Skip to main content
v2026.11,858 entries · CC-BY 4.0
LAC HealthMedical & Research SuppliesReagents, PPE & instruments — chain-of-custody documented.Fast, traceable sourcing built for regulated research environments, from bench consumables to instrumentation.Shop lac.us CodeCASRAIlac.us

MMWR Weeks: CDC Epidemiological Calendar and Rules

A comprehensive reference for CDC MMWR weeks: official business rules, date hierarchy, full 2025–2026 lookup tables, calculation algorithms, and code.

Written and maintained by CASRAI Editorial Board

Last updated

An MMWR week (Morbidity and Mortality Weekly Report week) is the standardized epidemiologic week designated by the Centers for Disease Control and Prevention (CDC) and state or local health departments to aggregate, track, and publish national notifiable disease incidence data. In epidemiological research, tracking disease transmission across strictly defined 7-day cycles removes calendar-month distortions and stabilizes comparisons across reporting jurisdictions.

Definition and Official CDC Rules

The National Notifiable Diseases Surveillance System (NNDSS) governs the business rules for assigning MMWR weeks across public health surveillance systems in the United States:

  • First Day of the Week: Every MMWR week begins on Sunday at 00:00 and ends on the following Saturday at 23:59.
  • Sequential Numbering: Weeks are numbered sequentially from 1 to 52 or 53 within each epidemiologic year.
  • The 4-Day / First Wednesday Rule: MMWR Week 1 of any given year is defined as the first week of the calendar year that contains at least four days in that year. Equivalently, MMWR Week 1 is the week containing the first Wednesday of January.
  • Year Boundary Handling: If January 1 occurs on a Sunday, Monday, Tuesday, or Wednesday, that calendar week is designated as MMWR Week 1 of the new year. If January 1 occurs on a Thursday, Friday, or Saturday, the calendar week containing January 1 is designated as the final week (Week 52 or Week 53) of the previous MMWR year.
  • December Days in Week 1: Because of the 4-day rule, December 29, 30, and 31 frequently fall into MMWR Week 1 of the following calendar year.
  • 52 vs 53 Weeks: While most years comprise 52 weeks, years with 53 weeks occur every 5 to 6 years to compensate for the fractional day in solar years and leap-year shifts. MMWR year 2025 contains 53 weeks, whereas MMWR year 2026 contains 52 weeks.

The Epidemiologic Date Hierarchy

In public health surveillance systems, disease events undergo multiple processing checkpoints before arriving at CDC. According to the CDC NNDSS technical standards, reporting jurisdictions assign MMWR weeks using an established hierarchy of dates:

  1. Date of disease onset: The date clinical symptoms first manifested in the patient.
  2. Date of diagnosis: The date a medical provider established the clinical or syndromic diagnosis.
  3. Date of laboratory result: The date diagnostic confirmatory findings (e.g., PCR or serology) were recorded.
  4. Date of first report to the public health system: The earliest timestamp when a local, county, district, or state health authority received notice.
  5. State or MMWR report date: The administrative transmission date to state surveillance databases or CDC.

Under National Electronic Disease Surveillance System (NEDSS) messaging architectures, surveillance platforms capture illness onset, diagnosis date, specimen collection date, laboratory confirmation, public health notification, and CDC transmission timestamps. Assigning the earliest robust date in the hierarchy prevents sporadic spikes in reported incidence caused by batched administrative processing.

Official CDC MMWR Week Lookup Calendar (2025–2026)

The following lookup table is copied directly from the official CDC/NNDSS MMWR Week Log (2025–2026). It documents the precise start (Sunday) and end (Saturday) dates for all weeks in 2025 and 2026:

2025 Week 2025 Start Date 2025 End Date 2026 Week 2026 Start Date 2026 End Date
1 12/29/2024 1/4/2025 1 1/4/2026 1/10/2026
2 1/5/2025 1/11/2025 2 1/11/2026 1/17/2026
3 1/12/2025 1/18/2025 3 1/18/2026 1/24/2026
4 1/19/2025 1/25/2025 4 1/25/2026 1/31/2026
5 1/26/2025 2/1/2025 5 2/1/2026 2/7/2026
6 2/2/2025 2/8/2025 6 2/8/2026 2/14/2026
7 2/9/2025 2/15/2025 7 2/15/2026 2/21/2026
8 2/16/2025 2/22/2025 8 2/22/2026 2/28/2026
9 2/23/2025 3/1/2025 9 3/1/2026 3/7/2026
10 3/2/2025 3/8/2025 10 3/8/2026 3/14/2026
11 3/9/2025 3/15/2025 11 3/15/2026 3/21/2026
12 3/16/2025 3/22/2025 12 3/22/2026 3/28/2026
13 3/23/2025 3/29/2025 13 3/29/2026 4/4/2026
14 3/30/2025 4/5/2025 14 4/5/2026 4/11/2026
15 4/6/2025 4/12/2025 15 4/12/2026 4/18/2026
16 4/13/2025 4/19/2025 16 4/19/2026 4/25/2026
17 4/20/2025 4/26/2025 17 4/26/2026 5/2/2026
18 4/27/2025 5/3/2025 18 5/3/2026 5/9/2026
19 5/4/2025 5/10/2025 19 5/10/2026 5/16/2026
20 5/11/2025 5/17/2025 20 5/17/2026 5/23/2026
21 5/18/2025 5/24/2025 21 5/24/2026 5/30/2026
22 5/25/2025 5/31/2025 22 5/31/2026 6/6/2026
23 6/1/2025 6/7/2025 23 6/7/2026 6/13/2026
24 6/8/2025 6/14/2025 24 6/14/2026 6/20/2026
25 6/15/2025 6/21/2025 25 6/21/2026 6/27/2026
26 6/22/2025 6/28/2025 26 6/28/2026 7/4/2026
27 6/29/2025 7/5/2025 27 7/5/2026 7/11/2026
28 7/6/2025 7/12/2025 28 7/12/2026 7/18/2026
29 7/13/2025 7/19/2025 29 7/19/2026 7/25/2026
30 7/20/2025 7/26/2025 30 7/26/2026 8/1/2026
31 7/27/2025 8/2/2025 31 8/2/2026 8/8/2026
32 8/3/2025 8/9/2025 32 8/9/2026 8/15/2026
33 8/10/2025 8/16/2025 33 8/16/2026 8/22/2026
34 8/17/2025 8/23/2025 34 8/23/2026 8/29/2026
35 8/24/2025 8/30/2025 35 8/30/2026 9/5/2026
36 8/31/2025 9/6/2025 36 9/6/2026 9/12/2026
37 9/7/2025 9/13/2025 37 9/13/2026 9/19/2026
38 9/14/2025 9/20/2025 38 9/20/2026 9/26/2026
39 9/21/2025 9/27/2025 39 9/27/2026 10/3/2026
40 9/28/2025 10/4/2025 40 10/4/2026 10/10/2026
41 10/5/2025 10/11/2025 41 10/11/2026 10/17/2026
42 10/12/2025 10/18/2025 42 10/18/2026 10/24/2026
43 10/19/2025 10/25/2025 43 10/25/2026 10/31/2026
44 10/26/2025 11/1/2025 44 11/1/2026 11/7/2026
45 11/2/2025 11/8/2025 45 11/8/2026 11/14/2026
46 11/9/2025 11/15/2025 46 11/15/2026 11/21/2026
47 11/16/2025 11/22/2025 47 11/22/2026 11/28/2026
48 11/23/2025 11/29/2025 48 11/29/2026 12/5/2026
49 11/30/2025 12/6/2025 49 12/6/2026 12/12/2026
50 12/7/2025 12/13/2025 50 12/13/2026 12/19/2026
51 12/14/2025 12/20/2025 51 12/20/2026 12/26/2026
52 12/21/2025 12/27/2025 52 12/27/2026 1/2/2027
53 12/28/2025 1/3/2026 — — —

Which MMWR Week Ends in 2026?

A frequent query in surveillance operations is determining which MMWR weeks end within the 2026 calendar year:

  • MMWR Year 2025, Week 53: Runs from Sunday, December 28, 2025, and ends on Saturday, January 3, 2026. This is the first MMWR week that concludes in calendar year 2026.
  • MMWR Year 2026, Weeks 1 through 51: Week 1 begins on Sunday, January 4, 2026 (ending Saturday, January 10, 2026). Weeks 1 through 51 conclude consecutively on Saturdays throughout 2026, with Week 51 ending on Saturday, December 26, 2026.
  • MMWR Year 2026, Week 52: Begins on Sunday, December 27, 2026, and ends on Saturday, January 2, 2027. Therefore, MMWR 2026 Week 52 does not end in 2026; it concludes in calendar year 2027.

Mathematical Formula and Calculation Rules

To calculate the MMWR week and year algorithmically from any given date D:

  1. Find the Sunday preceding or equal to D: Sunday(D) = D - DayOfWeek(D), where Sunday = 0, Monday = 1, …, Saturday = 6.
  2. Identify the Wednesday of that week: Wednesday(D) = Sunday(D) + 3 days.
  3. The MMWR year Y assigned to the date is the calendar year of that Wednesday: Y = Year(Wednesday(D)).
  4. Determine the first Wednesday of year Y, denoted W1(Y).
  5. Compute the MMWR week number: MMWR_Week = 1 + floor((Wednesday(D) - W1(Y)) / 7 days).

Worked Example 1: Date January 1, 2026

Evaluating calendar date 2026-01-01:

  • Day of week: January 1, 2026 falls on a Thursday.
  • Preceding Sunday: 2025-12-28.
  • Associated Wednesday: 2025-12-31.
  • MMWR Year assignment: Because the Wednesday belongs to 2025, the assigned MMWR Year is 2025.
  • First Wednesday of 2025: January 1, 2025 (2025-01-01).
  • Days elapsed between Wednesdays: 2025-12-31 - 2025-01-01 = 364 days.
  • Week calculation: 1 + (364 / 7) = 1 + 52 = 53.
  • Result: January 1, 2026 belongs to MMWR Year 2025, Week 53.

Worked Example 2: Date January 6, 2026

Evaluating calendar date 2026-01-06:

  • Day of week: January 6, 2026 falls on a Tuesday.
  • Preceding Sunday: 2026-01-04.
  • Associated Wednesday: 2026-01-07.
  • MMWR Year assignment: The Wednesday belongs to 2026, so the MMWR Year is 2026.
  • First Wednesday of 2026: January 7, 2026 (2026-01-07).
  • Days elapsed between Wednesdays: 2026-01-07 - 2026-01-07 = 0 days.
  • Week calculation: 1 + (0 / 7) = 1.
  • Result: January 6, 2026 belongs to MMWR Year 2026, Week 1.

Surveillance Code Implementations (Python, R, Excel)

Data engineering and surveillance analytics pipelines in biostatistics and epidemiology automate MMWR week calculations across data intake feeds.

Python Implementation

import datetime

def get_mmwr_week(dt: datetime.date):
    # Sunday is index 0
    day_of_week = (dt.weekday() + 1) % 7
    sun = dt - datetime.timedelta(days=day_of_week)
    wed = sun + datetime.timedelta(days=3)
    mmwr_year = wed.year
    
    # First Wednesday of mmwr_year
    jan1 = datetime.date(mmwr_year, 1, 1)
    jan1_dow = (jan1.weekday() + 1) % 7
    first_sun = jan1 - datetime.timedelta(days=jan1_dow)
    first_wed = first_sun + datetime.timedelta(days=3)
    if first_wed.year != mmwr_year:
        first_wed += datetime.timedelta(days=7)
        
    mmwr_week = 1 + ((wed - first_wed).days // 7)
    return mmwr_year, mmwr_week

# Example
year, week = get_mmwr_week(datetime.date(2026, 1, 6))
print(f"MMWR Year: {year}, Week: {week}")  # Returns 2026, Week 1

R Implementation

# Using the lubridate package
library(lubridate)

sample_date <- as.Date("2026-01-06")
epi_week_num <- epiweek(sample_date)
epi_year_val <- epiyear(sample_date)

cat(sprintf("MMWR Year: %d, Week: %dn", epi_year_val, epi_week_num))

Excel Formula Implementation

In Microsoft Excel, when date cell A2 contains the observation date, calculating the epidemiologic week uses the midpoint Wednesday logic. The Wednesday date formula is: =A2-MOD(A2-1,7)+3. Comparing this midpoint to the first Wednesday of that calendar year yields the exact MMWR week without requiring third-party macros.

Role in Public Health Practice and Research Administration

Public health reporting jurisdictions transmit aggregated case files through NNDSS feeds, which feed national surveillance platforms including CDC WONDER and the weekly MMWR summary publications. While distinct from broader public health administration frameworks, consistent week numbering guarantees that seasonal pathogen curves—such as respiratory syncytial virus, seasonal influenza (conventionally tracked from Week 40 to Week 39), and vector-borne diseases—remain directly comparable across calendar decades. Institutional studies linking pathogen surveillance datasets to observational cohorts should formalize week assignment methods within their research data management plans.

Frequently Asked Questions

Which MMWR week ends in 2026?

MMWR Year 2025 Week 53 is the first MMWR week ending in 2026 (concluding on Saturday, January 3, 2026). MMWR Year 2026 Weeks 1 through 51 end consecutively on Saturdays through December 26, 2026. MMWR Year 2026 Week 52 concludes in 2027 (on Saturday, January 2, 2027).

How does an MMWR week differ from an ISO 8601 week?

An MMWR week begins on Sunday and ends on Saturday, with Week 1 requiring at least 4 days in the new calendar year (the week containing the first Wednesday). An ISO 8601 week begins on Monday and ends on Sunday, with Week 1 defined as the week containing the first Thursday of the year.

Why do some MMWR years have 53 weeks?

A standard 52-week calendar contains 364 days. Because solar years contain 365 or 366 days, approximately 1.25 extra days accumulate annually. To keep epidemiologic weeks synchronized with the solar calendar, the CDC inserts an extra 53rd week approximately every 5 to 6 years (e.g., 2020 and 2025).

Which date field should researchers use to assign MMWR week?

Following NNDSS guidelines, researchers and state health agencies prioritize Date of Illness Onset when available. If onset is unrecorded, the established hierarchy proceeds to Date of Diagnosis, Date of Laboratory Result, and Date of First Report to the Public Health System.

Sources

Follow CASRAI

Research-administration guidance, standards updates and independent tool reviews.

Ask CASRAI · free to try

Ask about MMWR Weeks: CDC Epidemiological Calendar and Rules

Ask your first 2 questions free below. Subscribers get 150 a day for $29 a month.

An AI assistant specialized in research administration. It cites the sources behind every answer, labels web answers and says when it can't answer.

Answers draw on CASRAI's guides and dictionary plus the federal and funder documents we index: Federal Register, Grants.gov, Regulations.gov and UKRI.

Works on this site and inside Claude, Cursor and the AI tools you already use.

Everything CASRAI publishes — this page, the dictionary, the guides and the news — stays free to read, with no account and no card.

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →