Better Plants is a voluntary partnership run by the US Department of Energy (DOE) in which industrial organizations, mainly manufacturers and also water and wastewater utilities, commit to improving energy efficiency, usually by 25% over ten years, and receive technical support and recognition from DOE in return. This guide explains what partners pledge, what DOE provides, how the Challenge and the water and waste networks fit in, and how researchers and facility energy managers can read the programme’s published figures.
Short answer
Better Plants is not a plant-biology or horticulture topic: the name refers to industrial plants, meaning factories and treatment works. According to DOE’s Better Plants page (last updated 25 November 2025), manufacturers pledge to cut energy intensity by 25% over ten years across their US operations and report progress to DOE, which provides technical support, recognition and resources. The page describes the programme as active, with more than 315 partners.
Definition and scope
DOE’s overview document describes Better Plants as a voluntary partnership initiative intended to drive significant energy efficiency improvement across energy-intensive industrial companies, and says it includes over 300 manufacturers and public water and wastewater utilities. The DOE web page lists partner types as manufacturers, municipal organizations, retailers and water utilities, from small family-owned businesses to Fortune 100 companies. The Better Buildings Solution Center, which hosts the programme’s resource pages, describes the Better Plants Challenge as a voluntary partnership that aims to drive significant energy savings for industrial organizations and notes that the industrial sector accounts for roughly one-third of the nation’s energy consumption.
It is a pledge-and-support model, not a regulation: none of the DOE pages read here describes a legal penalty for a partner that misses its goal. Joining starts with a signed commitment form. The programme belongs to the Better Buildings and Better Plants initiative, which is the reason search results for the phrase are dominated by DOE’s Better Buildings Solution Center.
What energy intensity means here
Energy intensity is, in general usage, energy used per unit of output or activity, so a plant can lower it either by using less energy for the same production or by producing more with the same energy. Oak Ridge National Laboratory (ORNL), which supports the programme, describes energy intensity as the energy used to produce a product or service, so that it reflects overall efficiency. DOE’s Better Plants page states the 25% target in terms of energy intensity without defining the term, so anyone reading a partner’s reported progress should check which denominator a report uses. That last point is an editorial reading aid, not a DOE rule.
How the programme works in practice
The pledge and reporting
Per DOE’s page, a manufacturing partner pledges to reduce energy intensity by 25% over ten years across its US manufacturing operations and reports progress to DOE. The Solution Center’s join page adds that partners typically commit to this reduction across their entire US portfolio, and that they commit to demonstrating progress by sharing solutions and reporting energy performance data. The ten-year horizon means the goal is cumulative, not 25% each year.
Joining
The join page says an organization joins by completing and signing a two-page partnership agreement form and submitting it to the programme mailbox listed on that page; the form should be signed by the CEO or a senior executive. The overview document likewise says the route is a voluntary commitment form.
The Technical Account Manager
Each partner is assigned a national-laboratory-based Technical Account Manager (TAM). DOE’s page lists tailored help such as in-plant trainings, webinars, one-on-one consultations and identification of technology pathways. The join page says the TAM meets with the partner monthly. The overview document adds that the TAM helps with baselines, energy management plans, savings and recovery opportunities, tracking metrics, and a guide to DOE tools.
Trainings and other resources
The overview document describes In-Plant Trainings as 2- to 4-day events led by experts, covering topics such as energy management systems, plant assessments, pump and aeration systems and DOE software tools. The join page lists access to all Better Plants trainings: In-Plant Trainings, Virtual Trainings, Energy Treasure Hunts and Bootcamps. The About page lists energy management tools, guidance documents, no-cost energy management software, and free energy audits and onsite energy screenings from complementary programmes, plus peer exchange through the annual Better Buildings and Better Plants Summit, webinars and working groups.
Recognition and publishing
Partners receive recognition for goal achievements and become eligible to apply for Better Project and Better Practice Awards and to host a DOE site visit. They also get support in publishing two case studies, and the About page says the Challenge requires partners to showcase their success by publishing solutions. This public-solutions element is a useful primary-source trail for researchers, because it means partner practices are documented outside internal reports.
Types and related concepts: Program, Challenge, water and waste networks
DOE’s page separates two commitment tiers. In the Better Plants Program, partners make the 25%-over-ten-years pledge and report progress to DOE. In the Better Plants Challenge, partners make the same pledge but also share progress publicly, which the page says is meant to spread best practices. The About page describes the Challenge commitment as three parts: pledge an organization-wide energy savings goal, develop an organization-wide plan, and publish solutions. The distinction DOE draws is public disclosure, not a different numerical target.
The Industrial Efficiency page describes two further initiatives alongside the energy goal. Through the Water Savings Network, partners set goals to save water and receive recognition and tailored technical support; the page notes that transporting and treating water in an industrial facility requires energy. The Waste Reduction Network helps partners reduce waste, improve energy performance and reduce operating costs, and the page says it lets DOE understand real-world problems and solutions. The overview document also mentions supply chain and water initiatives and Technology Days at National Laboratories.
The data table below sets out each element of the programme, which party acts, and what DOE says about it, so the pledge side and the support side can be read together.
Where it matters for research and facility practice
For researchers studying industrial decarbonisation, Better Plants is a named, long-running voluntary programme and so a case of a government using goals, technical assistance and recognition instead of mandates. Its published totals give a sense of scale: DOE’s page reports more than 315 partners, cost savings of over $15.2 billion, facilities in every US state and territory, and about 14% of the US manufacturing footprint. The Solution Center About page reports over $14.1 billion and 2.8 QBtu in savings to date, and more than 100 partners that have achieved their Challenge goals. These are programme-reported figures, and the pages read here do not state the baseline year or accounting method behind them.
ORNL’s 29 April 2024 news article, citing the 2023 Better Buildings progress report, gives a 2024 snapshot: more than 280 partners, energy data reported for 3,600 industrial plants since 2011, cumulative cost savings of $11.8 billion, 2.4 quadrillion British thermal units of energy savings, 147 million metric tons of carbon dioxide avoided, and an average annual energy intensity improvement of 1.8%. It also says partners use ORNL-developed tools such as MEASUR, the Energy Footprint Tool and VERIFI to track energy use and carbon footprints, and that four-day Energy Bootcamps began in 2022.
| Source and date | Partners | Cumulative cost savings |
|---|---|---|
| ORNL news article, 29 April 2024 (2023 progress report) | More than 280 | $11.8 billion |
| Solution Center About page (Challenge; undated figures) | Over 300 industrial organizations | Over $14.1 billion |
| DOE Better Plants page, updated 25 November 2025 | More than 315 | Over $15.2 billion |
Read together, the totals grow from one publication to the next, which is why each figure should be cited with its source and date. A further comparison is possible: ORNL reports an average annual energy intensity improvement of 1.8%, while the worked example below shows that a 25% reduction spread evenly over ten years would need roughly 2.8% a year; the sources do not say how the 1.8% average is calculated, so the two numbers should not be compared as like for like.
The two sets of totals differ because DOE pages were written at different times and, in part, for different scopes (the whole programme versus the Challenge). A reader comparing figures across infographics, press items and the 2025 overview document should record the publication date and scope of each rather than mix them.
For laboratory and university energy managers, the programme’s partner types are industrial rather than academic, so a campus lab cannot assume eligibility from these pages. The transferable value is methodological: the TAM workflow of setting a baseline, building an energy management plan, tracking metrics and using free analysis tools is a useful template for any facility energy review. Standards that frame building energy performance sit alongside this, for example ASHRAE Standard 90.1 and the International Energy Conservation Code, which address buildings, whereas Better Plants addresses industrial operations. Resource and materials-flow framing for the same industries is covered in the guide to industrial ecology.
Worked example: what a 25% intensity goal implies (illustrative composite)
This example is an illustrative composite with invented numbers, not a real partner. Suppose a plant’s baseline energy intensity is 100 energy units per tonne of product. A 25% reduction over ten years means reaching 75 units per tonne by year ten. If the reduction were spread as an equal compound rate, each year would need intensity to fall by about 2.8% (because 0.75 raised to the power 1/10 is about 0.972). If the same plant doubles its output over those years, total energy use could still rise even though intensity fell, which is why a goal expressed as intensity and a goal expressed as absolute energy use are different claims. The DOE pages describe the pledge as an intensity goal.
Questions to ask when evaluating a pledge programme
- What is the baseline year, and is it fixed when the partner joins?
- What is the denominator for energy intensity, and is it the same across partners?
- Is progress reported only to the programme or published (Program versus Challenge)?
- Are savings totals dated, and what scope do they cover?
- Do published case studies and goal-achiever lists corroborate the aggregate totals?
These are analytical questions drawn from how the programme is structured, not DOE criteria.
Common misunderstandings
It is not about botany
The search phrase also brings up game modifications and gardening pages, but the DOE programme concerns industrial facilities. Nothing in it relates to growing or breeding plants.
It is not a regulation or a grant
The sources describe a voluntary commitment with technical support and recognition. They do not describe a funding award or a mandate.
The 25% goal is not an annual cut
The pledge is typically 25% over ten years, a cumulative goal over a decade.
Challenge is not a different target
Challenge partners make the same 25% pledge as other manufacturing partners; DOE distinguishes them by public sharing of progress and solutions.
Only manufacturers take part
DOE’s page and overview document both include water utilities and municipal organizations, and the join page names wastewater treatment organizations alongside manufacturers.
Sources
- US Department of Energy: Better Plants, checked 2026-11-21 (page last updated 2025-11-25)
- US Department of Energy: Better Plants Program Overview (2025), checked 2026-11-21
- Better Buildings Solution Center: About the Better Plants Challenge, checked 2026-11-21
- Better Buildings Solution Center: Join the Better Plants Challenge, checked 2026-11-21
- Better Buildings Solution Center: Industrial Efficiency, checked 2026-11-21
- Oak Ridge National Laboratory: Better Plants program leads to carbon reduction, cost savings for US manufacturing (29 April 2024), checked 2026-11-21
Data: Better Plants programme elements: who acts and what DOE describes
Compiled by the CASRAI editorial team from US Department of Energy, Better Buildings Solution Center and Oak Ridge National Laboratory pages (S1-S6 in the order listed) describing the Better Plants programme and Challenge, read 2026-11-21. Each row states one programme element, the party that acts, and the detail the DOE pages give. The source column lists which listed sources state it.
Period covered: 2025. Coverage: United States.
| Programme element | Acting party | What DOE describes | Source keys (S1-S5) |
|---|---|---|---|
| Energy intensity pledge | Partner | Typically 25% reduction over 10 years across US operations; progress reported to DOE | S1, S2, S4 |
| Public sharing (Challenge tier) | Partner | Same pledge, plus progress shared publicly; organization-wide plan; published solutions | S1, S3 |
| Joining | Partner | Signed two-page partnership agreement, signed by CEO or senior executive | S4 |
| Technical Account Manager | DOE (national lab) | Assigned to each partner; meets monthly; helps with baselines, energy management plans and tracking | S1, S2, S4 |
| In-Plant Trainings | DOE | 2- to 4-day expert-led events on energy management systems, plant assessments, pumps and aeration | S2 |
| Other trainings | DOE | Virtual Trainings, Energy Treasure Hunts and Bootcamps | S4 |
| Recognition and case studies | DOE | Goal-achievement recognition, award eligibility, support to publish two case studies | S3, S4 |
| Water Savings Network | Partner and DOE | Partners set water goals and receive recognition and tailored technical support | S5 |
| Energy Bootcamps | DOE and ORNL | Four-day sessions launched in 2022; about 120 held by April 2024 | S6 |
| Waste Reduction Network | Partner and DOE | Helps partners reduce waste, improve energy performance and cut operating costs | S5 |
Sources
- US DOE: Better Plants (accessed 2026-11-21)
- US DOE: Better Plants Program Overview (2025) (accessed 2026-11-21)
- Better Buildings Solution Center: About the Better Plants Challenge (accessed 2026-11-21)
- Better Buildings Solution Center: Join the Better Plants Challenge (accessed 2026-11-21)
- Better Buildings Solution Center: Industrial Efficiency (accessed 2026-11-21)
- Oak Ridge National Laboratory: Better Plants program leads to carbon reduction, cost savings for US manufacturing (accessed 2026-11-21)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.