NCAMP: National Center for Advanced Materials Performance Explained

NCAMP qualifies aerospace composites into a shared database. See how qualification and equivalency work and why allowables are not design values.

Written and maintained by CASRAI Editorial Board

Published

On this page

NCAMP, the National Center for Advanced Materials Performance, is a center within the National Institute for Aviation Research (NIAR) at Wichita State University. It works with the FAA and industry partners to qualify aerospace material systems, generate statistically based allowables for them, and publish the results in a shared materials database that anyone can view. A manufacturer can take a qualified material from that database and show equivalency with a smaller test program instead of repeating the full qualification.

What NCAMP is and where it came from

Wichita State describes NCAMP as a program that began as an FAA-funded effort inside NIAR and stemmed from NASA’s 1995 Advanced General Aviation Transport Experiment (AGATE), which NIAR led. Before AGATE, individual companies ran customized qualification programs, each detailed and expensive, and most programs ended up reusing materials that had already been qualified for another program. AGATE introduced a shared-database process in which a manufacturer selects a pre-approved composite material system and runs a smaller subset of testing for its specific application. That subset is called equivalency. NCAMP’s own standard operating procedure, NSP 100, says the NCAMP process keeps every key procedure of the AGATE process.

The standard operating procedure is open about why the system exists. Aircraft companies historically had to run their own qualification and data-acquisition programs, the data stayed proprietary, and different companies ended up with multiple specifications for the same material and repeated the same work. The FAA, which often had to oversee those programs, faced a redundant workload as well. NCAMP promotes what the procedure calls “One Material One Specification”.

This guide covers the laboratory and documentation side of that system: what the qualification workflow looks like, how equivalency differs, and what the published numbers do and do not give a user. It does not cover how to cure or lay up a composite; see the lab operations hub for related bench practice. For the discipline context, see materials science.

How NCAMP qualification works

NSP 100 Revision G (27 March 2017) describes the qualification and property-data process. The data generated are intended to meet the pedigree requirements for submission to the Complete Documentation sections of Composite Materials Handbook 17 (CMH-17), and the allowables are calculated with CMH-17 procedures. In the NCAMP process, qualification and allowable generation happen concurrently: the same data are used to generate allowables and to set material specification limits. The sequence, as the procedure lays it out, is:

  1. Draft documents. A test plan, a material specification and a process specification are drafted, usually from templates taken from earlier programs that NCAMP members have already reviewed. Program participants (including the material supplier and manufacturer-board members) review them.
  2. Engineering review and approval. The documents are released under revision control and sent to an NCAMP Authorized Engineering Representative (AER), who recommends approval using NCAMP Form 289-3. Participants, including at least one Manufacturers Advisory Board member and at least one Suppliers Advisory Board member, must agree, and NCAMP staff then sign for the members. At this stage most specification limits are marked TBD and the specification is stamped “FOR TEST USE ONLY”.
  3. Process control document. The material supplier prepares a Process Control Document (PCD) for producing the qualification material, released under revision control before that material is made.
  4. Panel fabrication under inspection. Panels are not fabricated until the specifications and test plan are approved and the NCAMP Authorized Inspection Representative (AIR) has received Form 168-10, the request for inspection verification. The AIR records results on Form 168-1. Any deviation is dispositioned by the AER, who may accept the panels as-is or require rework and re-inspection.
  5. Panel and specimen checks. Panels are typically inspected for thickness, warpage and outer-ply orientation before through-transmission ultrasonic inspection. Specimens machined from them go through a second inspection verification.
  6. Witnessed testing. The AER witnesses the testing and accepts or rejects the data on Form 289-3. The procedure says AERs are typically asked to witness at least one specimen per test method per test condition per test program.
  7. Statistics, review and release. NCAMP generates allowables such as B-basis values and the material specification limits. The supplier revises its PCD to include the limits, the manufacturer-board members review the PCD and audit the supplier again, and NCAMP staff then sign the PCD on behalf of the members and release the documents.

Specification limits are derived from the qualification data using a probability of rejecting a good property (alpha) of 0.01, per DOT/FAA/AR-03/19 and CMH-17. The same procedure notes that the cost of qualifying a new material form or manufacturing process can be substantial, because research is needed to understand the new material and process. NCAMP’s page defines B-basis as a 95 % lower confidence bound on the 10th percentile of a specified population, and it publishes educational calculators such as a K factor calculator and a B-basis distribution simulator.

Who is involved: boards and representatives

NSP 100 defines three NCAMP boards: the Regulatory Governing Board (RGB, made up of the U.S. Air Force, Army, FAA, NASA and Navy), the Manufacturers Advisory Board (MAB, original equipment manufacturers and their tier-1 suppliers) and the Suppliers Advisory Board (SAB, material suppliers and tier-2 and tier-3 suppliers). Separately, AERs and AIRs are individuals authorized under NCAMP application programs to review engineering documents and verify inspection records. The data table below sets out these roles and the three NCAMP forms side by side.

Qualification versus equivalency

Qualification produces the dataset and allowables. Equivalency lets a later user show that it can reproduce the original properties, using NSP 100’s definition: a comparison between a larger qualification dataset (typically 3 or 5 batches) and a smaller equivalency dataset (typically 1 or 2 batches). The part fabricator buys material to the same material specification and fabricates panels to the NCAMP process specification; the one-batch properties are compared statistically with those from the original qualification.

Point of comparison Material qualification Equivalency
Purpose Qualify a material into a specification and generate allowables concurrently Show a follow-on fabricator can reproduce the original properties
Typical dataset 3 or 5 batches 1 or 2 batches (NSP 100 describes a one-batch panel program as the general case)
Statistical setting Specification limits from qualification data at a rejection probability (alpha) of 0.01 Alpha usually 0.05; one retest per property is allowed, reducing the actual probability to 0.0025 (0.25 %)
Test-method statistics CMH-17 approved procedures (ASAP and STAT17 spreadsheets named in NSP 100) HYpothesis Testing of EQuivalence (HYTEQ) spreadsheet, using DOT/FAA/AR-03/19 and CMH-17 test statistics
Scope of change covered New material or process Minor changes only; major changes may make the process inadequate
Reports Material property data report and qualification statistical analysis report Equivalency statistical analysis report, usually treated by NCAMP as customer-proprietary

NSP 100 states that the cost of using pre-qualified data, allowables and specifications through equivalency is often about 10 % to 15 % of the cost of a new qualification and allowables program. It also warns that equivalency has to be judged program by program: the applicant and the certifying agency must agree that the equivalency test plan is adequate, and they must examine differences between the original fabricator and the follow-on fabricator. The procedure’s own example is site elevation. Panels originally made at sea level and follow-on panels made at a higher elevation, such as Denver, could behave differently for out-of-autoclave cure systems, so the test plan has to be tailored to examine that.

Allowables are not design values

The most useful practical point in NSP 100 is also the easiest to miss. It defines a material allowable as a statistically based strength value such as an A- or B-basis value, and a material design value as a value actually used to design structure and compliant with governing regulations, generally derived from allowables adjusted for the real layup, operating temperatures and expected moisture environment. In most cases, it says, published NCAMP allowables are not directly usable as design values that satisfy all regulatory requirements, and additional testing is usually needed.

The procedure also lists what the user still owes. Material users must, at a minimum and not limited to these, perform regular purchaser quality-control tests, perform periodic equivalency or additional testing, take part in material change management, carry out the statistical process control actions defined in their specification, and conduct regular supplier audits. It adds that using the same material and process specification matters because deviation can change composite properties and invalidate the data and allowables; minor deviation in fabricating complex parts is common but must be justified by analysis or test as the certifying agencies require. NCAMP assumes no liability for use of the data, allowables or specifications.

Regulator acceptance and the standards around NCAMP

NCAMP’s page links an FAA memorandum and an EASA memorandum. The EASA document is Certification Memorandum EASA CM-S-004 Issue 01, issued 14 January 2014, titled “Composite Materials – Shared Databases: Acceptance of Composite Specifications and Design Values Developed using the NCAMP Process”. It cites CS 2X.603, 2X.605 and 2X.613, CS-E 70 and CS-P 170 as the regulatory requirements concerned. The memo states that EASA certification memoranda are non-binding guidance provided for information, not acceptable means of compliance, and do not create new certification requirements.

On the FAA side, Wichita State’s 2019 news release cites FAA Policy Memo AIR100-2010-120-003, “Acceptance of Composite Specifications and Design Values Developed”, which recognizes the NCAMP process. NSP 100 adds that the earlier AGATE process was recognized as an acceptable means of showing compliance with 14 CFR Part 23.613 through an FAA Small Airplane Directorate policy memorandum (ACE-00-23.613-01).

NCAMP sits among several organizations that play different roles, summarized below from the sources listed at the end of this guide.

Body Role relative to NCAMP
NCAMP (Wichita State, NIAR) Runs qualification and equivalency programs and maintains the shared material property database and NCAMP specifications
CMH-17 Source of the statistical procedures and guidelines used for allowables; NCAMP data are generated to its requirements for publication in its Complete Documentation sections
SAE International In a 2019 agreement with NCAMP, develops aerospace material and process specifications for composites (AMS P-17 committee) and non-metal additive manufacturing (AMS-AM Nonmetals committee); industry may use either NCAMP specifications or SAE AMS
FAA and EASA Regulators; the FAA sits on the NCAMP Regulatory Governing Board, and both have issued memoranda on NCAMP-developed specifications and values

What the shared database covers

NCAMP’s page groups qualified material systems into additive manufacturing materials, core materials, thermoset prepregs, vacuum-assisted resin transfer molding (VARTM) thermosets, thermoset repair materials and thermoplastic materials. Examples named there include Hexcel 8552 prepreg systems, a Toray thermoplastic (TC1225) and Victrex LMPAEK unidirectional tapes. Separate lists show proprietary completed and upcoming programs, which are labeled proprietary on the page, and upcoming publishable programs. Visitors can sign up on the NCAMP portal to review process reports before approval or to receive newsletters about new materials. NCAMP also publishes process-control-document guides for prepreg (NRP 101) and polyacrylonitrile-based carbon fiber (NRP 102).

Where it matters for labs and research teams

For a research laboratory, NCAMP matters in three practical ways. First, a materials supplier can qualify a system through NCAMP without being tied to a specific aircraft certification program, according to the NCAMP page, so a qualified system can reach the market through a public forum with generated allowables. Second, an SOP such as NSP 100 is itself a model of controlled documentation: numbered forms, named roles, deviation disposition and review before release. Third, the process-control mindset is a close relative of the quality-by-design thinking described in the guide to Quality by Design, although NCAMP’s own sources do not use that framing.

Common misunderstandings

  • “NCAMP-qualified means certified for my part.” NSP 100 says use of NCAMP specifications does not guarantee material or structural performance, and the applicability of data must be evaluated case by case by the applicant and the certifying agencies.
  • “Allowables can go straight into a stress analysis.” They usually need adjustment into design values and often supplementary testing.
  • “Equivalency covers any change.” It is designed for minor changes in material or process only.
  • “The database is a handbook of every composite.” It covers only the material systems NCAMP has qualified, and some programs are proprietary.

Sources

Data: NCAMP governing boards, inspection roles and process forms

Compilation of the organizational bodies, authorized representatives and numbered forms used in the NCAMP material qualification and equivalency processes, compiled from NCAMP's published standard operating procedure NSP 100 Revision G and the NCAMP program page.

Coverage: United States.

NCAMP governing boards, inspection roles and process forms
ElementKindWho is involvedRole in the NCAMP process
Regulatory Governing Board (RGB)BoardU.S. Air Force, Army, FAA, NASA and NavyRegulatory and government oversight of qualification and data-generation programs at procedural level
Manufacturers Advisory Board (MAB)BoardOriginal equipment manufacturers and their tier-1 suppliersReview draft documents and PCDs, audit the supplier, agree approvals; at least one MAB member must approve qualification documents
Suppliers Advisory Board (SAB)BoardMaterial suppliers, tier-2 and tier-3 suppliersAt least one SAB member must agree with and authorize approval of qualification documents
Authorized Engineering Representative (AER)RepresentativeIndividual authorized through an NCAMP application programReviews specifications and test plans, recommends approval, witnesses testing and accepts or rejects data; dispositions deviations
Authorized Inspection Representative (AIR)RepresentativeIndividual authorized through an NCAMP application programPerforms inspection verification of test panels and specimens and signs the inspection verification record
Form 289-3 Engineering AcceptanceFormSubmitted by an AERRecords recommended acceptance of documents and acceptance of witnessed test data
Form 168-10 Request for Inspection VerificationFormSubmitted by an AER or NCAMP to an AIRRequests inspection verification of test panels or specimens with specific instructions
Form 168-1 Inspection Verification RecordFormCompleted by the fabricating company or laboratory and an AIRDocuments inspection of panels and specimens and any deviations

Sources

Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.

Follow CASRAI

Research-administration guidance, standards updates and independent tool reviews.

Ask CASRAI · full access

Ask about NCAMP: National Center for Advanced Materials Performance Explained

Full access: large monthly usage, up to 10 source passages behind each answer, and MCP and API access for Claude Code, Codex and other CLIs. Cancel any time.

An AI assistant for research: funder rules, compliance, methods and publishing. It links the sources behind its answers and labels answers that come from a web search.

Answers draw on CASRAI's guides and dictionary plus the federal and funder documents we index: Federal Register, Grants.gov, Regulations.gov and UKRI.

Works on this site and inside Claude, Cursor and the AI tools you already use.

Everything CASRAI publishes — this page, the dictionary, the guides and the news — stays open to read, with no account and no card.

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →