Skip to main content
v2026.11,610 entries · CC-BY 4.0

Ask a research-administration question

Answers are drawn from CASRAI and the rest of the CASRAI corpus, with a link to every source.

Answers are AI-generated from CASRAI’s own published pages and can be wrong, so check the linked sources before relying on one; your question is logged without personal data — never sold, never used to train a third-party model — to show us what CASRAI is missing, so please do not type personal or confidential details. How we use this

CASRAI is the reference for research administration — bookmark it for the next question.

Advanced Extraction Labs EXXA Series C1D1 Indoor Booth

Advanced Extraction Labs

Advanced Extraction Labs EXXA Series C1D1 Indoor Booth

in Extraction Systems

$99,011.90 - $169,947.70

In stock

Price varies by Size.

Large-format C1D1 indoor extraction booth at 20 ft wide by 10 ft high, in 20, 30 and 40 ft lengths (EXX20, EXX30, EXX40). Large front doors allow full-size extraction equipment to be moved in and out after installation, and the booth can be configured as a dual-zone environment. Construction is modular, so the enclosure can be expanded rather than replaced.

Size

Choose Size to continue.

Buying through procurement?

Generate a formal quotation for 1 × this item, plus our W-9 — everything your finance department needs to raise a purchase order.

Choose Size to continue.

Description

The EXXA Series is the high-throughput indoor booth in this range, built around access. Its large front doors are sized to move extraction equipment in and out of the booth after it has been erected – a practical distinction, because in a smaller classified enclosure the equipment often has to be positioned before the walls close around it, which makes later replacement or servicing far more disruptive.

Footprints as listed

  • EXX20 – 20 ft W x 10 ft H x 20 ft L
  • EXX30 – 20 ft W x 10 ft H x 30 ft L
  • EXX40 – 20 ft W x 10 ft H x 40 ft L

The booth can be built as a dual-zone environment, and is supplied with the series’ safety and gas detection systems. It is stated to be compatible with all extraction types this range covers, including cannabinoid (CBD and THC) extraction. Construction is modular, so the enclosure can be extended later rather than replaced.

Area classification and occupancy approval rest with your local authority having jurisdiction. Confirm the engineering and certification package included with your configuration before ordering.

Frequently asked questions

What sizes are available?+

Three lengths at a fixed 20 ft width and 10 ft height: EXX20 at 20 ft long, EXX30 at 30 ft and EXX40 at 40 ft. At 20 ft wide these are the widest indoor booths in the range apart from ZETA.

What is a dual-zone configuration?+

The booth can be built as two zones within one enclosure, which is how extraction is normally separated from post-processing or a classified area from a less hazardous one. Specify the zoning during design, since it affects the ventilation, detection and access arrangements rather than being an accessory added later.

Why do the door dimensions matter?+

Because extraction skids are large and eventually need servicing or replacing. The EXXA Series uses large front doors specifically so equipment can be moved in and out of the booth after installation. If your process equipment will be swapped or upgraded during the booth's life, check the door opening against the largest item you expect to move through it.

What does C1D1 mean?+

Class I, Division 1 is a National Electrical Code hazardous-area classification for locations where ignitable concentrations of flammable gases or vapours are present under normal operating conditions. It sets the requirements for electrical equipment, wiring methods, ventilation and gas detection inside the classified space.

Can the booth be expanded later?+

Yes - the units are modular and can be expanded. That is worth designing for at the outset: leave the adjacent floor area and the services capacity for the extension, because the constraint is usually the building around the booth rather than the booth itself.

What do we need for permitting?+

Classification and occupancy approval sit with your local authority having jurisdiction. Confirm before ordering which engineering drawings, calculations and gas detection certifications are included with the configuration you select, and check them against your AHJ's submittal requirements.

Related products

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →