Written and maintained by CASRAI Editorial Board
Published
On this page
The NOAA SBIR Program is the National Oceanic and Atmospheric Administration’s Small Business Innovation Research program: a competitive grant program, run by NOAA’s Technology Partnerships Office, that funds U.S. small businesses to research and develop technologies tied to NOAA’s mission. In the FY2025 funding notice a Phase I award is up to $190,000 for up to six months, and a Phase II award is approximately up to $690,000 for up to 24 months. The details below are as described in that official notice (NOAA-OAR-TPO-2025-0001), checked 2026-11-17; programs change from cycle to cycle.
Ask CASRAI · free to tryQuestion about this guide? Ask CASRAI answers with linked sources. 2 free questions a day, no account.
What the NOAA SBIR program is and who runs it
NOAA’s SBIR program operates under the federal SBIR statute (15 U.S.C. 638) and the Small Business Administration’s SBIR Policy Directive, both cited in the FY2025 funding notice. It is listed in the federal Assistance Listings as 11.021, “NOAA Small Business Innovation Research (SBIR) Program”. NOAA issues its funding notices through Grants.gov, and the notice names the NOAA SBIR team as the point of contact ([email protected], shown here as plain text).
Two features of the notice are easy to miss. First, NOAA states that it has the unilateral right to select SBIR research topics and awardees in both Phase I and Phase II, and to award several grants or none under a given topic; awards are subject to the availability of funds. Second, the program is not a substitute for existing unsolicited-proposal mechanisms, and unsolicited applications are not accepted: you apply to a published topic in a published notice, not with an open-ended idea. For how SBIR differs from its sister program, see CASRAI’s comparison of SBIR vs STTR.
The three phases and what each one funds
NOAA follows the standard three-phase SBIR structure. The data table below sets out, for each phase, the purpose, the award ceiling, the performance period and the funding source as the FY2025 notice states them. Beyond the table, the notice adds several conditions worth planning around.
Phase I: feasibility
Phase I determines the scientific, technical and commercial merit and feasibility of the proposed research, and the quality of the small business’s performance. In a typical fiscal year NOAA anticipates up to 35 Phase I awards, depending on its budget. The total performance period is no more than seven months: six months of research and development plus one month to prepare and submit the final report. The FY2025 listing on Grants.gov shows an expected 35 awards and an award ceiling of $190,000, with no cost sharing required.
The most consequential condition is the no-cost-extension rule. To keep the Phase II process on schedule, NOAA does not permit no-cost extensions on Phase I projects that intend to advance to Phase II. If a Phase I awardee requests a no-cost extension, the notice states, that awardee is ineligible to apply for Phase II. A project plan that cannot finish inside six months therefore has a real cost.
Phase II: research and development
Phase II further develops work from Phase I that shows commercial potential; it is the research-and-development or prototype stage. Every Phase I awardee that receives funding and stays in compliance with its award terms is given the opportunity to submit a Phase II application. The application is a comprehensive proposal with a detailed plan to commercialize the final product, and the instructions come in a separate notice that NOAA expects to release about 30 days before the Phase I performance period ends. For planning, NOAA aims to make Phase II awards about six months after Phase I ends, and anticipates that approximately half of Phase I awardees will receive Phase II awards, depending on funds and results.
Phase III: commercialization
Phase III is not funded by SBIR. The small business obtains funding from the private sector or from a non-SBIR government source to commercialize the technology. Because NOAA’s notice describes the Phase III funding as outside the program, there is no Phase III award ceiling to compare. SBIR rights in the resulting data are a separate question covered in CASRAI’s dictionary entry on SBIR data rights.
Eligibility, as stated in the funding notice
The notice sets these requirements for applicants. Each is as described in the FY2025 notice and applies to that cycle’s rules.
- Small business concern. The applicant must qualify as a small business concern for research and development purposes at the time of award, under 13 CFR 121.701 to 121.705. The size, ownership and other requirements are certified at award (Appendix B of the notice), not at application.
- Principal investigator. The PI’s primary employment must be with the small business at the time of award and during the project. Primary employment means at least 51% of the PI’s time, and it precludes full-time employment with another organization. Replacing a PI on a Phase I award needs the NOAA Grants Officer’s prior written approval.
- Where the work is done. The research and development must be performed in the United States. An exemption must be requested in writing before the application is submitted, is considered only in rare and unique circumstances, and must be approved in writing by the NOAA Grants Officer.
- Who does the work. In Phase I, at least two-thirds of the research and analytical effort must be performed by the awardee. The combined cost of consultant fees, facility leases, usage fees and other subcontract, subaward or purchase agreements may not exceed one-third of the total award.
- Ownership. NOAA elects not to use the authority that would allow venture capital operating companies, hedge funds or private equity firms to participate in its SBIR program.
- Conflict of interest. Applicants and affiliated individuals may not take part in selecting topics or reviewing proposals. Associated entities, such as guest researchers and CRADA partners working with NOAA, may apply only if they had no role in developing or reviewing the topic, received no non-public information about it and received no Department of Commerce help preparing the proposal.
What NOAA SBIR funds: topic areas and priorities
NOAA solicits research topics within its own mission. The FY2025 notice lists six topic areas:
- Extreme Events and Cascading Hazards
- Coastal Resilience
- The Changing Ocean
- Water Availability, Quality, and Risk
- Effects of Space Weather
- Monitoring and Modeling for Climate Change Mitigation
The notice also records two statutory or executive priorities that the program is to consider: manufacturing-related innovation (Executive Order 13329) and energy efficiency and renewable energy (Public Law 110-140). Because NOAA writes new topics each cycle, treat this list as the FY2025 menu rather than a standing one.
On the budget side, the notice allows a reasonable profit or fee of up to 7% of the sum of direct and indirect costs; using it is optional. Phase I recipients are also eligible for Technical and Business Assistance (TABA) from a vendor NOAA provides.
Application steps
- Register with the SBA Company Registry. SBA tracks ownership in its Company Registry at SBIR.gov. The applicant must register before submitting and attach the saved registration information as a PDF to the SF-424 application.
- Register in SAM.gov and Grants.gov. A current System for Award Management registration and a Unique Entity Identifier are required at the time of application. The notice warns that a new Grants.gov user may need several days or longer before an authorized individual can submit.
- Pick one topic. Match the project to one of the published topic areas;
- Prepare the project narrative. The cover page, project abstract and technical content together are limited to 15 pages, including references. The narrative should address commercial and societal potential as well as the science, because both are scored.
- Prepare the budget. Phase I budgets may not exceed $190,000. State in the budget narrative if you will not take the 7% fee, and check the two-thirds and one-third split before submitting.
- Submit through Grants.gov. Applications are submitted electronically against the funding opportunity number. No technical clarifications are allowed after submission, so reviewers see only what is in the application.
How Phase I applications are scored
Applications that pass the notice’s screening criteria are reviewed by up to three NOAA and external reviewers by peer review, against four weighted criteria. This weighting is the clearest guide to where proposal effort pays off, and it is easy to underweight the commercial section in a research-style narrative.
| Criterion in the FY2025 notice (Section 4.3) | Points |
|---|---|
| Scientific merit and technical approach of the proposed research | 40 |
| Level of innovation the effort offers to the topic area | 20 |
| Commercial and societal impacts and potential applications | 20 |
| Qualifications of the principal and key investigators, staff and consultants, and availability of instrumentation and facilities | 20 |
The Program Manager averages the reviewers’ scores and ranks applications from highest to lowest. Based on the distribution of scores, the Program Manager sets the score above which applications are considered technically superior; applications below that line are not considered further. The technically superior applications go to NOAA’s Selecting Official, who makes the final decision using selection factors beyond the score.
Typical timeline phases
Described as stages rather than dates, one cycle in the FY2025 notice runs as follows. Specific calendar dates differ each cycle and are set in each notice.
- Notice open and close. NOAA publishes the Phase I notice on Grants.gov with an opening and a closing date.
- Review. Screening, peer review, Program Manager ranking and the Selecting Official’s decision.
- Phase I award and performance. Up to six months of research and development, plus one month for the final report, seven months in total.
- Phase II notice. A separate notice is released about 30 days before Phase I ends, with instructions for the Phase II application.
- Phase II award. NOAA’s planning goal is roughly six months after Phase I ends, for up to 24 months of work.
Common mistakes
- Asking for a Phase I no-cost extension. It makes the awardee ineligible for Phase II under the notice.
- Letting subcontracts and consultants grow past one-third. The Phase I limit covers consultant fees, facility leases, usage fees and subawards together, not subcontracts alone.
- Overlooking the PI test. A PI with less than 51% of time at the small business, or with full-time employment elsewhere, does not meet the primary-employment test.
- Relying on a venture-backed ownership structure. NOAA does not allow venture capital operating company, hedge fund or private equity participation under its SBIR authority.
- Treating the commercial section as an afterthought. Together with qualifications and innovation it carries 60 of the 100 Phase I points.
- Counting on clarification. No technical clarifications are allowed after submission.
- Skipping registrations. SBA Company Registry, SAM.gov and Grants.gov setup can take days; start before the notice opens.
Related programs
NOAA is one of several federal agencies that run SBIR programs under the same statute, each with its own notice, topics and limits, so figures from one agency should never be carried to another. CASRAI covers others as separate guides.
| Program | CASRAI guide |
|---|---|
| USDA SBIR | USDA SBIR program guide |
| AFWERX SBIR | AFWERX SBIR guide |
| Navy SBIR | Navy SBIR guide |
| SBIR and its technology-transfer counterpart | SBIR vs STTR comparison |
Sources
- NOAA Technology Partnerships Office: FY2025 SBIR Phase I Notice of Funding Opportunity NOAA-OAR-TPO-2025-0001 (Grants.gov attachment), checked 2026-11-17
- Grants.gov: NOAA Small Business Innovation Research (SBIR) Program, FY25 Phase I opportunity listing, checked 2026-11-17
- Cornell Legal Information Institute: 15 U.S.C. 638, Research and development, checked 2026-11-17
- Cornell Legal Information Institute: 13 CFR 121.702, size and eligibility standards for the SBIR and STTR programs, checked 2026-11-17
- SBA via SBIR.gov: SBIR and STTR Policy Directive, May 2023, checked 2026-11-17
Data: NOAA SBIR phases: purpose, award ceiling, performance period and funding source (FY2025 notice)
Compares the three SBIR phases as described in NOAA's FY2025 Phase I funding notice (NOAA-OAR-TPO-2025-0001) and the matching Grants.gov listing. Values are the figures the notice states for that cycle; Phase II figures are planning amounts, and Phase III is funded outside SBIR.
Period covered: FY2025 funding cycle. Coverage: United States.
| Phase | Purpose | Award ceiling (USD) | Performance period (months) | Funding and award notes |
|---|---|---|---|---|
| Phase I - feasibility | Determine scientific, technical and commercial merit and feasibility | 190000 | 6 (plus 1 month for final report; 7 total) | Grant; typically up to 35 awards per year; no cost sharing; no no-cost extension if advancing to Phase II |
| Phase II - research and development | Further develop Phase I work with commercial potential; R&D or prototype stage | 690000 | 24 | Grant; approximately up to this amount; separate notice about 30 days before Phase I ends; about half of Phase I awardees anticipated |
| Phase III - commercialization | Commercialize the technology | None (not an SBIR award) | Not applicable | Private-sector or non-SBIR government funding; no SBIR award ceiling |
Sources
- NOAA FY2025 SBIR Phase I NOFO NOAA-OAR-TPO-2025-0001 (accessed 2026-11-17)
- Grants.gov listing: NOAA SBIR FY25 Phase I (accessed 2026-11-17)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.







