Written and maintained by CASRAI Editorial Board
Published
On this page
The Navy SBIR/STTR program is the Department of the Navy’s channel for funding research and development by small businesses under the federal Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs. It is a component of the Department of Defense SBIR/STTR program and is aimed at Navy and Systems Command (SYSCOM) technology needs. Firms respond to topics published in monthly releases and submit through the DoD SBIR/STTR Innovation Portal (DSIP). As described on the official Navy SBIR pages on 2026-11-12, Phase I is a feasibility study of up to $140,000 plus an optional period of up to $100,000, each lasting no more than six months.
This guide summarizes how the Navy program is structured, what it funds, how a proposal moves through it, and where the 2026 reauthorization changes the picture. Programs change between releases, so every figure below is stated as it appeared on the cited official page on the date shown, and the topic announcement for a given release always controls over any summary, including this one.
Ask CASRAI · free to tryQuestion about this guide? Ask CASRAI answers with linked sources. 2 free questions a day, no account.
What it is and who runs it
SBIR was established in 1982 and STTR in 1992, both under the authority of 15 U.S.C. 638. According to the Navy SBIR overview (read 2026-11-12), the statutory purposes are to stimulate technological innovation, to use small business to meet federal research and development needs, to foster participation by disadvantaged small business concerns, and to increase private-sector commercialization of federally funded research. The Navy runs its own part of the Department of Defense program: topics come from Navy and SYSCOM requirements, and each SYSCOM provides its own guidance on later-phase processes.
The Navy program publishes solicitations as topic releases. The Navy overview page describes broad agency announcements issued usually three times a year for SBIR and twice for STTR, while the Navy SBIR home page (read 2026-11-12) describes releases made on a monthly basis, numbered as FY-2027 Release 1 through 12. Treat the home page as the current description of the release cadence and the older overview wording as background. The home page also states that the Navy has funded over $11 billion to commercialize SBIR/STTR technologies.
For the cross-agency picture, see the CASRAI guide to Department of Defense research funding, and for how SBIR differs from STTR in general, the SBIR vs STTR comparison.
Eligibility
Eligibility is set by the federal SBIR/STTR rules and by each topic announcement, not by the Navy page alone. The Navy home page directs applicants to the SBIR.gov eligibility FAQ. In summary, SBIR requires a U.S. for-profit small business, with ownership and control by U.S. citizens or permanent residents (some agencies allow venture-capital exceptions), fewer than 500 employees including affiliates, and a principal investigator primarily employed by the small business. The small business is the prime awardee.
STTR adds a mandatory partner. The Navy overview states that an STTR proposal needs a research partner, which can be a university, a federally funded research and development center (FFRDC) or a qualified non-profit research institution. The small business is the prime and must perform at least 40% of the work; the partner must perform at least 30%. Read the STTR definition for the terminology, and check the specific topic text for any additional restriction before investing proposal time.
The 2026 reauthorization also expands security screening of applicants. The Congressional Research Service describes new screening provisions, for example reference to the Section 1260H list. Applicants should expect the implementing guidance to appear in solicitation instructions.
What it funds or requires
The program funds research and development, not general operating costs. The Navy overview describes three phases:
- Phase I is a feasibility study. The Navy states, as a general guide that does not replace the announcement, that SBIR and STTR Phase I base awards are up to $140,000, with an option of up to $100,000, and that each period lasts up to six months.
- Phase II is substantial research and development in which prototypes are built and tested. The Navy describes a two-step competitive process for Phase II, and each SYSCOM has its own guidance.
- Phase III is commercialization and uses no SBIR funds. Funding comes from the government and/or the private sector, and a non-competitive follow-on contract is possible. The Navy home page links a Phase III Guidebook.
The Navy also describes a Commercialization Readiness Program (CRP, formerly the Commercialization Pilot Program), which uses the statutory 1% allocation for administrative funding to SYSCOMs to support Phase II.5 efforts and non-financial assistance (STP) as named on the overview page. Phase II awardees are also pointed to Navy Launch on the home page.
SBIR.gov describes the awards as equity-free funding. For an explanation of how the contract vehicle works after selection, see SBIR contracts, and for the phase differences see SBIR Phase I vs Phase II. The data table below compares the Navy figures against the federal figures on SBIR.gov.
Application and compliance steps
- Find an open release. The Navy home page lists releases by number, with a pre-release period before each opens.
- Read topics during pre-release. Per the home page, the technical point of contact (TPOC) for a topic may be contacted for technical questions only before the release opens.
- Use the topic Q&A once open. After a release opens, questions go through the public Topic Q&A on DSIP rather than direct TPOC contact.
- Submit through DSIP. Proposals are submitted electronically through the DoD SBIR/STTR Innovation Portal, within the window stated for that release.
- Watch for selection notices carefully. The Navy page states that a selectee listing is not a notification of contract award; award follows separate steps.
Before starting, an institution that plans an STTR partnership should settle the research partner’s intellectual property and workload terms early. The NSF SBIR/STTR guide shows how another agency frames the same partnership requirement.
Typical timeline phases
The sequence is the same in every release, even though the dates differ. The Navy home page describes a pre-release period, an open period for submissions, a close, and then selection; the exact dates for any release appear only on the home page and in the announcement. As described on the official page on 2026-11-12, FY-2027 Release 2 had a stated pre-release, opening and closing schedule on that page; these dates change release by release, so use the live page rather than any copy.
After Phase I, a firm that wishes to continue enters the Navy’s two-step Phase II process. Phase II.5 support through the CRP and the Navy Launch effort is for Phase II awardees, and Phase III follows commercialization in the way the overview describes.
Reauthorization and the 2026 rules
The Congressional Research Service reports (IN12705, read 2026-11-12) that P.L. 119-83, the Small Business Innovation and Economic Security Act, was signed on April 13, 2026, ending a six-month lapse in SBIR/STTR authority and extending it through September 30, 2031. The same summary lists these changes relevant to Navy applicants:
- The SBIR set-aside is 3.2% of extramural R&D budgets for agencies at or above $100 million, and the STTR set-aside is 0.45% for agencies at or above $1 billion.
- Beginning in FY2027, agencies set a maximum number of Phase I and Phase II proposals per firm per fiscal year, which may be applied per solicitation, per topic or per fiscal year.
- A strategic breakthrough award of up to $30 million is created, which requires a prior Phase II award, demonstrated market demand and a 100% dollar-for-dollar match; the DoD version requires a program objective memorandum commitment.
SBIR.gov states that, as of October 16, 2026, agencies may issue awards without an SBA waiver of up to $335,937 for Phase I and $2,239,578 for Phase II, including modifications. These are the federal thresholds, not Navy award sizes. The Navy’s own Phase I amounts are those on its overview page. See also SBIR reauthorization for the broader legislative background.
Common mistakes
- Treating the Navy overview figures as a ceiling for every topic. The Navy states the Phase I amounts are a general guide and not a replacement for the announcement.
- Reading a selectee listing as an award. The Navy states it is not a notification of contract award.
- Contacting the TPOC after a release opens. Contact is for technical questions before opening; afterwards use the public Q&A.
- Confusing federal waiver thresholds with Navy award size. The SBA thresholds are the limit above which a waiver is required.
- Underestimating STTR partner requirements. The 40% and 30% work shares are requirements, not targets.
Related programs
| Program | How it relates | Where to read more |
|---|---|---|
| Navy STTR | Same Navy program, with a required research partner (university, FFRDC or qualified non-profit) and a 40%/30% work split | SBIR vs STTR |
| DoD SBIR/STTR | The parent program of which the Navy is a component | DoD research funding |
| NSF SBIR/STTR | Another SBIR/STTR agency under the same statute | NSF SBIR/STTR program |
| Phase II follow-on | The step after feasibility, with prototype development | Phase I vs Phase II |
FAQ
What is the Navy SBIR program?
It is the Navy’s component of the Department of Defense SBIR/STTR program, which funds small-business research and development against Navy and SYSCOM needs.
How much is a Navy SBIR Phase I award?
As described on the Navy SBIR overview on 2026-11-12, base awards are up to $140,000 with an option of up to $100,000, each period up to six months. The topic announcement controls.
Where do I submit a Navy SBIR proposal?
Through DSIP, the DoD SBIR/STTR Innovation Portal, during an open release.
Does the Navy accept STTR proposals?
Yes. STTR requires a research partner and the small business must do at least 40% of the work.
Is SBIR authority currently in force?
According to the CRS summary read on 2026-11-12, P.L. 119-83 extended SBIR/STTR authority through September 30, 2031, after a six-month lapse.
Sources
- Navy SBIR/STTR overview, navysbir.com/overview.htm (read 2026-11-12)
- Navy SBIR/STTR home page, navysbir.com (read 2026-11-12)
- SBIR.gov, About (read 2026-11-12)
- Congressional Research Service, IN12705, SBIR/STTR reauthorization (read 2026-11-12)
Data: Navy SBIR/STTR program figures versus federal SBIR/STTR parameters, as published 2026-11-12
Compiled from the official Navy SBIR/STTR overview, the SBIR.gov About page and a Congressional Research Service summary of P.L. 119-83; each value is as stated on the cited page on the access date.
Period covered: 2026. Coverage: United States.
| Parameter | Program | Value | Unit |
|---|---|---|---|
| Phase I base award, up to | Navy SBIR | 140000 | USD |
| Phase I option, up to | Navy SBIR | 100000 | USD |
| Phase I base award, up to | Navy STTR | 140000 | USD |
| Phase I option, up to | Navy STTR | 100000 | USD |
| Phase I period, each, up to | Navy SBIR and STTR | 6 | months |
| Waiver-free Phase I amount, up to | Federal SBIR/STTR (SBIR.gov) | 335937 | USD |
| Waiver-free Phase II amount, up to | Federal SBIR/STTR (SBIR.gov) | 2239578 | USD |
| Set-aside for agencies with extramural R&D of $100M or more | SBIR | 3.2 | percent |
| Set-aside for agencies with extramural R&D of $1B or more | STTR | 0.45 | percent |
| Minimum small-business share of work | STTR | 40 | percent |
| Minimum research-partner share of work | STTR | 30 | percent |
Sources
- Navy SBIR/STTR overview (accessed 2026-11-12)
- SBIR.gov About (accessed 2026-11-12)
- CRS IN12705 SBIR/STTR reauthorization (accessed 2026-11-12)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.







