Written and maintained by CASRAI Editorial Board
Published · Last updated
On this page
NSLS-II (the National Synchrotron Light Source II) is a U.S. Department of Energy Office of Science user facility at Brookhaven National Laboratory in Upton, New York. It is a medium-energy electron storage ring, operating at 3 billion electron-volts, that produces X-rays more than 10,000 times brighter than those of the original NSLS. Researchers from universities, laboratories and industry apply for beam time through a peer-reviewed proposal system rather than owning or building the instrument themselves.
Definition and scope
A synchrotron light source accelerates electrons around a ring and uses the radiation they emit as a probe for matter. NSLS-II is one of the DOE Office of Science X-ray light sources and is listed under the Basic Energy Sciences programme’s scientific user facilities. The DOE describes its research areas as condensed matter and materials physics, chemistry and biology, with applications in energy, biotechnology, nanotechnology and extreme conditions. It began operations in 2015, and the DOE reports 2,330 users in fiscal year 2025.
Light Sources of the World, the international directory of synchrotron facilities, lists 29 operational beamlines and 3 under construction at NSLS-II, covering radiation from the infrared through hard X-rays. It gives the storage ring’s beam current as 500 mA and its emittance as 0.55 nm rad horizontally and 0.008 nm rad vertically, and lists the facility’s technique families as X-ray imaging, high-energy-resolution analysis, operando studies, and multiscale or multimodal measurement.
The word “facility” matters for how the site fits into research administration. NSLS-II is not a funding body and does not award grants; it provides measurement capability. Researchers still need their own funding for travel, samples and staff time, and the facility’s own pages are the place to check what an allocation does and does not include.
How users get beam time
According to the NSLS-II User Guide, the facility operates in three four-month cycles. Beam time is requested for each cycle through PASS (Proposal Allocation, Safety, and Scheduling), the facility’s online system. Once time is allocated, users must complete a Safety Approval Form before the experiment can proceed. The sequence for a first-time general user, as the User Guide describes it, is:
- Submit a proposal in PASS for the cycle in which you want beam time.
- The proposal is peer reviewed by the Proposal Review Panel (PRP), which recommends how time is allocated.
- If time is allocated, complete the Safety Approval Form.
- Run the experiment in the allocated slot.
The access mode you choose determines how long an allocation stays valid and which reviewers see it. The data table below compares the five modes in the User Guide (General User, Rapid Access, Block Allocation Group, Partner User and Proprietary) by validity period, review route and scope, and each cell is taken from the User Guide’s proposal-types page.
Choosing between access modes
The User Guide’s own wording supports a few practical distinctions. A General User proposal stays valid for one year, or three cycles, so one proposal can cover repeat visits within that window. Rapid Access is designed for small amounts of time on one beamline and has a stated review turnaround of one to two weeks, but it is not retroactive and only certain beamlines accept it, so contacting beamline staff first is part of the process. A Block Allocation Group has a term of two years (six cycles) and is the route for a group whose programme needs recurring time across several beamlines. Partner User status is a longer-term arrangement in which each beamline reserves at most 35 percent of its time for all partner users combined.
Proprietary access is different in kind. It is for work whose results the user does not intend to publish. The User Guide says it proceeds under a DOE Class Waiver, is charged at the full-cost recovery rate, is reviewed by NSLS-II management, and requires a Proprietary Users Agreement before experiments begin. A non-proprietary project description is still required. The page does not state costs for the other four modes.
Pre-application checklist drawn from the User Guide
- Which cycle are you targeting? Beam time is requested per four-month cycle, and a General User proposal is valid for three cycles.
- Does the work fit Rapid Access? It applies only to certain beamlines, covers a small amount of time on one beamline, and is not retroactive, so it cannot be used to cover an experiment already carried out.
- Will results be published? Work intended to stay confidential falls under proprietary access, which has its own agreement and full-cost recovery rate.
- Do you need more than one beamline? General User proposals may name up to 3 beamlines and 2 CFN instruments; Block Allocation Groups may use up to five beamlines.
- Who will complete the Safety Approval Form once time is allocated, and what sample hazards must it describe?
Where it matters for chemistry labs
For a chemistry group, a synchrotron is a place to run measurements that bench instruments cannot, rather than a replacement for them. The DOE lists chemistry among NSLS-II’s research areas, and the technique families on the Light Sources of the World entry (imaging, high-energy-resolution analysis and operando measurement) give a sense of what can be asked of a beamline: structure, composition and how a material changes while it is working.
Lab managers and principal investigators encounter NSLS-II in three practical ways. First, as a planning constraint: because beam time is allocated per cycle, samples must be prepared, characterised in-house and shipped or carried on a schedule set by the cycle and the safety approval. Second, as a compliance step: the Safety Approval Form means that the hazards of samples and equipment brought to site are reviewed before the experiment. Third, as a source of data that feeds the group’s own record-keeping, so data management plans and funder reporting should account for work done at an external facility.
Groups new to diffraction methods may find the background on crystallography and X-ray crystallography useful before reading a beamline’s technique descriptions. For a comparable facility on the other side of the DOE’s light-source portfolio, see the guide to the Advanced Photon Source. For an example of how a DOE-linked research centre describes its work with such facilities, see the guide to SUNCAT. The broader field is introduced in what is chemistry.
Common misunderstandings
NSLS-II is not the original NSLS
The two are separate machines at the same laboratory. The DOE page describes NSLS-II’s X-rays as more than 10,000 times brighter than the original NSLS, and NSLS-II began operations in 2015. A reference to “NSLS” in an older paper may refer to the earlier facility.
Access is not open on demand
Beam time is allocated through peer review in set cycles. Even Rapid Access, the fastest route, requires proposal review and is limited to certain beamlines. Planning a measurement campaign around an assumed date is a risk until an allocation is confirmed.
Academic and proprietary access are different
The non-proprietary modes are described in the User Guide without cost statements, whereas proprietary work is charged at full-cost recovery under a separate agreement. The two should not be treated as interchangeable when budgeting.
It is not the only synchrotron
Light Sources of the World catalogues facilities internationally, and the DOE operates more than one X-ray light source. Which facility suits an experiment depends on the beamlines and techniques each offers, which the facilities themselves publish.
Frequently asked questions
What does NSLS-II stand for?
National Synchrotron Light Source II. It is the successor to the original National Synchrotron Light Source at Brookhaven National Laboratory.
Where is NSLS-II and who operates it?
It is at Brookhaven National Laboratory in Upton, New York, and is a DOE Office of Science scientific user facility under Basic Energy Sciences.
How many beamlines does it have?
Light Sources of the World lists 29 operational beamlines and 3 under construction, as read on 2026-11-12. The count changes as beamlines are commissioned, so check the facility’s own beamline list for the current figure.
How do I apply for beam time?
Submit a proposal through PASS for a given cycle. The facility runs three four-month cycles a year, and General User proposals are reviewed by the Proposal Review Panel.
How long is a General User proposal valid?
One year, which the User Guide equates to three cycles.
Can industry use NSLS-II?
Yes, under proprietary access: a DOE Class Waiver, the full-cost recovery rate, management review and a Proprietary Users Agreement. Industry users can also apply through the non-proprietary modes if the work is intended for publication.
Sources
- U.S. Department of Energy Office of Science, Basic Energy Sciences: NSLS-II, read 2026-11-12.
- Brookhaven National Laboratory, NSLS-II User Guide: Proposal Types, read 2026-11-12.
- Light Sources of the World: National Synchrotron Light Source II, read 2026-11-12.
Data: NSLS-II beam-time access modes: validity, review route and scope
Comparison of the five NSLS-II access modes (General User, Rapid Access, Block Allocation Group, Partner User, Proprietary) compiled from the facility's published User Guide proposal-types page; values are quoted or paraphrased from that page only.
Period covered: 2026. Coverage: United States.
| Access mode | Term or validity | Review route | Scope and conditions |
|---|---|---|---|
| General User | One year (three cycles) | Peer review by the Proposal Review Panel (PRP) | Up to 3 beamlines and 2 CFN instruments |
| Rapid Access | One cycle | PRP review, stated 1-2 week turnaround | Small amount of time on one beamline; not retroactive; certain beamlines only; contact staff first |
| Block Allocation Group | 2 years (6 beam time cycles) | Rigorous review by the Proposal Review Panel (PRP); beamline staff concurrence required for each proposed beamline | Up to five beamlines |
| Partner User | Typically up to three years (five in special cases) | PRP, then Science Advisory Committee, then management | Each beamline reserves at most 35% of time for all Partner Users; annual report required |
| Proprietary | Not stated on page | NSLS-II management | DOE Class Waiver; full-cost recovery rate; Proprietary Users Agreement before experiments; non-proprietary project description required |
Sources
- NSLS-II User Guide: Proposal Types (Brookhaven National Laboratory) (accessed 2026-11-12)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.







