PSM vs RMP: OSHA and EPA Safety Rules Compared

Compare OSHA PSM (29 CFR 1910.119) and EPA RMP (40 CFR Part 68): differences in worker vs off-site scope, chemical thresholds, tiers, and 2024 rule updates.

Written and maintained by CASRAI Editorial Board

Last updated

How do OSHA PSM (29 CFR 1910.119) and EPA RMP (40 CFR Part 68) compare side by side?

The table below compares OSHA PSM (29 CFR 1910.119) and EPA RMP (40 CFR Part 68) across 10 dimensions, from primary statutory authority & enforcing agency to facility applicability & decision framework.

Side-by-side comparison

DimensionOSHA PSM (29 CFR 1910.119)EPA RMP (40 CFR Part 68)
Primary Statutory Authority & Enforcing AgencyPromulgated by the Occupational Safety and Health Administration (OSHA) within the US Department of Labor under statutory authority of the Occupational Safety and Health Act of 1970 (29 U.S.C. 655) and Section 304 of the Clean Air Act Amendments of 1990. Enforced through federal OSHA regional compliance officers and delegated State OSHA plans (such as Cal/OSHA or MIOSHA). Violations result in OSHA citations, classified as Serious, Willful, or Repeat under 29 CFR 1903, without an environmental reporting nexus.Promulgated by the Environmental Protection Agency (EPA) under Section 112(r) of the Clean Air Act Amendments of 1990 (42 U.S.C. 7412(r)) and the General Duty Clause (Section 112(r)(1)). Enforced by EPA regional offices (Air and Toxics Enforcement divisions) and delegated state environmental agencies. Enforcement mechanisms operate under Clean Air Act Section 113, authorizing civil administrative penalties, federal compliance orders, and statutory judicial fines per day per violation.
Core Regulatory Scope & BoundaryWorker protection within the facility fence line. The standard applies to all commercial workplaces, pilot plants, chemical manufacturing units, and industrial facilities where hazardous processes present potential toxic, fire, or explosion hazards to employees and on-site contractor personnel. PSM does not regulate off-site dispersion, residential toxic endpoints, or environmental damage beyond the property line.Public health and environmental protection outside the facility boundary. The rule targets chemical accident prevention, off-site consequence reduction, and emergency response coordination to prevent toxic plumes, overpressure waves, and radiant thermal flux from injuring neighboring populations, schools, hospitals, residences, public recreational areas, or sensitive environmental ecosystems (such as national parks).
Program Classification & TiersSingle-tier compliance framework. Any covered process must implement all applicable provisions of the 14 standard management elements outlined in 29 CFR 1910.119(c) through (p). There are no graduated tiers, exemption categories for low off-site risk, or reduced administrative tracks for small businesses, aside from specific retail, oil/gas drilling, and heating fuel exemptions codified in 1910.119(a)(1).Three-tiered regulatory architecture (40 CFR 68.10). Program 1 applies to processes with zero off-site accidents in five years whose worst-case release distance does not reach any public or environmental receptor. Program 2 applies to intermediate or non-PSM covered industrial and agricultural facilities with a streamlined 7-element prevention program. Program 3 applies to higher-risk processes subject to OSHA PSM or classified under targeted manufacturing NAICS codes (324, 325, 322), requiring full Subpart D prevention and off-site modeling.
Covered Substances & Threshold VariancesRegulates approximately 137 highly hazardous toxic and reactive chemicals listed in 29 CFR 1910.119 Appendix A with specific Threshold Quantities (TQs), plus flammable gases and liquids with flash points below 100 degrees Fahrenheit (37.8 degrees Celsius) present in quantities of 10,000 pounds or more in one contiguous process. Examples of toxic TQs: anhydrous ammonia at 10,000 lbs, chlorine at 1,500 lbs, hydrogen fluoride at 1,000 lbs, phosgene at 100 lbs, methyl chloride at 15,000 lbs, and formaldehyde at 1,000 lbs.Regulates 77 toxic substances and 63 flammable substances listed in 40 CFR 68.130 Tables 1 through 4. While flammable chemicals share a 10,000 lb threshold (with retail fuel exemptions under 1999 CSISSFRRA), toxic thresholds differ substantially from OSHA PSM: chlorine is 2,500 lbs (vs. 1,500 lbs under PSM), phosgene is 500 lbs (vs. 100 lbs under PSM), methyl chloride is 10,000 lbs (vs. 15,000 lbs under PSM), formaldehyde solution is 15,000 lbs (vs. 1,000 lbs under PSM), and sulfur dioxide is 5,000 lbs (vs. 1,000 lbs under PSM).
Hazard Assessment & Off-Site ModelingRequires a formal Process Hazard Analysis (PHA) under 29 CFR 1910.119(e) using recognized methodologies (What-If, Checklist, HAZOP, FMEA, or Fault Tree) to evaluate on-site hazards, engineering controls, and human factors, revalidated every five years. PSM does not require atmospheric dispersion modeling, worst-case release calculations, or quantification of off-site civilian population exposures.Mandates Off-Site Consequence Analysis (OCA) under 40 CFR Part 68 Subpart B. Facilities must evaluate a Worst-Case Release Scenario (WCS) assuming complete loss of the single largest vessel over 10 minutes under conservative atmospheric conditions (Class F stability, 1.5 m/s wind), plus Alternative Release Scenarios (ARS) representing more likely failure modes. Facilities must calculate radial endpoint distances and count resident populations using US Census data and identify public and environmental receptors.
Prevention Program ElementsMandates 14 interrelated management elements: (1) Employee Participation, (2) Process Safety Information, (3) Process Hazard Analysis, (4) Operating Procedures, (5) Training, (6) Contractors, (7) Pre-startup Safety Review (PSSR), (8) Mechanical Integrity, (9) Hot Work Permits, (10) Management of Change (MOC), (11) Incident Investigation, (12) Emergency Planning and Response, (13) Compliance Audits (at least every three years), and (14) Trade Secrets disclosure.Under Program 3 (Subpart D), RMP mirrors OSHA PSM's 14 elements word-for-word across operating procedures, MOC, mechanical integrity, and PHA. Under Program 2 (Subpart C), EPA requires a streamlined 7-element prevention program (safety information, hazard review, operating procedures, training, maintenance, compliance audits, and incident investigation). Program 1 facilities have no formal prevention program element mandate.
Plan Submission & Federal RegistrationNo federal registration, plan filing, or initial documentation submission is required. Facilities compile and maintain their process safety information, operating procedures, and audit records on-site. OSHA inspectors review program documentation during programmed National Emphasis Program (NEP) chemical inspections, unannounced compliance audits, worker complaint investigations, or post-incident enforcement proceedings.Mandatory electronic registration and filing. Facilities must submit a formal Risk Management Plan (RMP) through EPA's Central Data Exchange (CDX) via RMP*eSubmit prior to exceeding threshold quantities. The RMP includes an executive summary, 5-year accident history, OCA modeling data, prevention program certifications, and emergency response protocols. RMPs must be updated and resubmitted at least every five years, or within six months of acquiring newly covered substances or completing major process modifications.
Emergency Response & Local CoordinationEmergency planning governed by 29 CFR 1910.119(n) and 29 CFR 1910.38 (Emergency Action Plans) or 29 CFR 1910.120 (HAZWOPER). Focuses on internal workplace evacuation, alarm systems, employee headcounts, and in-plant hazardous materials response teams. While facilities may coordinate with local fire departments, PSM does not establish direct community warning or public agency integration mandates.Comprehensive public emergency integration under 40 CFR Part 68 Subpart E. Facilities must coordinate annually with Local Emergency Planning Committees (LEPCs) or local fire authorities, conduct annual notification exercises, and perform field emergency deployment exercises every decade (and tabletop exercises every three years). Responding facilities must maintain written emergency medical, decontamination, and containment plans harmonized with community disaster response frameworks.
2024 SCCAP Final Rule & Modernization UpdatesOSHA PSM has remained largely structurally unaltered since its initial promulgation in 1992. While OSHA initiated Small Business Regulatory Enforcement Fairness Act (SBREFA) panel proceedings and published stakeholder requests for information regarding potential modernization (such as expanding Appendix A, regulating reactive chemical hazards, and addressing atmospheric storage tanks), no revised final rule has been issued.EPA finalized the 'Safer Communities by Chemical Accident Prevention' (SCCAP) rule on March 11, 2024 (89 FR 17622, effective May 10, 2024). SCCAP mandates Safer Technologies and Alternatives Analysis (STAA) incorporating inherently safer technology (IST) reviews for petroleum refining (NAICS 324) and chemical manufacturing (NAICS 325), root cause analysis for qualifying incidents, independent third-party compliance audits following reportable releases, expanded employee participation including stop-work authority, and enhanced community chemical hazard data disclosure.
Facility Applicability & Decision FrameworkApplies to on-site operations when any single process contains a listed toxic or reactive substance exceeding 29 CFR 1910.119 Appendix A thresholds or a flammable liquid/gas exceeding 10,000 lbs (unless used exclusively as workplace fuel or stored in retail facilities). Choose PSM compliance focus when establishing internal workplace safety procedures, operator qualifications, mechanical integrity inspection schedules, and management of change protocols to safeguard operators, maintenance technicians, and contractors.Applies to stationary sources when a process contains a regulated substance exceeding 40 CFR 68.130 thresholds. Choose RMP compliance procedures when establishing community protection zones, executing off-site consequence dispersion modeling, registering facility plans through EPA's Central Data Exchange, executing annual LEPC emergency drills, and implementing Clean Air Act Section 112(r) accident prevention programs. Facilities crossing both sets of thresholds must maintain an integrated compliance program satisfying PSM internally and RMP externally.

Ask CASRAI · full access

Ask about PSM vs RMP: OSHA and EPA Safety Rules Compared

Full access: large monthly usage, up to 10 source passages behind each answer, and MCP and API access for Claude Code, Codex and other CLIs. Cancel any time.

An AI assistant for research: funder rules, compliance, methods and publishing. It links the sources behind its answers and labels answers that come from a web search.

Answers draw on CASRAI's guides and dictionary plus the federal and funder documents we index: Federal Register, Grants.gov, Regulations.gov and UKRI.

Works on this site and inside Claude, Cursor and the AI tools you already use.

Everything CASRAI publishes — this page, the dictionary, the guides and the news — stays open to read, with no account and no card.

Common questions

Common questions about OSHA PSM (29 CFR 1910.119) vs EPA RMP (40 CFR Part 68)

What do PSM and RMP stand for?

+

PSM stands for Process Safety Management, referring specifically to OSHA's standard 'Process Safety Management of Highly Hazardous Chemicals' codified at 29 CFR 1910.119. RMP stands for Risk Management Program (and its accompanying document, the Risk Management Plan), established by the EPA under Section 112(r) of the Clean Air Act Amendments of 1990 and codified at 40 CFR Part 68. While PSM regulates operational safety practices inside the facility boundary to protect on-site workers, RMP governs off-site consequence analysis, accident prevention, and emergency coordination to protect external communities and environmental ecosystems.

What does PSM stand for?

+

PSM stands for Process Safety Management. In industrial and chemical process engineering, it designates the comprehensive management framework mandated by OSHA standard 29 CFR 1910.119 (and 29 CFR 1926.64 for construction). PSM requires chemical facilities, refineries, and manufacturing plants handling threshold quantities of toxic, reactive, or flammable chemicals to implement 14 technical management elements—such as Process Hazard Analysis (PHA), Operating Procedures, Mechanical Integrity, and Management of Change (MOC)—to prevent catastrophic chemical releases, explosions, and fires in the workplace.

What is the difference between OSHA and HSE?

+

OSHA (Occupational Safety and Health Administration) is a federal agency within the United States Department of Labor, established under the Occupational Safety and Health Act of 1970 to protect worker health and safety inside US workplaces. In the United States, major chemical hazards are divided between OSHA (which regulates workplace safety via PSM) and the EPA (which regulates community and environmental safety via RMP). By contrast, HSE (Health and Safety Executive) is the national statutory regulator for work-related health, safety, and illness in Great Britain (UK), established under the Health and Safety at Work etc. Act 1974. Under the UK Control of Major Accident Hazards (COMAH) Regulations 2015, the HSE acts jointly with UK environmental agencies (the Environment Agency in England, Natural Resources Wales, and SEPA in Scotland) as a single, unified Competent Authority. This Competent Authority oversees both on-site employee protection and off-site environmental risk under one integrated regime, rather than maintaining the dual-agency jurisdictional divide found between OSHA and the EPA in the United States.

What is rmp certification?

+

In environmental and chemical process safety regulation, there is no personal credential or facility award called an 'rmp certification'. Under EPA 40 CFR Part 68, regulated facilities do not receive a certificate; instead, the owner or operator must electronically submit a certified Risk Management Plan (RMP) via the EPA Central Data Exchange (CDX) using the RMP*eSubmit application. The facility owner certifies under 40 CFR 68.185 that the information is accurate and complete. However, outside of environmental regulations, 'RMP' is widely recognized as the Project Management Institute's Risk Management Professional (PMI-RMP) credential, which is a professional certification validating expertise in assessing and mitigating project risks. Searchers asking about 'rmp certification' are often either looking for the PMI project risk certification or seeking instructions on how an industrial facility certifies and submits its mandatory 5-year RMP plan to the EPA.

Data: OSHA PSM vs EPA RMP Chemical Thresholds and Program Comparison

Comparative regulatory dataset compiled from OSHA 29 CFR 1910.119 Appendix A and EPA 40 CFR 68.130 Tables 1 through 4, documenting threshold quantities, Chemical Abstracts Service (CAS) registry numbers, statutory hazard categories, and program tier rules for major toxic and flammable substances subject to federal process safety mandates.

Period covered: 2024/2026. Coverage: United States.

OSHA PSM vs EPA RMP Chemical Thresholds and Program Comparison
Chemical NameCAS NumberHazard CategoryOSHA PSM Threshold (lbs)EPA RMP Threshold (lbs)EPA Regulatory BasisEPA Program Applicability
Ammonia (anhydrous)7664-41-7Toxic Gas1000010000Inhalation toxicityProgram 3 / Program 2
Chlorine7782-50-5Toxic Gas15002500Inhalation toxicityProgram 3 / Program 2
Hydrofluoric acid (conc >= 50%)7664-39-3Toxic Liquid10001000Inhalation and tissue toxicityProgram 3
Methyl chloride74-87-3Toxic / Flammable Gas1500010000Inhalation toxicityProgram 3 / Program 2
Phosgene75-44-5Toxic Gas100500Acute pulmonary edema toxicityProgram 3
Formaldehyde (solution)50-00-0Toxic Liquid / Gas100015000Acute vapor inhalation toxicityProgram 3 / Program 2
Hydrogen cyanide (anhydrous)74-90-8Toxic Liquid / Gas10002500Cellular respiration toxicityProgram 3
Sulfur dioxide (anhydrous)7446-09-5Toxic Gas10005000Inhalation toxicityProgram 3 / Program 2
Propane74-98-6Flammable Gas1000010000Vapor cloud explosion / flammabilityProgram 3 / Program 1

Sources

Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →