Interim project review

A formal, funder-initiated progress check conducted at a defined mid-point of a multi-year project -- assessing whether work is on track against the plan and informing continuation, adjustment, or corrective-action decisions -- distinct from the routine interim report it draws on and from the end-of-project review held at project close.

ByCASRAI Editorial Board
· Last updated 5 Sept 2026
Share this

Ask CASRAI · free to try

Ask about Interim project review

Ask your first 2 questions free below. Subscribers get 150 a day for $29 a month.

An AI assistant specialized in research administration. It cites the sources behind every answer, labels web answers and says when it can't answer.

Answers draw on CASRAI's guides and dictionary plus the federal and funder documents we index: Federal Register, Grants.gov, Regulations.gov and UKRI.

Works on this site and inside Claude, Cursor and the AI tools you already use.

Everything CASRAI publishes — this page, the dictionary, the guides and the news — stays free to read, with no account and no card.

Examples

Worked examples

  • Is an instance

    A Horizon Europe project undergoes a periodic technical review at month 18, attended by two external experts and the Project Officer.

  • Is an instance

    An ERC Consolidator Grant has a mid-term review at month 30 of a 60-month grant.

Counter-examples

Looks similar, but isn't

  • Not an instance

    Routine internal consortium meetings are not formal interim reviews.

  • Not an instance

    A closeout final review is end-of-project, not interim.

Editorial commentary

An interim project review is a formal progress check a funder conducts at a set point during a multi-year project’s life — not at the end, and not on a whim, but at a mid-point defined in the award terms. It exists to confirm the project is on track before the funder commits further resources or lets it continue unchanged.

Timing

The timing is fixed by the mechanism, not the recipient. Horizon Europe projects can undergo a periodic technical review at a defined point (for example, month 18 of a multi-year action), attended by external experts and the Project Officer. ERC Consolidator Grants include a mid-term review, commonly around the midpoint of the award’s typical five-year (60-month) duration.

What it produces

Unlike a routine reporting cycle, an interim project review can require a corrective action plan if progress is judged insufficient, and for genuinely renewable multi-year mechanisms it can influence whether continued funding proceeds as planned. It is a heavier-weight check than an ordinary periodic report review.

vs. the interim report

The review and the report are not the same thing. The interim report is the document — narrative and financial content covering a defined reporting period. The interim project review is the evaluative process built around that document, often including a live meeting or panel assessment that goes beyond simply reading the submitted report.

vs. end-of-project review and impact evaluation

An end-of-project review asks the same “on track against the plan” question, but only once, at the project’s conclusion, rather than at a mid-point with the project still running. An impact evaluation is a different exercise again — broader in scope, later in timing, and typically conducted independently of the project’s own reporting cycle.

Also known as

Periodic review · Mid-project review · Interim review · Periodic technical review

Machine-readable encodings

Use in your systems

JATS XML <role> element
xml
<role vocab="credit"
      vocab-identifier="https://casrai.org/dictionary/"
      vocab-term="Interim project review"
      vocab-term-identifier="https://casrai.org/dictionary/term/interim-project-review" />
Schema.org DefinedTerm (JSON-LD)
json
{
  "@context": "https://schema.org",
  "@type": "DefinedTerm",
  "@id": "https://casrai.org/dictionary/term/interim-project-review",
  "name": "Interim project review",
  "identifier": "https://casrai.org/dictionary/term/interim-project-review",
  "description": "A formal, funder-initiated progress check conducted at a defined mid-point of a multi-year project -- assessing whether work is on track against the plan and informing continuation, adjustment, or corrective-action decisions -- distinct from the routine interim report it draws on and from the end-of-project review held at project close.",
  "inDefinedTermSet": "https://casrai.org/dictionary/domain/research-lifecycle#set",
  "url": "https://casrai.org/dictionary/term/interim-project-review",
  "alternateName": [
    "Periodic review",
    "Mid-project review",
    "Interim review",
    "Periodic technical review"
  ],
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "publisher": {
    "@id": "https://casrai.org/#organization"
  },
  "author": {
    "@id": "https://casrai.org/#editorial-team"
  },
  "datePublished": "2026-05-21T02:23:00",
  "dateModified": "2026-09-05T14:27:07",
  "inLanguage": "en-GB",
  "isAccessibleForFree": true
}

Referenced across the research world

University of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logoUniversity of Cambridge logoColumbia University logoCrossref logoUniversity of Edinburgh logoHarvard University logoUniversity of Oxford logoPrinceton University logoStanford School of Medicine logoUniversity College London logoORCID logo
  • University of Cambridge logo
  • Columbia University logo
  • Crossref logo
  • University of Edinburgh logo
  • Harvard University logo
  • University of Oxford logo
  • Princeton University logo
  • Stanford School of Medicine logo
  • University College London logo
  • ORCID logo

View CASRAI adoption →

Ask CASRAI · Regulatory Radar

Research-admin question? Get an answer that links its sources.

An AI assistant specialized in research administration. Every answer links its sources to check before you act. 2 questions free, no account. $29/month after.

  • Answers draw on CASRAI's guides and dictionary plus the federal and funder documents we index: Federal Register, Grants.gov, Regulations.gov and UKRI.
  • Every answer numbers its sources and links each one, so you can check the source yourself.