Skip to main content
v2026.11,986 entries · CC-BY 4.0

Dual Active Bridge Converter: Phase Shift, ZVS and Losses

How a dual active bridge converter sets power by phase shift, why light load breaks zero-voltage switching, and what to report in DAB research.

Written and maintained by CASRAI Editorial Board

Published

On this page

A dual active bridge (DAB) converter is an isolated, bidirectional DC-DC power converter: two actively switched full bridges sit on either side of a high-frequency transformer, and the amount and direction of power are set by the phase shift between the two bridges’ switching waveforms. The transformer’s leakage inductance, often with an added external inductor, carries the energy from one bridge to the other.

Definition and scope

The term “dual active bridge” describes the topology by its parts. “Dual” means two bridges, one on each side of the transformer. “Active” means both bridges are built from controlled switches, in contrast to a converter with a diode rectifier on one side that can pass power in one direction only. The Plexim PLECS demonstration of the converter lists the elements as two full bridges, a high-frequency transformer, an energy transfer inductor and DC-link capacitors (Plexim, Dual Active Bridge Converter). A conference paper from the University of Padova calls the DAB one of the best known ways of implementing isolated bidirectional converters, and names dc nano- and microgrids with renewables and storage, and electric and hybrid vehicle powertrains, as typical applications (Pistollato et al., AEIT 2019).

A 2024 Elsevier book chapter by Wang, Qin, Yuan and Blaabjerg describes the DAB as a type of isolated bidirectional DC-DC converter used in DC microgrids, electric vehicles and energy storage (TU Delft repository record, “Dual active bridge converter and its control”). That is the scope of this page: the converter itself, how its power is controlled, why it can lose its soft-switching advantage, and what a researcher should report so a result can be reproduced. It does not cover the many topology variants (for example, the high-voltage-gain versions that appear in the research literature), each of which changes the circuit and needs its own analysis.

How a dual active bridge converter works

The two bridges and the transformer

In the Padova paper, the primary bridge is the low-voltage side and the secondary bridge is the high-voltage side, joined by a high-frequency transformer. The transformer does two jobs at once. It provides galvanic isolation between the two DC ports, and its turns ratio allows high step-up or step-down voltage ratios (Pistollato et al.). Each bridge turns its DC link voltage into a switched voltage waveform at the transformer winding: the paper calls these waveforms vA and vB and describes them as three-level in the general case. The shapes of vA and vB, and their timing relative to each other, define how much power flows and in which direction.

The energy transfer inductance

The two bridges are voltage sources as far as the transformer is concerned, so something has to limit and shape the current between them. In a DAB that something is an inductance. The PLECS demonstration states that the energy transfer inductance is the transformer leakage inductance plus any external inductance placed in series (Plexim). The Padova paper makes the same point: the leakage inductance, with an optional external inductor, is the energy transfer element (Pistollato et al.). In practice this means the transformer’s winding geometry is not a side issue. It directly sets one of the converter’s main parameters.

Power is set by phase shift

In the classical scheme each switch conducts for 50% of the switching period, so both bridges produce fixed-frequency square waves. Power flow is then directed by phase-shifting the pulses of one bridge relative to the other. The Plexim page puts it simply: the leading bridge delivers power to the lagging bridge (Plexim). Reversing which bridge leads reverses the power flow, which is how a single converter handles both charging and discharging an energy store. In the PLECS demonstration, the output voltage error feeds a digital PI regulator whose output is the phase shift ratio supplied to the PWM modulator.

Wang and colleagues derive the active and reactive power flows under single-phase-shift modulation and use them to examine the trade-off between the range over which zero-voltage switching is achieved, the current stress and the power rating, which in turn guides the choice of inductor. They then build large-signal and small-signal reduced-order models, refine the small-signal model to include power losses, and design two closed-loop strategies: output voltage feedback, and output voltage feedback with output current feedforward, verified in PLECS simulation (TU Delft record). For a researcher setting up a simulation, the practical conclusion is that the inductor value is a design decision that couples power rating, soft-switching range and current stress, not a free parameter. For a software walk-through of power-electronics simulation, see the guide to PLECS; for circuit-level simulation of other kinds, see ngspice.

Modulation schemes: beyond a single phase shift

The classical phase-shift modulation (PSM), also called single phase shift, uses one control variable: the relative phase shift between vA and vB. The Padova paper lists three extensions, extended, dual and triple phase shift (EPS, DPS and TPS), which also control the pulse duration of vA, of vB or of both. The reason to add them is extra degrees of freedom that can be used to improve efficiency. The paper’s triple-phase-shift maps improve efficiency compared with plain PSM, especially at light load, in a 1.5 kW prototype switching at 60 kHz (Pistollato et al.). The TU Delft chapter likewise introduces four modulation schemes (TU Delft record).

Scheme What is controlled Why it is used Source
Phase-shift modulation (PSM) Relative phase shift between vA and vB; both are 50% duty square waves at fixed frequency Classical, simplest way to set power flow and direction Pistollato et al., AEIT 2019
Extended, dual and triple phase shift (EPS, DPS, TPS) Pulse duration of vA, vB or both, in addition to the phase shift Extra degrees of freedom to improve efficiency Pistollato et al., AEIT 2019

The comparison above is deliberately short. Which scheme is better for a given converter depends on the voltage ratio, the load range, the devices and the loss model, and the sources read for this page do not support a general ranking.

Zero-voltage switching and why light load breaks it

The ideal condition

Zero-voltage switching (ZVS) means a switch turns on while the voltage across it is already close to zero, which removes the turn-on loss that would otherwise dissipate the energy stored in the device’s output capacitance. A paper from Aalborg University describes the DAB’s advantage as the inherent capability of naturally achieving ZVS for all switches without any auxiliary circuits (Liu, Davari and Blaabjerg, APEC 2020). The PLECS demonstration gives the ideal condition: ZVS can be realized when the voltage transfer ratio M across the transformer equals 1, where M = Vout / (n Vin) and n is the turns ratio. In a non-ideal circuit, ZVS depends on the resonance between the devices’ output capacitance and the equivalent inductance during the switching intervals (Plexim).

What goes wrong at light load

The Padova paper names two main issues of the classical scheme. The first is circulating current: it rises when the input-output voltage ratio differs from the turns ratio, which raises the rms current and with it the conduction loss. The second is loss of ZVS turn-on under some conditions, especially at light load (Pistollato et al.).

The Aalborg paper explains the light-load mechanism. At light load the current in the leakage inductance is lower, and during the dead time it may not be large enough to fully discharge the transistor output capacitor, so ZVS fails. The authors also report that the two common ways of checking for ZVS, current-based and energy-based criteria, are not precise enough, because they ignore the dead-time transient and the nonlinear output capacitance of the device. Their analysis treats the dead-time transient with the nonlinear capacitance included, and their experiments (60 kHz switching, a 215 pF primary-side device output capacitance) map operating points into safe, marginal and failure regions as a function of phase shift (Liu et al.).

Put together, three things decide whether a given bridge leg achieves soft switching at a given operating point: how close the voltage transfer ratio is to 1, how much current the inductance carries at the switching instant, and the dead time and device capacitance that determine how much charge must be moved. A simulation that uses a fixed, linear capacitance can therefore over-state the ZVS range, which is why the nonlinear capacitance matters in the Aalborg analysis.

Losses: where the energy goes

The Padova paper uses a simplified loss model to choose modulation parameters. Its conduction loss is written in terms of the switch on-resistances on the low-voltage side (Ron,LV) and high-voltage side (Ron,HV), the winding resistances (Rpri, Rsec), the transformer-referred rms inductor current and the turns ratio n, as Pcond = 2 Ron,LV (n IL,rms)² + 2 Ron,HV IL,rms² + Rpri (n IL,rms)² + Rsec IL,rms². Every term scales with the square of the rms inductor current, which is why circulating current is costly: lowering the rms current lowers all four terms at once. Switching losses, in the same paper, depend on the switch drain-source capacitance, the dead times, the inductor value, the energy stored at the switching instants and the switching frequency (Pistollato et al.).

This split is useful when reading any DAB efficiency claim. Conduction loss responds to current and resistance, so it is driven by the voltage ratio mismatch and the load. Switching loss responds to whether ZVS is achieved, so it is driven by the load, the dead time and the device capacitance. A result that reports only a peak efficiency at one operating point cannot tell the reader which of the two terms dominates elsewhere. The data table below sets out these mechanisms side by side with the parameters involved.

Where the DAB matters for research and laboratory work

The sources agree on the settings where the topology is used. The Padova paper lists dc nano- and microgrids with renewables and storage, and electric and hybrid vehicle powertrains; the Aalborg paper lists distributed power and energy storage systems; the TU Delft chapter lists DC microgrids, electric vehicles and energy storage. In each case the reason is the same set of properties: galvanic isolation, bidirectional flow and a wide voltage ratio from one transformer-coupled stage.

For a lab, the DAB is also a common subject of simulation and bench prototypes. The PLECS demonstration shows both ends: it uses silicon carbide MOSFETs (Wolfspeed C3M0030090K and C3M0065090D) with a thermal model, and either an ideal transformer, for faster simulation, or a detailed planar transformer model (Payton T250-4-16, E43/28 core) that includes saturation (Plexim). The two options illustrate a real choice in model fidelity: the ideal transformer simulates faster, and the detailed one captures effects the ideal model cannot. Wide-bandgap devices and planar magnetics also tie the converter to the supply chain; see the guide on the semiconductor supply chain for the sourcing side.

What to report so a DAB result can be reproduced

The sources above show which quantities a DAB result depends on. The checklist below is an editorial synthesis of those dependencies, not a requirement from any one of the cited papers.

  • Turns ratio and voltage ratio. The voltage transfer ratio M = Vout / (n Vin) governs ZVS and circulating current, so report n, the voltage range and which side is low voltage.
  • Inductance, split by origin. State the total energy transfer inductance and how much is transformer leakage and how much is external.
  • Switching frequency and dead time. Both enter the switching-loss and ZVS analysis.
  • Device output capacitance. Say whether it is treated as constant or nonlinear; the Aalborg analysis shows the difference matters at light load.
  • Load range. Efficiency and ZVS behave differently at light and heavy load, so report the whole range tested, not one point.
  • Modulation scheme and its parameters. Name the scheme (PSM, EPS, DPS or TPS) and give the control variables used at each operating point.
  • Model fidelity. For simulations, record whether the transformer and devices are ideal or detailed, and the simulator and version.

Sharing the simulation model and its parameters alongside the paper follows the same logic as other computational work; see reproducibility and the guide to reproducibility infrastructure.

Common misunderstandings

“Phase shift is the same as duty cycle”

In the classical DAB both bridges run at 50% duty. The phase shift between them, not a duty cycle, controls the power. Duty-like control (pulse duration) only enters in the EPS, DPS and TPS extensions (Pistollato et al.).

“A DAB always achieves soft switching”

The topology naturally supports ZVS without auxiliary circuits, but the sources show conditions where it is lost: a voltage ratio away from M = 1 and light load, where the inductor current is too small to discharge the device capacitance within the dead time (Plexim; Liu et al.).

“Leakage inductance is only a parasitic”

In a DAB the leakage inductance is part of the energy transfer path, so transformer design and inductor selection are connected (Plexim; TU Delft record).

“Bidirectional means two separate converters”

A single DAB moves power in either direction. Which bridge leads in phase determines the direction, so no separate converter or switch-over is needed for reverse flow (Plexim).

Sources

Data: Dual active bridge converter: loss and soft-switching mechanisms, drivers and sources

A compilation of the mechanisms that affect efficiency and zero-voltage switching in a dual active bridge converter, with the cause stated by each source, the quantities involved, and which loss they affect. Compiled from a PLECS demonstration page, two conference papers and a book-chapter abstract, all read on 2026-11-19.

Period covered: 2019/2024.

Dual active bridge converter: loss and soft-switching mechanisms, drivers and sources
MechanismStated cause or conditionQuantities involvedLoss or effectSource
Ideal ZVS conditionVoltage transfer ratio M across the transformer equals 1M = Vout / (n Vin); turns ratio nTurn-on without switching loss (ZVS)Plexim PLECS demonstration
Non-ideal ZVSResonance of device output capacitance with equivalent inductance during switching intervalsOutput capacitance; equivalent inductanceZVS depends on the circuit, not only on MPlexim PLECS demonstration
Circulating currentInput-output voltage ratio differs from the turns ratioVoltage ratio; turns ratio; rms inductor currentHigher rms current and conduction lossPistollato et al., AEIT 2019
Loss of ZVS turn-onSome operating conditions, especially light loadLoad; phase shift; device capacitance; dead timeSwitching loss returnsPistollato et al., AEIT 2019
Light-load ZVS failureLower leakage-inductance current may not fully discharge the transistor output capacitor within the dead timeInductor current; dead time; nonlinear output capacitanceZVS failure; current-based and energy-based criteria not precise enoughLiu, Davari and Blaabjerg, APEC 2020
Conduction lossCurrent through switch on-resistances and winding resistancesRon,LV; Ron,HV; Rpri; Rsec; rms inductor current; nConduction loss grows with the square of rms currentPistollato et al., AEIT 2019
Switching lossEnergy stored at the switching instantsDrain-source capacitance; dead times; inductor L; switching frequencySwitching lossPistollato et al., AEIT 2019
Inductor selection trade-offSingle-phase-shift power flow analysisZVS range; current stress; power ratingGuides choice of the inductorWang, Qin, Yuan, Blaabjerg (Elsevier, 2024)

Follow CASRAI

Research-administration guidance, standards updates and independent tool reviews.

Ask CASRAI · full access

Ask about Dual Active Bridge Converter: Phase Shift, ZVS and Losses

Full access: large monthly usage, up to 10 source passages behind each answer, and MCP and API access for Claude Code, Codex and other CLIs. Cancel any time.

An AI assistant for research: funder rules, compliance, methods and publishing. It links the sources behind its answers and labels answers that come from a web search.

Answers draw on CASRAI's guides and dictionary plus the federal and funder documents we index: Federal Register, Grants.gov, Regulations.gov and UKRI.

Works on this site and inside Claude, Cursor and the AI tools you already use.

Everything CASRAI publishes — this page, the dictionary, the guides and the news — stays open to read, with no account and no card.

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →