Written and maintained by CASRAI Editorial Board
Published
On this page
Tiny Tapeout is a shared chip-fabrication programme: many small integrated-circuit designs are placed on one manufacturing run (a “shuttle”), so an individual, a class or a lab can get a design made in silicon without paying for a whole run. Designs are built in a browser-based tool (Wokwi) or written in a hardware description language, hardened into layout by an automated GitHub workflow, and submitted through the Tiny Tapeout application. The programme’s own FAQ puts fabrication at 6 to 9 months, with up to about a year in total once board assembly, testing and fulfilment are included, so the “idea to chip in minutes” tagline describes the design flow, not the delivery time.
Definition and scope
A “tapeout” is the point at which a finished chip design is released to a manufacturer. A shuttle (multi-project run) means several unrelated projects share one manufacturing run, which the Tiny Tapeout home page presents as the reason costs stay low. Each project buys a share of the chip area measured in tiles, and the finished silicon is delivered on a small breakout board that plugs into a demo board.
The home page positions the programme for beginners learning digital design, for advanced users who write HDL, and for universities and schools, which have a dedicated section. It lists universities among its customers, including UC Santa Cruz, Carnegie Mellon University and DTU. This page describes the programme as documented on tinytapeout.com (read 12 November 2026); it does not review designs, tools or the programme’s operator, and shuttle availability, pricing and deadlines change run by run, so they are not stated here.
How a Tiny Tapeout submission works in practice
1. Choose a design route
The home page describes a learning path that starts with digital design lessons for newcomers, then moves to a Wokwi template (basic or advanced) or to an HDL template for more experienced users. According to the FAQ, Verilog is the main supported HDL, with limited VHDL support. Wokwi designs are saved to a GitHub repository. Templates for Wokwi, Verilog and (on the SKY family) analog projects are listed on the home page.
2. Let the GDS action harden the design
Committing to the project repository runs a GDS GitHub Action that turns the design into a GDS layout file. The FAQ says you must enable Actions and set the GitHub Pages source to GitHub Actions; the action can be re-run from the Actions tab. The flow uses OpenLane, with Yosys for synthesis, mapped to Skywater 130 nm standard cells for the SKY shuttles. The action’s artifact contains the Verilog source, a metrics report, synthesis reports and the final GDS and LEF files. If the action runs very long or fails during placement or routing, the FAQ says the design may need more tiles.
3. Submit through the Tiny Tapeout application
Submissions are made through the Tiny Tapeout application (app.tinytapeout.com). To use a newer version of a design you create a new submission, and you can keep updating until the tapeout deadline of that shuttle. One failure the FAQ calls out: a project hardened for one PDK cannot be submitted to a shuttle that uses a different PDK.
4. Wait for fabrication and the devkit
The FAQ states that fabrication takes 6 to 9 months, followed by PCB assembly, testing and order fulfilment, for a total of up to about one year. Each devkit is two pre-assembled boards: a breakout board that holds the ASIC and a demo board with a microcontroller, LEDs, a 7-segment display and DIP switches. The FAQ states that designs are not delivered as bare dies, and that some GF180 shuttles use chip-on-board.
Shuttle families and process nodes
The home page groups runs into families named SKY, IHP and GF, plus a CAD 25a shuttle and older chips labelled TT6 to TT9. At the time of reading, SKY26d, SKY26e and GF26c were listed as open, with archived runs including SKY 25a to 26c, IHP 25a to 26b and GF 26a and 26b. The home page uses only those labels; the process behind each is stated on the FAQ and on individual run pages:
- SKY: the FAQ says TT04 to TT10 use the open-source Skywater 130 nm PDK.
- IHP: the IHP 25a run page (ttihp25a) says it was submitted to IHP using the sg13g2 130 nm open-source PDK. It launched on 12 March 2025, submission closed on 28 March 2025, and chips were expected in February 2026. The page credits the SwissChips Initiative for IHP PDK support and the German BMBF project FMD-QNC (16ME0831) for manufacturing funding.
- GF: listed as a shuttle family with Wokwi and Verilog templates; the FAQ mentions GF180 chip-on-board delivery on some shuttles.
The data table below compares the tile, pin, analog-slot and timeline limits that the FAQ states for the TT04 to TT10 designs. The values are tied to those chip generations; later shuttles can differ, so always read the page of the shuttle you are targeting.
Tiles, pins and the analog slot
A tile is the unit of chip area you buy. For TT04 to TT10 the FAQ gives the standard tile size as about 160 by 100 micrometres, enough for roughly 1,000 digital gates. The default project size is 1×1; larger designs declare more tiles through the tiles setting in info.yaml, and extra tiles can be purchased.
The pin interface is fixed: a clock, an active-low reset, 8 input-only pins, 8 output-only pins and 8 bidirectional pins (24 general-purpose I/O in all). The FAQ says the clock can run at least 50 MHz, with test-silicon measurement still in progress, and that the default clock comes from the on-board RP2040. Analog projects use a separate slot of 1×2 tiles. Slots are limited per shuttle, and a project can use at most two, so valid analog sizes are 1×2 or 2×2; larger requests are billed as separate projects.
Where it matters for labs and teaching
For a teaching lab or a research group, the sourced attraction is access: a shared run, an automated open-source flow and a fixed pin interface mean a student project and a research test structure go through the same pipeline. Three practical consequences follow directly from the documentation.
- Plan on the calendar, not the tagline. With 6 to 9 months of fabrication and up to a year to a delivered devkit, a course that wants silicon in students’ hands has to submit at least a year before the demonstration date. The IHP 25a run is an example of the pattern: closed in March 2025 with chips expected in February 2026.
- Check the PDK before you design. A design hardened for one PDK cannot go to a shuttle on another, and the SKY and IHP families use different 130 nm open-source PDKs.
- Budget by design size and type. The home page says price depends on design size, the shuttle and whether the design is analog or digital, and directs buyers to the calculator on the site. Early-bird prices are limited per shuttle and apply to individuals only. This page gives no prices because they change per shuttle.
Pre-silicon verification fits alongside this flow. Circuit-level simulation of analog blocks is covered in our ngspice open-source circuit simulation guide, and the shuttle idea also appears in photonics, covered in photonic integrated circuits. For the packaging step that follows wafer fabrication in conventional chip production, see wafer-level packaging. Because the tools are open source, the licence terms matter too; see open-source licences and the open-source software definition.
Licensing of Tiny Tapeout projects
The FAQ says the project templates default to the Apache-2.0 licence and that you should update copyright headers with your own information. When forking another design you must keep the original author’s copyright and licence notices; changing the attribution to your own name is not permitted. The FAQ as read does not state an open-source requirement for submitted designs.
Common misunderstandings
“A chip in minutes”
The tagline “From idea to chip design in minutes” refers to the design flow. Manufacturing takes 6 to 9 months and the full wait to a tested devkit can be about a year.
“You receive bare chips”
Per the FAQ, designs are not delivered as bare dies. The ASIC arrives on a breakout board, with a separate demo board.
“All shuttles use the same process”
They do not. SKY uses Skywater 130 nm, IHP 25a used the sg13g2 130 nm PDK, and the GF family is listed separately (the FAQ mentions GF180 on some shuttles). A design hardened for one cannot be submitted to another.
“A tile holds any amount of logic”
A standard TT04 to TT10 tile is roughly 1,000 digital gates; bigger designs need more tiles, which costs more per the pricing note above.
“The Tiny Tapeout price is fixed”
The home page says price depends on size, shuttle and analog versus digital. Older news coverage quotes 2023 figures (the Hackster article on Tiny Tapeout 3 gave a $25 design submission and $100 plus shipping for chip and PCB), which should be treated as history, not current pricing.
“It is run through the Efabless platform”
Early coverage of Tiny Tapeout 3 described the Efabless platform and 250 designs. The current documentation lists SKY, IHP and GF families, so older articles do not describe present shuttles.
Origins
Hackster News reported that Matthew Venn launched Tiny Tapeout 3 and that it grew out of his Zero to ASIC course, with the SiliWiz tool built together with Uri Shaked. That is secondary reporting of the programme’s early history, cited here for background only.
Frequently asked questions
What is Tiny Tapeout?
A shared chip-fabrication service where many small designs are combined on one manufacturing run so each designer buys only a small area of silicon.
How long does it take to get a Tiny Tapeout chip?
The FAQ says fabrication takes 6 to 9 months, and the whole process through PCB assembly, testing and fulfilment can reach about a year.
What can I design with it?
Digital designs built in Wokwi or written in Verilog (limited VHDL support), and analog projects on shuttles that offer an analog slot, within the tile and pin limits above.
Which process does it use?
It depends on the shuttle: Skywater 130 nm for TT04 to TT10 SKY runs, and the sg13g2 130 nm PDK for IHP 25a. Check the page of your shuttle.
Does Tiny Tapeout cost a fixed amount?
No. The site says price depends on design size, shuttle and design type, and provides a calculator.
Sources
- Tiny Tapeout, home page, tinytapeout.com, read 12 November 2026.
- Tiny Tapeout FAQ, tinytapeout.com/faq/, read 12 November 2026.
- Tiny Tapeout IHP 25a run page, tinytapeout.com/runs/ttihp25a, read 12 November 2026.
- Hackster.io News, “Matthew Venn Launches Tiny Tapeout 3 to Take You from Idea to Chip Design in Minutes” (secondary, history only).
Data: Tiny Tapeout TT04-TT10 design limits and timeline as stated in the programme FAQ
Specification and timeline values for Tiny Tapeout TT04 to TT10 shuttles, compiled from the programme FAQ and the IHP 25a run page, read 12 November 2026.
Period covered: 2025/2026.
| Item | Value | Applies to | Source |
|---|---|---|---|
| Standard tile size | about 160 x 100 micrometres (roughly 1,000 digital gates) | TT04-TT10 | Tiny Tapeout FAQ |
| Default project size | 1x1 tile; more tiles set via tiles in info.yaml | TT04-TT10 | Tiny Tapeout FAQ |
| Input-only pins | 8 | TT04-TT10 | Tiny Tapeout FAQ |
| Output-only pins | 8 | TT04-TT10 | Tiny Tapeout FAQ |
| Bidirectional pins | 8 (plus clock and active-low reset) | TT04-TT10 | Tiny Tapeout FAQ |
| Clock | at least 50 MHz (test silicon measurement in progress); default from on-board RP2040 | TT04-TT10 | Tiny Tapeout FAQ |
| Analog slot | 1x2 tiles; up to two slots per project (1x2 or 2x2); limited per shuttle | Shuttles offering analog | Tiny Tapeout FAQ |
| Process / PDK | Open-source Skywater 130 nm | TT04-TT10 (SKY) | Tiny Tapeout FAQ |
| Process / PDK | sg13g2 130 nm open-source PDK (IHP) | IHP 25a | Tiny Tapeout IHP 25a run page |
| Fabrication time | 6 to 9 months | TT04-TT10 | Tiny Tapeout FAQ |
| Total time incl. assembly, testing, fulfilment | up to about 1 year | TT04-TT10 | Tiny Tapeout FAQ |
| Delivery format | breakout board with ASIC plus demo board; no bare dies | TT04-TT10 | Tiny Tapeout FAQ |
| IHP 25a launch to chips expected | launched 12 March 2025; submissions closed 28 March 2025; chips expected February 2026 | IHP 25a | Tiny Tapeout IHP 25a run page |
Sources
- Tiny Tapeout FAQ (accessed 2026-11-12)
- Tiny Tapeout IHP 25a run page (accessed 2026-11-12)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.







