
On November 23, 2026, NASA awarded a $290.6 million contract to Northrop Grumman Systems Corporation on behalf of the National Oceanic and Atmospheric Administration to build three next-generation microwave weather sounding instruments for the Near Earth Orbit Network, securing foundational atmospheric temperature and moisture data vital for university atmospheric modeling, numerical weather prediction, and climate science research.
What happened
On November 23, 2026, the National Aeronautics and Space Administration announced the award of a $290.6 million contract in an official NASA news release on behalf of the National Oceanic and Atmospheric Administration (NOAA). Under contract release C26-017, NASA selected Northrop Grumman Systems Corporation to deliver three Sounder for Microwave-Based Applications (SMBA) flight instruments. These instruments represent the next generation of spaceborne microwave sounders designed to operate in low Earth orbit aboard NOAA’s Near Earth Orbit Network (NEON) satellites.
The agreement is structured as a hybrid contract incorporating cost-plus-fixed-fee, firm-fixed-price, and time-and-materials provisions. The period of performance commenced immediately on November 23, 2026, and extends through April 1, 2042, covering full instrument engineering, fabrication, environmental testing, launch integration, and post-launch mission support. NASA’s Goddard Space Flight Center in Greenbelt, Maryland, is managing acquisition and development oversight, while NOAA funds the program, establishes observation baselines, and assumes operational authority once the spacecraft reach orbit. Internationally, the constellation architecture is tracked in the World Meteorological Organization OSCAR satellite database as a core contribution to the global space-based observing system.
Key details
The Sounder for Microwave-Based Applications instruments serve as the primary microwave sounding payload for civil operational meteorology in the United States. Unlike passive optical and infrared imagers that cannot penetrate thick cloud decks, microwave radiometers measure emitted thermal radiation at selective microwave frequencies that pass through clouds, providing continuous, all-weather vertical profiles of atmospheric temperature and moisture. The data collected by SMBA directly informs medium-range 3- to 7-day numerical weather forecasts produced by NOAA’s National Weather Service (NWS) and international modeling centres.
The contract reflects NOAA’s institutional shift away from massive, multi-sensor polar orbiters toward disaggregated architectures. The table below outlines how the NEON SMBA program compares to its predecessor, the Joint Polar Satellite System (JPSS) Advanced Technology Microwave Sounder (ATMS) architecture:
| Program Dimension | Joint Polar Satellite System (JPSS) | Near Earth Orbit Network (NEON) |
|---|---|---|
| Primary Microwave Sensor | Advanced Technology Microwave Sounder (ATMS) | Sounder for Microwave-Based Applications (SMBA) |
| Spacecraft Architecture | Monolithic multi-instrument polar bus (VIIRS, CrIS, ATMS, OMPS) | Disaggregated constellation of dedicated small-to-medium platforms |
| Procurement Mechanism | Single-prime observatory contracting with decadal lead times | Hybrid contract (CPFF, FFP, T and M) with commercial payload interfaces |
| Period of Performance | JPSS operations running through late 2030s | November 23, 2026 through April 1, 2042 |
| Contract Value | Multi-billion dollar integrated observatory series | $290.6 million for three dedicated SMBA flight instruments |
| Numerical Weather Prediction Role | Supplies ~80% of satellite assimilation data for 3–7 day forecasts | Maintains and densifies cloud-penetrating thermodynamic soundings |
Background and context
For more than four decades, civil operational weather forecasting has depended on polar-orbiting meteorological satellites. The Polar-orbiting Operational Environmental Satellites (POES) series, culminating in NOAA-19, established continuous global microwave and infrared soundings. This capability was subsequently modernized through Suomi NPP and the Joint Polar Satellite System, which deployed NOAA-20 and NOAA-21, with JPSS-3 and JPSS-4 scheduled to follow.
However, the traditional procurement model for polar satellites—building multi-ton spacecraft carrying four or five separate high-power instruments—proved vulnerable to schedule slips, escalating lifecycle costs, and single-point launch risks. As detailed in NOAA NESDIS Near Earth Orbit Network program documentation, NOAA conceived NEON as an agile, disaggregated architecture. Rather than placing all operational sensors onto a single massive bus, NEON distributes sounders and imagers across smaller, independently launched platforms. This distributed approach allows NOAA to refresh spaceborne hardware more frequently, incorporate commercial bus designs, and mitigate constellation replenishment gaps.
To pioneer this transition, NOAA initiated QuickSounder as NEON’s first pathfinder project, demonstrating that an operational microwave sounder could be integrated onto a commercial small-satellite bus on an accelerated timeline. As highlighted in Around Prague science reporting, sustaining these satellite observations is critical because space-based microwave soundings provide the vast majority of raw observation value assimilated into global forecast models, sharpening predictive accuracy for severe storms, hurricanes, and extreme winter weather events.
Reaction
The award of the SMBA contract to Northrop Grumman Systems Corporation was welcomed across aerospace and meteorological sectors as a crucial stabilization of the post-JPSS weather satellite roadmap. Aerospace analysts noted that Northrop Grumman holds deep technical heritage in spaceborne microwave radiometry, having developed both the Advanced Microwave Sounding Unit (AMSU) and the ATMS sensors currently flying on operational polar orbiters. An MLQ.ai industry analysis pointed out that securing three SMBA flight units under a single contract ensures industrial base continuity and manufacturing efficiencies for cryogenic detectors, precision scanning reflectors, and high-frequency microwave receivers through the 2030s.
Atmospheric researchers and weather forecasting authorities also welcomed the multi-decade scope of the award. Representatives from the atmospheric science community emphasized that numerical prediction models require uninterrupted data continuity. If polar microwave sounding data were interrupted, global forecast skill would degrade significantly, especially across oceanic and polar regions where in-situ radiosonde balloon soundings are sparse. NASA and NOAA leadership highlighted that the close interagency partnership managed through Goddard Space Flight Center allows NOAA to harness NASA’s procurement and systems engineering rigor while keeping operational lines aligned with National Weather Service needs.
What it means for researchers, universities and research offices
The initiation of the SMBA instrument line carries direct consequences for academic research offices, university atmospheric science departments, and federal cooperative research institutes:
- NOAA Cooperative Institute Research Pipelines: Academic hubs such as CIMSS at the University of Wisconsin–Madison, CISESS at the University of Maryland, and CIRA at Colorado State University will play central roles in pre-launch sensor characterization, Community Radiative Transfer Model (CRTM) updates, and data assimilation algorithms.
- Federal Grant Solicitations: University investigators working in satellite meteorology, climate dynamics, and numerical modeling should monitor upcoming funding calls under NASA ROSES Earth Science solicitations and NOAA Joint Technology Transfer Initiative (JTTI) opportunities to develop AI/ML-enhanced sounding retrievals and evaluate synthetic SMBA radiance observations.
- Open Data Access and Storage Requirements: In accordance with federal public access mandates and the principles of open data, all Level-1b calibrated sensor data records and Level-2 geophysical retrieval products generated by NEON satellites will be openly accessible without proprietary embargo periods through NOAA cloud archives and the Comprehensive Large Array-data Stewardship System (CLASS).
- Data Standardization and Model Coupling: Geophysical data products will adhere strictly to international CF Conventions for NetCDF climate metadata. University high-performance computing centers and data managers supporting atmospheric research teams will need to align preprocessing pipelines to ingest these standardized streaming data formats.
- Peer-Reviewed Research Opportunities: Early calibration and validation (cal/val) findings, radiometer calibration methods, and error covariance characterizations will generate extensive literature in specialized journals such as IEEE Transactions on Geoscience and Remote Sensing and American Meteorological Society publications.
What happens next
With the formal contract executed on November 23, 2026, Northrop Grumman will begin detailed engineering and design maturation for the three SMBA instruments at its designated facilities. Key milestone schedules include:
- Preliminary and Critical Design Reviews: Over the next 24 to 36 months, NASA Goddard and NOAA NESDIS oversight teams will conduct formal System Requirements Reviews, Preliminary Design Reviews, and Critical Design Reviews to baseline the SMBA instrument avionics, scan mechanisms, and radiometer channel configurations.
- Pathfinder QuickSounder Deployment: In parallel, NOAA will advance the QuickSounder pathfinder mission in low Earth orbit, testing commercial bus compatibility, rapid data downlink pathways, and automated calibration routines that will be refined for the full SMBA instrument suite.
- Instrument Delivery and Bus Integration: Northrop Grumman will manufacture and test the three SMBA units, delivering them sequentially for integration with competitively procured NEON satellite buses managed under separate NASA commercial acquisition contracts.
- Constellation Phasing: The NEON microwave sounding constellation will begin staggered launches in the 2030s to establish overlapping operational coverage with JPSS-3 and JPSS-4, ensuring uninterrupted global thermodynamic data for numerical weather prediction through the conclusion of the contract in April 2042.
Sources
- NASA: NASA Awards Contract for NOAA’s Near Earth Orbit Network Program, checked 2026-11-23
- NOAA NESDIS: Near Earth Orbit Network (NEON) Program Overview, checked 2026-11-23
- World Meteorological Organization: Details for Satellite Programme: NEON, checked 2026-11-23
- MLQ.ai: NASA awards Northrop Grumman a $290.6 million contract to build three microwave weather sounders for NOAA, checked 2026-11-23
- Around Prague: New Weather Satellite Sensors Aim to Sharpen Forecasts Several Days Out, checked 2026-11-23







