
On November 23, 2026, the Federal Communications Commission issued a public notice inviting comment on whether RSI PCIA LLC, operating as Relocation Strategies, qualifies as the Upper C-band satellite relocation coordinator. The decision governs the clearing of 160 megahertz of mid-band spectrum across the contiguous United States, directly affecting university 5G and 6G experimental testbeds, academic satellite downlinks, and research radio observatories.
FCC Solicits Public Input on Upper C-Band Relocation Coordinator Selection
The Federal Communications Commission (FCC) Wireless Telecommunications Bureau released a public notice in GN Docket No. 25-59 (DA 26-1248; FR ID 378982) inviting public comment on whether RSI PCIA LLC, doing business as Relocation Strategies, satisfies the regulatory criteria to serve as the Upper C-band Relocation Coordinator. The notice, documented under Federal Register Document 2026-23905 scheduled for publication on November 24, 2026, initiates an expedited public evaluation following the coordinator’s selection by satellite operators on November 2, 2026.
Under the Commission’s regulatory framework established in its July 24, 2026 Upper C-band Report and Order (FCC 26-46, GN Docket Nos. 25-59 and 18-122), all five eligible Fixed Satellite Service (FSS) space station operators in the 3.98–4.2 GHz band were mandated to select a unified coordinator by January 1, 2027. The five participating satellite operators—Eutelsat S.A., Hispasat S.A., Intelsat License LLC, SES Americom, Inc., and Star One S.A.—reached a unanimous consensus ahead of the statutory deadline, proposing Relocation Strategies to manage the clearing of 160 megahertz of mid-band spectrum between 4.0 GHz and 4.16 GHz across the contiguous United States. Detailed docket filings and transition frameworks are tracked through the FCC 3.7 GHz band transition portal.
Band Reallocation Architecture, Operational Tasks, and Timelines
The Upper C-band restructuring reallocates 160 megahertz of mid-band spectrum (4.0–4.16 GHz) from legacy satellite downlinks to flexible terrestrial wireless services, including advanced 5G networks and emerging 6G wireless architectures. Incumbent FSS space station operations are being consolidated into the upper 40 megahertz of the band (4.16–4.2 GHz), while a 20 megahertz guard band (3.98–4.0 GHz) protects adjacent lower C-band flexible-use licensees operating under 47 CFR Part 27 miscellaneous wireless communications rules.
The proposed Relocation Coordinator bears responsibility for end-to-end transition logistics. Core duties mandated by FCC 26-46 include establishing and managing the clearing timeline, conducting technical engineering analyses for incumbent earth station repointing and filtering, assigning clearing obligations across satellite operators, and mediating technical coordination issues with new terrestrial flexible-use licensees.
| Band Segment / Regulatory Milestone | Frequency Range / Parameter | Operational Designation | Regulatory Target / Effective Date |
|---|---|---|---|
| Lower Guard Band | 3.98–4.00 GHz (20 MHz) | Spectral Guard Band | Protects 3.7–3.98 GHz Terrestrial Operations |
| Cleared Flexible-Use Spectrum | 4.00–4.16 GHz (160 MHz) | Terrestrial 5G / 6G Flexible Use | Auction & Terrestrial Deployment Window |
| Consolidated Satellite FSS Band | 4.16–4.20 GHz (40 MHz) | Incumbent Fixed Satellite Operations | Retuned Earth Station Reception |
| Operator Selection Milestone | RSI PCIA LLC Selected | Joint Satellite Consortium Consensus | November 2, 2026 |
| FCC Public Notice Release | DA 26-1248 (GN Docket 25-59) | Bureau Solicitation of Comments | November 18, 2026 (FR Nov 23, 2026) |
| Initial Public Comments Due | GN Docket No. 25-59 | ECFS Formal Comment Window | December 3, 2026 |
| Reply Comments Due | GN Docket No. 25-59 | ECFS Reply Comment Window | December 14, 2026 |
| Statutory Selection Deadline | FCC 26-46 Mandate | Final Coordinator Determination | January 1, 2027 |
Policy Context: National Spectrum Strategy and Mid-Band Optimization
The transition of the 3.98–4.2 GHz band builds upon the earlier clearing of the lower C-band (3.7–3.98 GHz) completed under FCC Docket 18-122 and Auction 107. That initial initiative cleared 280 megahertz of mid-band spectrum for nationwide commercial mobile broadband, raising over $81 billion in gross bids and requiring extensive earth station filtering across thousands of commercial and educational sites.
Clearing an additional 160 megahertz reflects broader federal objectives articulated in the National Spectrum Strategy, which emphasizes repurposing mid-band frequencies to maintain international technological leadership in advanced wireless communications. Mid-band spectrum between 3 GHz and 7 GHz offers the propagation characteristics essential for high-throughput, low-latency mobile infrastructure. Relocation Strategies previously served in operational clearing roles during earlier spectrum realignments, and its nomination reflects satellite industry interest in standardizing transition accounting, technical audits, and earth station filter retrofits.
Consortium Consensus and Industry Reaction
The joint filing submitted on November 2, 2026 by Eutelsat, Hispasat, Intelsat, SES, and Star One highlighted the nominee’s operational experience in spectrum transition management. The satellite operators emphasized that appointing an entity familiar with the operational complexities of C-band earth station clearing reduces the risk of signal disruption to critical video distribution, data relays, and telemetry networks.
Terrestrial wireless trade associations and mobile network operators have welcomed the prompt selection, noting that finalizing the coordinator position ahead of the January 2027 statutory deadline minimizes administrative delays. Conversely, satellite broadcast affiliates and independent earth station operators have urged the Bureau to maintain rigorous oversight over reimbursement schedules and technical filter performance to ensure that signals compressed into the 40 megahertz upper allocation remain free from intermodulation and adjacent-channel interference.
Implications for Campus Wireless Testbeds, Earth Stations, and Radio Observatories
The reallocation of 4.0–4.16 GHz carries direct operational and regulatory consequences for academic institutions, wireless engineering researchers, and campus facilities:
- Campus 5G and 6G Experimental Licenses: University engineering laboratories holding FCC Part 5 experimental authorizations must monitor regional transition schedules. Research teams testing dynamic spectrum sharing, massive MIMO, or reconfigurable intelligent surfaces within the 4.0–4.2 GHz range will gain access to expanded commercial mid-band channels but must coordinate closely with the Relocation Coordinator to prevent interference with nearby incumbent downlinks.
- NSF Spectrum Innovation Initiatives: National Science Foundation (NSF) programs, including the SpectrumX National Center for Wireless Spectrum Research and National Radio Dynamic Zone (NRDZ) testbeds, utilize mid-band frequencies to develop automated coexistence mechanisms. The Upper C-band transition offers a real-world testbed for automated frequency coordination and passive-active sharing algorithms.
- Satellite Downlinks and Earth Station Filtering: Academic ground stations, university meteorological antennas, and research facilities collecting environmental feeds must assess their receiving hardware. Earth stations that receive feeds within 4.0–4.16 GHz must be retrofitted with bandpass filters or repointed to higher frequencies (4.16–4.20 GHz) to avoid front-end overload from high-power terrestrial base stations. Academic ground systems integrated with satellite earth observation data systems will require technical verification by campus engineering teams.
- Radio Astronomy Sensitivity: Observatories and radio telescope facilities operating broad-spectrum receivers across centimeter wavelengths face elevated noise floors. Research offices must ensure that institutional observatories register spectral protection zones and coordinate with regional spectrum coordinators.
- Research Administration and Compliance: University sponsored research offices and campus compliance units must review wireless testbed hardware under export control classification reviews and track dual-use communications technologies. Where wireless engineering projects involve advanced telecommunications prototypes, compliance teams should verify hardware against Export Control Classification Number controls while maintaining robust research security compliance programs. Faculty investigators submitting upcoming federal proposals should reflect campus testbed capabilities using standardized NSF Common Forms.
Comment Period and Procedural Schedule Through 2027
The FCC Wireless Telecommunications Bureau has established an expedited comment cycle under GN Docket No. 25-59. Formal comments on whether Relocation Strategies satisfies the requisite technical, management, and engineering criteria are due on or before December 3, 2026. Reply comments must be submitted no later than December 14, 2026.
Filings must be submitted electronically through the Commission’s Electronic Comment Filing System (ECFS). Following the review of public submissions, the Bureau is scheduled to issue a final determination on the coordinator’s appointment prior to the January 1, 2027 deadline established in FCC 26-46. Upon approval, the coordinator will publish an initial transition management plan, outlining earth station registration audits, filtering reimbursement schedules, and clearance benchmarks leading toward future spectrum auction proceedings.
Sources
- Federal Register: Proposed Upper C-Band Relocation Coordinator Selection Criteria (Document 2026-23905), checked 2026-11-23
- Federal Communications Commission: 3.7 GHz Band Transition and Upper C-Band Proceedings (GN Docket No. 25-59), checked 2026-11-23
- Legal Information Institute: 47 CFR Part 27 – Miscellaneous Wireless Communications Services, checked 2026-11-23
- National Telecommunications and Information Administration: National Spectrum Strategy, checked 2026-11-23







