A discharge monitoring report (DMR) is the report on which a holder of a National Pollutant Discharge Elimination System (NPDES) permit submits its self-monitoring results, such as sample measurements of its effluent, to the permitting authority. Under 40 CFR 122.41(l)(4)(i), monitoring results must be reported on a DMR, at the intervals the permit specifies, and since 21 December 2016 those reports must be submitted electronically. Each DMR value begins as a bench or field result, so laboratory records decide whether a report holds up.
Definition and scope: what a DMR is and where it sits in the NPDES program
The NPDES program is the permit program under the Clean Water Act for pollutant discharges from point sources to waters of the United States. EPA’s NPDES permit basics page describes a permit as the instrument that translates the general requirements of the Clean Water Act into specific provisions for a facility. Those provisions include limits on what can be discharged and the monitoring and reporting requirements that let regulators check whether the facility is meeting them. The DMR is the reporting half of that arrangement: the permit says what to measure and how often, and the DMR is where the measured values are reported.
NPDES permits are issued by EPA or by authorized states. EPA’s page states that EPA is the sole permitting authority in Massachusetts, New Hampshire, New Mexico, the District of Columbia, all U.S. territories except the U.S. Virgin Islands, and most Indian Country. Everywhere else the DMR goes to a state agency that holds NPDES authority, which is why state eDMR systems, forms and due dates differ even though the federal rule behind them is the same.
The regulation names the report but leaves its format to the permitting authority. Section 122.41(l)(4)(i) refers to a DMR “or forms provided or specified by the Director” for sludge use or disposal practices, so the reporting form a laboratory actually sees depends on the permit and the authority that issued it. This page covers what the federal rules require of every DMR; the permit itself governs parameters, limits, frequencies and due dates.
What is a DMR report?
A DMR report is the standard name for a discharge monitoring report: the periodic submission of required monitoring results by an NPDES permittee. The facility monitors as its permit requires, enters the results on the report, and a signatory certifies it. The permitting authority and EPA then use the reported values to assess compliance with permit limits. EPA’s permit basics page notes that the facility monitoring reports are public documents, and that citizens may sue for permit violations unless EPA or the state has already taken enforcement action.
The rule that makes the DMR mandatory is 40 CFR 122.41(l)(4): monitoring results must be reported at the intervals specified in the permit, on a DMR, and as of 21 December 2016 electronically to the Director or initial recipient. Paragraph (l)(4)(ii) adds a point that matters to laboratories: if the permittee monitors any pollutant more frequently than the permit requires, using the approved test procedures, the results of that extra monitoring must be included in the calculation and reporting of the values on the DMR. Extra samples cannot be left out because they were not required.
What is NPDES monitoring?
NPDES monitoring is the sampling and measurement a permit requires of a discharger, and the record-keeping around it. Three federal requirements shape it. First, under 40 CFR 122.41(j)(1), samples and measurements taken for monitoring must be representative of the monitored activity. Second, under 122.41(j)(4), monitoring must be conducted according to the test procedures approved under 40 CFR Part 136 (see our guide to 40 CFR Part 136 analytical methods),. Third, under 40 CFR 122.48, the permit must specify the required monitoring, including type, intervals and frequency sufficient to yield data, and the reporting frequency must be no less frequent than what 122.44 specifies.
Physical collection is part of this. Many facilities use automated samplers for composite sampling; our guide to the wastewater autosampler covers the equipment side. Analysis of parameters such as chemical oxygen demand is the other part, described in our chemical oxygen demand guide. Neither guide replaces the permit: the permit states which parameter, which sample type and how often.
What is the purpose of a discharge permit?
A discharge permit sets the legal conditions under which a point source may discharge pollutants to waters of the United States. According to EPA, an NPDES permit contains limits on what can be discharged together with monitoring and reporting requirements, and it turns the Clean Water Act’s general requirements into provisions specific to the facility. The permit is therefore both the standard (the limits) and the evidence mechanism (the monitoring and the DMR). Without the reporting requirement, limits would exist on paper with no routine way for a regulator to see whether they are met.
What is the purpose of environmental monitoring?
In the NPDES context, the purpose of environmental monitoring is to produce data that show whether a discharge meets the conditions of its permit. EPA’s permit basics page states that permittees sample their discharges and report the results to EPA and the state agency, and that they must notify regulators when they are out of compliance. Because the facility monitoring reports are public documents, the same data also serve the public and any citizen who wants to check a facility’s record. Monitoring in other settings, such as laboratory room monitoring or product environmental monitoring in manufacturing, has different purposes and different rules, so this answer applies only to permit-required effluent monitoring.
How a laboratory result becomes a DMR value
The route from a sample to a reported value passes through several people, and the federal rule asks for a record at each step. Paragraph 122.41(j)(3) requires that records of monitoring information include:
- the date, exact place and time of sampling or measurements;
- the individual or individuals who performed the sampling or measurements;
- the date or dates the analyses were performed;
- the individual or individuals who performed the analyses;
- the analytical techniques or methods used; and
- the results of those analyses.
Paragraph (j)(2) requires the permittee to keep all monitoring records, including all calibration and maintenance records, copies of reports required by the permit, and the data used to complete the permit application, for at least 3 years from the date of the sample, measurement, report or application. For sewage sludge use and disposal records the period is at least 5 years, or longer where 40 CFR Part 503 requires it. The Director can extend either period at any time.
For a laboratory, this reads as a checklist that can be applied to an existing record system. For any DMR value, can the laboratory produce the sampling date, place and time; the name of the sampler; the analysis date; the analyst; the method; the calibration and maintenance records for the instrument used; and the result? If a record system such as a standard operating procedure or logbook cannot show one of those items, that is a gap against 122.41(j). Our guide to sample chain of custody in research labs covers handling records that support the first two items.
Who signs the report and what the signature means
A DMR is not a data dump; it is a certified statement. Under 40 CFR 122.22, permit reports must be signed by the signatory the rule names or by a duly authorized representative, where the authorization is made in writing, names an individual or a position, and is submitted to the Director. The signer certifies: “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision” and that the information is true, accurate and complete. The certification also states that there are significant penalties for submitting false information, including fine and imprisonment for knowing violations.
The practical consequence for a laboratory serving a permittee is that the signer is relying on the laboratory’s records. The person who signs usually did not run the analysis, so the quality of the underlying records is what makes the certification defensible.
What happens when a DMR value is late or missing
EPA’s Enforcement and Compliance History Online (ECHO) help page explains how late values are flagged. The ICIS-NPDES data system automatically generates DMR non-receipt violations for all permittees, majors and non-majors, when a DMR value is not received within 31 days of the DMR form due date. The violation code depends on what the missing value was: D80 for a missing DMR value with a monitoring requirement and D90 for a missing DMR value with an effluent limit. EPA’s data sharing policy allows states a 40-day window to report DMR values to EPA’s data system, so values reported on time to a state and shared with EPA within 40 days do not contribute to permit-level noncompliance status.
These violations are visible to the public. The Detailed Facility Report’s Three-Year Compliance History table displays the number of D80/D90 violations in each quarter or month for the permit, regardless of resolution status. The table below separates the two codes.
| ECHO code | What is missing | When it is generated |
|---|---|---|
| D80 | A required monitoring DMR value (a parameter with a monitoring requirement only) | Value not received within 31 days of the DMR form due date |
| D90 | A DMR value for a parameter with an effluent limit | Value not received within 31 days of the DMR form due date |
Electronic reporting and other reports under the same rule
40 CFR 127.16 sets compliance dates for electronic reporting. Its Table 1 lists DMRs under 122.41(l)(4) with a compliance date of 21 December 2016. Other reports, including notices of intent, notices of termination, municipal separate storm sewer system reports, concentrated animal feeding operation reports, publicly owned treatment works pretreatment reports, sewer overflow and bypass reports, section 316(b) reports and, where state-authorized, biosolids reports, have a compliance date of 21 December 2025. Waivers granted under 127.15 and 127.24 are excluded from those dates, and EPA publishes the initial recipients by state under 127.27.
Common misunderstandings
“The DMR is just a form.”
The form is only the container. The regulation attaches representativeness, approved methods, three-year records and a signed certification to what goes into it.
“Only the required samples count.”
Under 122.41(l)(4)(ii), results from additional monitoring done with approved methods are included in the DMR calculation and reporting.
“A late value is only a paperwork problem.”
ICIS-NPDES generates D80 and D90 violations automatically, and they are counted in the three-year compliance history whether or not they have since been resolved.
“The same DMR rules apply everywhere.”
The federal rule is common, but the form, reporting system and due dates come from the permit and the permitting authority, and EPA is that authority only in the places named in its permit basics page.
Where it matters for laboratories and research groups
University and research facilities with their own NPDES-permitted discharges, and the commercial laboratories that analyze samples for permittees, are the two groups for whom the DMR becomes a laboratory concern. The environmental engineering context is covered in our guide to what environmental engineering is. For the records side, our record retention policy guide is a starting point for aligning an institution’s retention schedule with the three-year and five-year periods in 122.41(j)(2).
The data table below cross-walks the federal provisions discussed here, so a laboratory can see in one place which provision creates which duty.
Frequently asked questions
What is the purpose of environmental monitoring?
For a permitted discharge, it produces the data that show whether the discharge meets its permit. EPA states that permittees sample their discharges, report to EPA and the state agency, and notify regulators when they are out of compliance.
What is the purpose of a discharge permit?
An NPDES permit translates the Clean Water Act’s general requirements into specific provisions: limits on what can be discharged, plus monitoring and reporting requirements.
What is a DMR report?
It is the discharge monitoring report on which an NPDES permittee reports its required monitoring results at the intervals the permit specifies (40 CFR 122.41(l)(4)(i)). It is signed and certified under 40 CFR 122.22.
What is NPDES monitoring?
It is the permit-required sampling and measurement of a discharge, using samples representative of the monitored activity and approved test procedures, with records kept for at least three years (40 CFR 122.41(j)).
Sources
- U.S. EPA: NPDES Permit Basics, checked 2026-11-19
- Legal Information Institute (Cornell): 40 CFR 122.41, Conditions applicable to all permits, checked 2026-11-19
- Legal Information Institute (Cornell): 40 CFR 122.22, Signatories to permit applications and reports, checked 2026-11-19
- Legal Information Institute (Cornell): 40 CFR 122.48, Requirements for recording and reporting of monitoring results, checked 2026-11-19
- Legal Information Institute (Cornell): 40 CFR 127.16, Electronic reporting compliance dates, checked 2026-11-19
- U.S. EPA ECHO: DMR Non-Receipt Violations help, checked 2026-11-19
Data: Federal provisions governing an NPDES discharge monitoring report
A cross-walk of the federal regulations that govern DMRs, compiled from the text of 40 CFR 122.41, 122.22, 122.48 and 127.16, giving for each provision what it requires and which step of the sample-to-DMR route it affects.
Coverage: United States.
| Provision | What it requires | Step it affects |
|---|---|---|
| 40 CFR 122.41(j)(1) | Samples and measurements must be representative of the monitored activity | Sampling |
| 40 CFR 122.41(j)(2) | Keep monitoring information including calibration and maintenance records, reports and application data at least 3 years (sewage sludge records at least 5 years) | Record retention |
| 40 CFR 122.41(j)(3) | Records include date, exact place and time of sampling; sampler; analysis dates; analyst; methods; results | Record content |
| 40 CFR 122.41(j)(4) | Monitoring conducted according to test procedures under 40 CFR Part 136 | Analysis |
| 40 CFR 122.41(l)(4) | Report monitoring results on a DMR at the permit's intervals; electronic from 21 December 2016; extra approved-method results are included | Reporting |
| 40 CFR 122.22 | Reports signed by a signatory or duly authorized representative with a certification under penalty of law | Certification |
| 40 CFR 122.48 | Permit must specify monitoring type, intervals and frequency sufficient to yield data, and reporting frequency | Permit design |
| 40 CFR 127.16 Table 1 | DMR electronic reporting compliance date 21 December 2016; other listed reports 21 December 2025 | Electronic submission |
Sources
- 40 CFR 122.41 (accessed 2026-11-19)
- 40 CFR 122.22 (accessed 2026-11-19)
- 40 CFR 122.48 (accessed 2026-11-19)
- 40 CFR 127.16 (accessed 2026-11-19)
Compiled by CASRAI from the sources above. Free to reuse under CC BY 4.0 with attribution.