A pilot line is a small, integrated manufacturing line that makes a new product at a scale between laboratory preparation and factory production. In battery research it turns electrode and cell development into real, production-format cells, using the same chain of steps a factory would, so that a chemistry proven in a coin cell can be tested in the larger format a customer would buy.
The term is used in several unrelated trades (hydraulic equipment catalogues list a “pilot line” component, and parachute rigging has a pilot-chute line), so this guide is limited to the manufacturing and research sense. The sources below come from US Department of Energy (DOE) national laboratories and the trade press that covers them; none of them gives a formal, standards-body definition, so the definition here describes how those laboratories use the word.
Definition and scope
In the DOE sources, a pilot line is described by what it does rather than by a size limit. The Pacific Northwest National Laboratory (PNNL) says its new prismatic cell line lets researchers “create, test and demonstrate real-world prismatic cells at an industrially relevant scale”, and its operations manager adds that this “helps our researchers bridge the gap between science and industry”. The trade report on the same line calls it a “pilot-scale prismatic manufacturing capability”.
Three features recur across the sources, and together they separate a pilot line from a laboratory bench:
- Integrated process steps. The PNNL line is 16 pieces of equipment that together fill a 1,400-square-foot laboratory space, covering coating through to finished cells.
- Production-format output. It makes prismatic cells (a rectangular format with a heavier metal casing), not only coin cells. Argonne National Laboratory’s earlier Cell Analysis, Modeling, and Prototyping (CAMP) Facility targets pouch cells and 18650 cylindrical cells as its prototype formats.
- A controlled environment. PNNL houses its line in a dry lab where, in its words, humidity is lower than the driest places on Earth, because even tiny amounts of water damage battery materials. Our guide to the dry room explains this class of space.
A pilot line is not a commercial plant. Nothing in these sources presents the PNNL or Argonne lines as producing cells for sale; they produce cells for testing, validation and collaboration. It is also not a glovebox or benchtop setup: the CAMP Facility’s own staging lists the glove box, the benchtop, the dry room and the pilot-scale equipment as separate rungs, which is why a glove box is a research tool at the bottom of the ladder rather than a small pilot line.
Why the gap between coin cell and pilot cell is the point
The clearest statement of the reason pilot lines exist comes from Mark Weller, a PNNL materials scientist and principal investigator on the prismatic project: “Making a coin cell takes a few milligrams of material; making a prismatic cell takes at least a kilogram.” He also warns that “you can’t assume that a chemistry that worked well in a coin cell will work just as well in a prismatic cell.” Material quantity is the first obstacle, and behaviour at the larger size is the second.
Argonne’s CAMP presentation to the DOE Vehicle Technologies Office (June 2015) frames the same gap from the research side. It lists, as a barrier, the need for “independent validation analysis of newly developed battery materials … in cell formats with at least 0.2 Ah before larger scale industrial commitment”. It also notes that researchers are often unable to supply the quantities of novel material needed to make a full-size vehicle cell, and describes the facility as ideally sized for exploring new materials in quantities as small as 50 grams of active material.
The same slide sets out a scale ladder in battery capacity: coin cells at 4 mAh, the CAMP zone at 400 mAh and plug-in hybrid or electric-vehicle cells at 40 Ah, each step roughly a hundredfold. The data table below puts these markers and the PNNL material-quantity statements side by side.
How a pilot line is used in practice
The PNNL prismatic line: the process route
The trade report ESS News lists the sequence the PNNL line performs, in order:
- Slurry coating onto copper and aluminum foils
- Calendaring
- Slitting
- Notching
- Z-stacking
- Tab welding
- Cell enclosure sealing
- Electrolyte filling
- Formation cycling
Weller describes the electrode coater as “the heart and soul of our prismatic line”, and, of the filling step, says that “once we seal that filling port, the cell’s assembled, and we can go take it, do testing, and start our research”. The route is the general point: a pilot line is valuable because every step from electrode coating to formation is exercised in sequence, so a problem that only appears when the steps interact can be found before industry commits to a process.
The line completed testing in February 2026, according to PNNL, and its operating procedures were still being finalised before a major validation project began. That is a useful reminder that a pilot line has its own commissioning phase before it produces research-grade data.
The CAMP approach: staged validation
The Argonne CAMP slides set out the working method as a sequence rather than a single machine. Researchers submit materials with promising energy density; small hand-coated electrodes are made; coin cells are made and tested; larger samples of material are obtained; longer lengths of electrode are made from the scaled material; pouch cells or 18650 cells are made and tested; and extensive diagnostics and electrochemical modelling follow for promising technologies. The slide labels the environments involved as glove box, benchtop, dry room and pilot scale.
Two features of that method apply to any pilot line. Work is gated: a material moves to the larger format only after the smaller one looks promising. And the facility serves outside groups, since the same presentation reports supplying electrodes to others through an Electrode Library and building pouch cells for DOE-funded awards.
Related concepts and where the pilot line sits
Pilot line versus prototype lab versus factory
No source here gives numeric boundaries between these levels, so none are asserted. What the sources do support is a difference in purpose. The coin cell is a screening vehicle for a chemistry. The prototype or pilot cell tests whether the chemistry survives production-format processing and gives independent validation data. The factory is the commercial step that follows. The pilot line’s job is the middle one: it is the “bridge” PNNL’s operations manager refers to.
Pilot lines and readiness levels
Readiness scales describe where a technology stands on the path from idea to production. Our guides to technology readiness level (TRL) and manufacturing readiness level (MRL) explain those frameworks. A pilot line is a facility rather than a level on either scale, but its output (production-format cells made by a production-like process) is the kind of evidence that the manufacturing-oriented stages of such scales ask for.
Autonomous pilot lines
On 30 October 2026 PNNL announced the Battery Manufacturing (BattMan) Accelerator, a DOE consortium it leads with Oak Ridge National Laboratory, Argonne National Laboratory and the National Laboratory of the Rockies, plus the University of Washington, Binghamton University, the University of Alabama, Arizona State University and the University of Michigan-Dearborn. The release says BattMan “will build on the autonomous laboratory concept by advancing autonomous pilot lines”, aiming to cut scale-up time and cost. It is funded through DOE’s Advanced Materials and Manufacturing Technologies Office. The near-term work is high-throughput experimentation, automated synthesis and characterisation and digital manufacturing tools; the long-term aim is self-optimising manufacturing systems that use real-time data, digital twins and closed-loop control.
Where a pilot line matters for labs and research offices
Independent validation of new chemistries
PNNL chose two chemistries to validate on its prismatic line: sodium-ion and lithium iron phosphate. According to PNNL, sodium is more abundant than lithium, and lithium iron phosphate uses more abundant materials and tends to be safer. The planned tests assess performance and safety under varying conditions and are intended to set a baseline that collaborators can build on.
Access as a user facility
The PNNL line sits within the Grid Storage Launchpad in Richland, Washington, which is funded by the DOE Office of Electricity and operated by PNNL. ESS News describes it as a national user facility with access through structured programmes at the facility, and PNNL says it hopes to work with private battery companies that want to test their own chemistries in prismatic format. For a research office, the practical point is that the PNNL line is offered as an external-access resource through the facility’s programmes, so the route to it is collaboration with the laboratory.
Why manufacturing questions are raised early
Xiao, a PNNL Battelle Fellow, is quoted in the BattMan release saying research efforts “don’t always prioritize manufacturing issues like processability, repeatability, cost and scale-up risks”. A pilot line is where those issues become measurable. It also changes logistics: cells made for testing at partner sites are shipped as lithium batteries, which is covered in our guide to lithium battery shipping regulations. PNNL itself is profiled in the PNNL guide.
Common misunderstandings
“A coin-cell result carries over to the larger cell”
It may not. Weller’s warning quoted above is the direct answer: a chemistry that worked well in a coin cell cannot be assumed to work as well in a prismatic cell. That is the reason the validation step exists.
“A pilot line is a small factory”
The sources describe it as a place to create, test and demonstrate cells and to validate designs, not to supply the market. Its output is data and demonstration cells, and its stated purpose is to shorten the path to commercial scale, as the BattMan release puts it.
“A pilot line is just the equipment”
The equipment is only part of it. The PNNL line depends on its dry-lab environment, on testing and commissioning (completed February 2026) and on written operating procedures, and the CAMP Facility depended on staged handling from glove box to pilot-scale equipment, with diagnostics and modelling afterwards.
“Pilot line and pilot plant mean different things”
The DOE sources used here speak of pilot lines and pilot-scale equipment for cell manufacturing. They do not discuss pilot plants, so no distinction is drawn here.
Sources
- PNNL: New Prismatic Line Unlocks Powerful Possibilities for U.S. Battery Research, checked 2026-11-17
- ESS News: US national lab commissions first prismatic battery cell line in DOE complex, checked 2026-11-17
- PNNL via Newswise: New DOE consortium advances SI-driven battery manufacturing to strengthen U.S. competitiveness, checked 2026-11-17
- US DOE Vehicle Technologies Office: Cell Analysis, Modeling, and Prototyping (CAMP) Facility Research Activities, Argonne National Laboratory (2015 Annual Merit Review), checked 2026-11-17
Data: Scale markers for moving a battery chemistry from coin cell to pilot-scale cell
Compiled from a 2015 Argonne CAMP Facility presentation to the DOE Vehicle Technologies Office and a 2026 PNNL/ESS News account of the prismatic cell line. Each row is a stated scale marker (capacity or material quantity) at one stage between lab coin cell and production-format cell; nothing is estimated.
Period covered: 2015, 2026. Coverage: United States (DOE national laboratories).
| Stage or marker | Format or context | Stated scale figure | Where stated |
|---|---|---|---|
| Coin cell | Lab screening cell (Argonne CAMP slide) | 4 mAh capacity | Argonne CAMP, 2015 |
| CAMP zone | Prototype cells between coin and vehicle size (Argonne CAMP slide) | 400 mAh capacity | Argonne CAMP, 2015 |
| PHEV/EV cell | Plug-in hybrid or electric-vehicle size cell (Argonne CAMP slide) | 40 Ah capacity | Argonne CAMP, 2015 |
| Minimum cell size for independent validation | Cell format barrier named by the facility | At least 0.2 Ah | Argonne CAMP, 2015 |
| Active material needed at CAMP scale | Quantity the facility is sized to explore | As little as 50 grams of active material | Argonne CAMP, 2015 |
| Coin cell build | Material used per cell (PNNL) | A few milligrams of material | PNNL and ESS News, 2026 |
| Prismatic cell build | Material used per cell (PNNL) | At least a kilogram of material | PNNL and ESS News, 2026 |
Sources
- Cell Analysis, Modeling, and Prototyping (CAMP) Facility Research Activities, Argonne National Laboratory (accessed 2026-11-17)
- PNNL: New Prismatic Line Unlocks Powerful Possibilities for U.S. Battery Research (accessed 2026-11-17)
- ESS News: US national lab commissions first prismatic battery cell line in DOE complex (accessed 2026-11-17)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.