is a layer of compacted soil at least two feet thick with a hydraulic conductivity of no more than 1 × 10⁻⁷ cm/sec. The regulation also requires the FML to be installed in direct and uniform contact with the compacted soil. EPA describes the liner as lining the bottom and sides of the landfill, protecting groundwater and the underlying soil from leachate releases.
Leachate collection
Leachate is liquid that has passed through the buried waste and drawn out chemicals from it. A leachate collection and removal system sits on top of the composite liner and carries leachate away for treatment and disposal. The design target in 258.40(a)(2) is a system that maintains less than 30 cm (about one foot) of leachate depth over the liner.
Operating cover and gas control
During operation the working face is covered with soil, as described above. Landfill gas is handled by a monitoring rule rather than a layer: owners and operators must keep methane at or below 25 percent of the lower explosive limit (LEL) in facility structures (gas control or recovery system components excluded) and at or below the LEL at the facility property boundary (40 CFR 258.23(a)). The monitoring program must be routine, its type and frequency set by soil conditions, hydrogeology, hydraulic conditions and the location of structures and property boundaries, and the minimum frequency is quarterly. If limits are exceeded, the owner or operator must immediately take the steps needed to protect human health and notify the State Director.
Groundwater monitoring and corrective action
EPA states that groundwater monitoring requires testing groundwater wells to determine whether waste materials have escaped from the landfill, and that corrective action provisions control and clean up releases. The landfill’s groundwater monitoring system is kept in service after closure (see post-closure care below).
Final cover
40 CFR 258.60(a) requires a final cover designed to minimize infiltration and erosion. It must have a permeability less than or equal to that of any bottom liner system or natural subsoil present, or no greater than 1 × 10⁻⁵ cm/sec, whichever is less. It must include an infiltration layer of at least 18 inches of earthen material and an erosion layer of at least 6 inches of earthen material capable of sustaining native plant growth. An approved-state Director may approve an alternative cover that achieves equivalent infiltration reduction and erosion protection.
Two routes to an approved design: composite liner or performance standard
Part 258 gives an owner two ways to meet the liner requirement (40 CFR 258.40(a)). The first is a design approved by the Director of an approved State that keeps the concentration values in the regulation’s Table 1 from being exceeded in the uppermost aquifer at the relevant point of compliance. The second is the prescriptive route: a composite liner as defined above plus a leachate collection system that maintains less than 30 cm of leachate over the liner.
Under the performance route, the approving Director must consider at least the hydrogeologic characteristics of the facility and surrounding land, the climatic factors of the area, and the volume and physical and chemical characteristics of the leachate. The relevant point of compliance can be no more than 150 meters from the waste management unit boundary and must be on land owned by the owner of the unit. In a state without an approved program, 258.40(e) sets out a separate route in which the state makes a determination and EPA is petitioned.
| Feature | Prescriptive composite-liner route | Performance-standard route |
|---|---|---|
| Regulation | 40 CFR 258.40(a)(2) and (b) | 40 CFR 258.40(a)(1) |
| Liner | Composite liner: FML of at least 30 mil (60 mil if HDPE) over at least 2 feet of compacted soil | Design approved by the Director of an approved State |
| Leachate control | Collection system maintaining less than 30 cm depth over the liner | Not prescribed in this paragraph; design must keep Table 1 concentrations from being exceeded in the uppermost aquifer |
| How it is judged | Meets the specification | Groundwater concentrations at the relevant point of compliance (no more than 150 m from the unit boundary) |
| Approver considers | Not applicable | Hydrogeology, climate, and leachate volume and chemistry |
The practical reading for a reader comparing designs is that the composite liner is a fixed, checkable specification, while a performance-based design is judged against groundwater concentrations and site conditions. The data table below sets the numeric requirements side by side with their section numbers.
Landfill gas and leachate: what the design is managing
EPA’s Landfill Methane Outreach Program (LMOP) Project Development Handbook states that landfill gas contains roughly 50 to 55 percent methane and 45 to 50 percent carbon dioxide, with less than 1 percent non-methane organic compounds and trace inorganic compounds. Methane is why 258.23 sets explosive-gas limits, and why gas monitoring continues after closure. Leachate, in EPA’s wording, is liquid formed as rain passes through waste, which is why both the liner and the final cover are tied to infiltration and permeability values.
Closure and post-closure care
Closing the site is part of the design, not an afterthought. Owners must prepare a written closure plan that describes the final cover and the methods used to install it (40 CFR 258.60(c)). Under 258.61(a), post-closure care runs for 30 years unless an approved-state Director shortens or lengthens it, and it consists of at least:
- maintaining the final cover, including repairs for settlement, subsidence and erosion, and preventing run-on and run-off from damaging it;
- maintaining and operating the leachate collection system (the Director may allow leachate management to stop if leachate no longer threatens human health and the environment);
- monitoring groundwater and maintaining the monitoring system;
- maintaining and operating the gas monitoring system.
A written post-closure plan must name the monitoring and maintenance activities and their frequency, a contact person or office, and the planned uses of the property; any post-closure use must not disturb the cover, liners or other containment components.
Types of solid waste: what actually goes into a landfill
People often ask for the seven types of solid waste. EPA does not define a list of seven; it characterizes municipal solid waste by material category. In its 2018 data, total MSW generation was 292.4 million tons, of which more than 146 million tons (50 percent) were landfilled. By share of total generation, paper and paperboard was the largest category at 23.1 percent, food at 21.6 percent, plastics at 12.2 percent and yard trimmings at 12.1 percent. EPA notes that food estimates in 2018 reflected additional wasted-food management pathways, so comparisons with earlier years should be made cautiously.
The design consequence is that a municipal landfill is built for mixed household and similar nonhazardous waste, and EPA notes that some materials may be banned from disposal in MSWLFs, including household paints, cleaners and chemicals, motor oil, batteries and pesticides. Many MSWLFs have a household hazardous waste drop-off station for those items. For a research institution, the equivalent rule of thumb is to classify waste before choosing a stream; see regulated medical waste in a research lab for the biological side.
Does living near a landfill affect your health?
The best-documented evidence in the sources reviewed here is from the Agency for Toxic Substances and Disease Registry (ATSDR), part of the CDC. A 2025 review in the International Journal of Environmental Research and Public Health covered ATSDR air-pathway evaluations at 125 municipal landfill sites assessed between 1988 and early 2025 (ATSDR has completed over 300 public health assessments at landfills and open dumps since the 1980s). ATSDR found no air-related public health hazard at 86 percent of those sites. At sites where hazards were identified, common issues included elevated outdoor or indoor toxicants such as hydrogen sulfide, benzene, trichloroethylene and mercury, and unsafe methane accumulation. Contributing factors included older site designs, inadequate gas collection, subsurface fires and distance from nearby residences, and corrective actions effectively reduced exposures at the affected sites.
The authors’ summary is that well-located and maintained landfills minimize public health hazards, while aging or poorly managed sites pose risks. That finding is about site design and management, not about any one person’s health; this page gives no individual health advice, and anyone with a specific concern should contact their local or state health department.
Common misunderstandings about landfill design
- A liner is not the whole system. The regulation couples the liner with a leachate collection system that holds leachate depth under 30 cm; a liner alone does not meet 258.40(a)(2).
- Closing a landfill does not end the obligation. Post-closure care is a 30-year default that includes the cover, leachate system, groundwater monitoring and gas monitoring.
- Federal numbers are minimum criteria, not the full rulebook. EPA states that states may set more stringent requirements, so the permit for a given site is the governing document.
- Not all waste belongs in a municipal landfill. Household hazardous items may be banned from MSWLFs, and hazardous waste follows RCRA’s separate hazardous waste rules; see hazardous waste generator categories.
- Landfill design is a civil and environmental engineering topic. The field boundaries are covered in what environmental engineering is and civil engineering compared with environmental engineering.
Frequently asked questions
What is the landfill method?
It is the disposal of waste in a discrete, engineered area of land where the waste is compacted and covered with soil. In the modern US version, the waste sits on a composite liner with a leachate collection system and is capped with a final cover when the unit closes (EPA; 40 CFR part 258).
What is the biggest landfill site in the world?
This page does not name one. The sources used here are the EPA and CFR pages on US landfill design, and they give no worldwide size ranking; rankings depend on whether area, waste volume or waste in place is measured, so any single answer needs a stated measure and date.
Does living near a landfill affect your health?
The ATSDR review of 125 landfill sites found no air-related public health hazard at 86 percent of them, with hazards at the remainder linked mainly to older designs, inadequate gas collection, subsurface fires and proximity to homes. It reports that well-located, maintained landfills minimize hazards. This is general information, not individual advice.
What are 7 types of solid waste?
EPA does not publish a seven-item list. It reports municipal solid waste by material category; in 2018 the largest shares of generation were paper and paperboard (23.1 percent), food (21.6 percent), plastics (12.2 percent) and yard trimmings (12.1 percent).
How thick must a landfill liner be?
Under 40 CFR 258.40(b), the flexible membrane liner must be at least 30 mil thick (60 mil if HDPE) over at least two feet of compacted soil with hydraulic conductivity no greater than 1 × 10⁻⁷ cm/sec.
How long does post-closure care last?
Thirty years by default under 40 CFR 258.61(a), which an approved-state Director may shorten or extend.
Sources
- US EPA: Municipal Solid Waste Landfills, checked 2026-11-20
- 40 CFR 258.40, Design criteria (Legal Information Institute), checked 2026-11-20
- 40 CFR 258.60, Closure criteria (Legal Information Institute), checked 2026-11-20
- 40 CFR 258.61, Post-closure care requirements (Legal Information Institute), checked 2026-11-20
- 40 CFR 258.23, Explosive gases control (Legal Information Institute), checked 2026-11-20
- US EPA LMOP: Project Development Handbook, Chapter 1, checked 2026-11-20
- US EPA: National Overview, Facts and Figures on Materials, Wastes and Recycling, checked 2026-11-20
- Muianga et al., Lessons Learned from Air Quality Assessments in Communities Living near Municipal Solid Waste Landfills (Int J Environ Res Public Health, 2025), checked 2026-11-20
Data: US municipal solid waste landfill design requirements by component (40 CFR part 258)
A component-by-component compilation of the numeric design and care requirements for municipal solid waste landfills under 40 CFR part 258, compiled from the regulation text on the Legal Information Institute site and EPA's landfill overview. Each row gives the requirement as stated in the cited section.
Coverage: United States (federal criteria; states may be stricter).
| Design component | Parameter | Value | Unit | Regulation section |
|---|---|---|---|---|
| Composite liner, upper component | Minimum flexible membrane liner thickness | 30 | mil | 40 CFR 258.40(b) |
| Composite liner, upper component (HDPE) | Minimum thickness where the membrane is HDPE | 60 | mil | 40 CFR 258.40(b) |
| Composite liner, lower component | Minimum compacted soil thickness | 2 | feet | 40 CFR 258.40(b) |
| Composite liner, lower component | Maximum hydraulic conductivity of compacted soil | 1 x 10^-7 | cm/sec | 40 CFR 258.40(b) |
| Leachate collection system | Maximum leachate depth maintained over the liner | 30 | cm (less than) | 40 CFR 258.40(a)(2) |
| Performance-standard design | Maximum distance of point of compliance from unit boundary | 150 | meters | 40 CFR 258.40(d) |
| Gas control, facility structures | Maximum methane as a share of the lower explosive limit | 25 | percent of LEL | 40 CFR 258.23(a)(1) |
| Gas control, property boundary | Maximum methane as a share of the lower explosive limit | 100 | percent of LEL (must not exceed LEL) | 40 CFR 258.23(a)(2) |
| Gas monitoring | Minimum monitoring frequency | Quarterly | frequency | 40 CFR 258.23(b)(2) |
| Final cover, permeability | Maximum permeability (or that of bottom liner or subsoil, if lower) | 1 x 10^-5 | cm/sec | 40 CFR 258.60(a)(1) |
| Final cover, infiltration layer | Minimum earthen material thickness | 18 | inches | 40 CFR 258.60(a)(2) |
| Final cover, erosion layer | Minimum earthen material thickness (able to sustain native plants) | 6 | inches | 40 CFR 258.60(a)(3) |
| Post-closure care | Default post-closure care period | 30 | years | 40 CFR 258.61(a) |
Sources
- 40 CFR 258.40 Design criteria (accessed 2026-11-20)
- 40 CFR 258.23 Explosive gases control (accessed 2026-11-20)
- 40 CFR 258.60 Closure criteria (accessed 2026-11-20)
- 40 CFR 258.61 Post-closure care requirements (accessed 2026-11-20)
- US EPA: Municipal Solid Waste Landfills (accessed 2026-11-20)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.